My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085508 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIO BLANCO
>
8095
>
2900 - Site Mitigation Program
>
SR0085508 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 4:40:02 PM
Creation date
10/25/2022 4:25:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085508
PE
2903
FACILITY_ID
FA0027252
FACILITY_NAME
STOCKTON WESTLAKE INVESTMENTS
STREET_NUMBER
8095
Direction
N
STREET_NAME
RIO BLANCO
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06605042
ENTERED_DATE
7/8/2022 12:00:00 AM
SITE_LOCATION
8095 N RIO BLANCO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oe�ftIkr14 GAVIN NEWSOM <br /> J GOVERNOR <br /> C 0.L I f 0 R M I AJAIREu BLUMENFELD <br /> SECRETARRY FOR <br /> Water Boards ENVIRONMENTAL PROTECTION <br /> Central Valley Regional Water Quality Control Board <br /> 5 March 2021 <br /> Stockton Westlake Marina LLC Howard Weinberg <br /> 10100 Trinity Parkway #5 Peloria Paradise Point LLC <br /> Stockton, CA 95219 2550 Via Tejon, Suite 2B <br /> Palos Verdes Estates, CA 90274 <br /> REVIEW OF 3 MARCH 2021 WORK PLAN FOR THE PARADISE POINT MARINA, <br /> 8095 RIO BLANCO ROAD, STOCKTON, SAN JOAQUIN COUNTY <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff <br /> reviewed the 3 March 2021 Supplemental LNAPL Delineation, Grab-Groundwater and <br /> Sub-Slab Vapor Investigation Work Plan (March 2021 Work Plan), submitted by PES <br /> Environmental, Inc. (PES), for the Paradise Point Marina, located at 8095 Rio Blanco <br /> Road in Stockton (Site). PES prepared the March 2021 Work Plan which proposes a <br /> scope-of-work to further evaluate Site conditions and expand upon the recent <br /> investigation activities presented in the 16 December 2020 LNAPL Corrective Action <br /> Plan. <br /> Central Valley Water Board staff concurs with the methods and approach proposed by <br /> PES in the March 2021 Work Plan with the following conditions and comments: <br /> • You should include photo-documentation of the vapor probe and associated <br /> sampling equipment (i.e., sampling train and leak-testing shroud) in the resulting <br /> Revised Corrective Action Plan. <br /> • In addition to the proposed sub-slab vapor sample analytical compounds listed in <br /> Section 2.3.2.1 of the March 2021 Work Plan, you should also analyze for vapor- <br /> phase naphthalene and methyl tert-butyl ether (MTBE) using EPA Method TO-15. <br /> • Following sub-slab vapor sample collection, you should consider leaving the vapor <br /> probe in-place to allow for collection of an additional vapor sample during warmer <br /> months to assess for seasonal variability of potential contaminant concentrations. At <br /> least two sub-slab sampling events should be performed before a final risk <br /> determination can be made. <br /> • Central Valley Water Board staff concurrence of the March 2021 Work Plan is based <br /> on the locations and scope-of-work presented therein. Significant changes to either <br /> KARL E. LONGLEY SCD, P.E., CHAIR I PATRICK PULUPA, ESQ., EXECUTIVE OFFICER <br /> 11020 Sun Center Drive#200, Rancho Cordova, CA 95670 1 www.waterboards.ca.gov/centralvalley <br />
The URL can be used to link to this page
Your browser does not support the video tag.