My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084051 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
SR0084051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 1:19:52 PM
Creation date
10/26/2022 1:17:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084051
PE
2903
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT OFF SITE EXTRACTION WELL INSTALLATION
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
94523
APN
19802001
ENTERED_DATE
8/10/2021 12:00:00 AM
SITE_LOCATION
700 ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP-011 Standard Operating Procedure <br />Water Level Measurements in Monitoring Wells Page 3 of 6 Revision No. 0 March 2020 <br /> <br />Sharpe Army Depot <br />permanently fixed structure or from ground level. The point of measurement should then be noted on the FADL and the appropriate form on which the water level is recorded. For flush mount completions, such as street boxes, the water level measurement should be referenced to a steel plate placed across the rim of the street box and over the casing. Any aboveground completions without permanent reference points or marks should be brought to the attention of the appropriate supervisory personnel per the project-specific work plans. <br />Collect measurements until two consecutive measurements are identical or within the specified tolerance of the project-specific work plans (usually 0.01 ft). <br />4.6 Record <br />Record all appropriate information on either the Water Level Measurement Form, Well Development Record, or the Sampling Information Form, depending upon the task being performed. At a minimum, the following information must be recorded: <br />• Project name and number; <br />• Unique well identification number; <br />• Date and time of measurement collection; <br />• Depth to water to the specified tolerance; <br />• Weather conditions; and <br />• Any problems encountered <br />If product or other nonaqueous liquid is encountered, follow the procedures outlined in this SOP. <br />4.7 Post-Operation <br />Cap and relock the well after measurements are complete. <br />5.0 Records <br />Records generated as a result of this SOP will be controlled and maintained in the project records files.
The URL can be used to link to this page
Your browser does not support the video tag.