Laserfiche WebLink
i� <br />1. Grinding Pad <br />R & R's grinding pad is a one (1) acre cement pad. The cement pad has been <br />constructed in such a way that water flows to the Northwest Corner where it <br />transfers to a ditch and is delivered to a sediment pond located South of the <br />South Fork of Little John's Creek in the Western Corner of R & R. <br />2. Compost Pad <br />Composting continues on a yearlong schedule on Forward's Winterized <br />Composting Pad. Run-off from the pad is directed to the sediment pond <br />through ditches on both the North and South side of the Composting Pad. <br />3. Sediment pond <br />All water having been directed to Forward R&R sedimentation pond is <br />sampled and analyzed in accordance with Forward's Stormwater Pollution <br />Prevention Plan and Stormwater Monitoring Plans, prior to discharge to the <br />South Fork of Little John's Creek. A log is kept on site recording the volume <br />of Stormwater discharged to the creek. <br />Winter2000-2001.doc <br />