Laserfiche WebLink
d t 8 <br /> SUIriIriarV Table <br /> Forward Landfill Permitted—SWFP Cover from ADC=23% 1) All of the requested tonnage records have not yet <br /> 39-AA-0015 allows tarps. RDSI if C&D ADC is included been received. <br /> dated 2000 allows or 21%if not. 2) RDSI may need to included C&D ADC as a <br /> green material,and listed ADC or tonnage specified as C&D ADC <br /> shredded tires. If soil accepted is on DRS may need to be recalculated as <br /> Actual—Green included then 61%of the beneficial use. <br /> material and maybe total cover needs were 3) Cover materials need to be applied daily. <br /> C&D obtained from off-site. 4) Working face may need to be reduced in size. <br /> 5) An RDSI amendment should be submitted with <br /> adequate supporting information on cover/ADC <br /> types and quantities. <br /> 6) LEA did visit the site with Board staff. <br /> *The calculations for ADC soil/cover accepted as a%of the annual cover needs is based on the working <br /> face size(either measured at the facility on the day of the survey or that which is described in the RDSI) <br /> and the volume of`soil' required to provide a six inch average thickness for this area for the number of <br /> days the facility would require cover during the year. ADC/soil accepted information either submitted by <br /> the LEA,operator,or obtained from the DRS was then compared to the calculated amounts to develop a <br /> percentage. ADC material was converted to a soil equivalent based upon the conversion table above <br /> titled,Cover Soil or Soil Equivalent to provide for the coverage differences because of the differences in <br /> weight and average depth allowed for the ADC materials. <br /> 4 <br />