My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084051 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
SR0084051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 1:19:52 PM
Creation date
10/26/2022 1:17:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084051
PE
2903
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT OFF SITE EXTRACTION WELL INSTALLATION
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
94523
APN
19802001
ENTERED_DATE
8/10/2021 12:00:00 AM
SITE_LOCATION
700 ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP-012 Standard Operating Procedure <br />Aquifer Testing Page 5 of 18 <br />REVISION NO. 0 <br />March 2020 <br /> <br />Sharpe Army Depot <br /> <br />Wellhead Flow Meter - A meter installed in the water discharge line near the wellhead to measure the discharge (in volume/time) of water by the mechanical pump and controlled by the flow regulator. <br /> Procedure <br />This section contains responsibilities, requirements, and procedures for conducting aquifer testing. Slug, specific capacity, and pumping tests are commonly used testing methods to determine the hydrologic characteristics of confined and unconfined aquifers. Consequently, these methods are covered in this section. <br />All aquifer testing to be conducted at a site must incorporate and be tailored to: <br />• Known or expected site-specific conditions <br />• Targeted parameters to be evaluated <br />• Analysis methodology(ies) to be conducted with the test data <br />Consequently, these factors must be considered, and the tests designed well before generation of the project work plans and implementation in the field. The project work plans will specify all necessary details to complete the aquifer testing at a particular site. Aquifer testing information and specifications to be included in the project work plans will include at a minimum the following: <br />• Objectives of the aquifer testing <br />• Aquifer parameters to be evaluated <br />• Type(s) of aquifer tests to be conducted <br />• Exact wells to be used for aquifer testing <br />• Equipment used <br />• Type, duration and frequency of measurements to be made <br />• Additional procedures or requirements beyond those covered in this SOP <br />At a minimum, the following requirements, responsibilities, and procedures described in the following section must be incorporated into the aquifer testing conducted at each site. <br />3.1 Responsibilities <br />The field task lead and registered/professional geologist are responsible for ensuring that all aquifer testing activities are conducted and documented in accordance with this SOP and any other appropriate procedures, as applicable. Adherence to this SOP will be accomplished through staff training and by maintaining quality assurance/quality control (QA/QC).
The URL can be used to link to this page
Your browser does not support the video tag.