Laserfiche WebLink
3. Long Term Availability of a sufficient amount of soil for use as <br /> cover. <br /> The response needs to include calculations of the estimated volume of cover <br /> material that the site will need throughout its active life. Provide information <br /> on the sources of cover material onsite and offsite. Provide information on the <br /> types and quantities of ADC that will be utilized onsite. Provide information <br /> on source of ADC actual and potential. The stockpile of cover material can be <br /> shown on a plot plan if onsite sources are to be used. If offsite sources are to <br /> be used the written description must describe types of cover material needed <br /> for five (5) year duration. Most of this information can be found in the RDSI. <br /> The EHD requests that the calculations be corrected or adjusted for any <br /> changes that have occurred since the calculations were initially done. <br /> 4. C&D material used as wet weather decking being reported as <br /> ADC. <br /> No changes need for this response. <br /> S. The lack of sufficient cover on the active face on the day of the <br /> survey. <br /> The response needs to include references to how Forward Inc. personnel <br /> will accomplish this (inspections, by whom, any checks and balances that <br /> are employed by the site to ensure that the site will receive adequate daily <br /> cover). <br /> If you have any question regarding this issue you can contact my Lead <br /> Senior, Michael Kith at (209) 468-3444 <br /> Robert McClellon, Supervising REHS <br /> Environmental Health Department <br /> Page 2 of 2 <br />