My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084051 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
SR0084051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 1:19:52 PM
Creation date
10/26/2022 1:17:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084051
PE
2903
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT OFF SITE EXTRACTION WELL INSTALLATION
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
94523
APN
19802001
ENTERED_DATE
8/10/2021 12:00:00 AM
SITE_LOCATION
700 ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP-012 Standard Operating Procedure <br />Aquifer Testing Page 17 of 18 <br />REVISION NO. 0 <br />March 2020 <br /> <br />Sharpe Army Depot <br /> <br />of field generated drawdown versus time plots from the pumping and observation wells. <br />• Once the pumping phase is completed, re-set the data loggers for the recovery period recording duration and frequencies as specified in the project work plans. Obtain a water level measurement in each of the wells with the electric well tape and record the measurements and times. Shut down the mechanical pump. Record the time that the pump was shut down on the appropriate form. <br />• Continue to record the water level recovery in the wells with the pressure transducers and data loggers as long as is required by the project work plans or until the water levels have recovered to within 90 percent of the level expected from the pre-test trends. Also, continue to take physical water level measurements periodically during recovery. Once the recovery period is ended, take a physical water level measurement in each well at the end of the test. Enter the measurements and times on the appropriate form. <br />• The project work plans may require additional depth to water measurements to be physically taken following complete well recovery in order to monitor post-test trends in water level. The project work plans will specify the frequency of measurements, and the length of time that the measurements must be taken. <br />• The data should be reviewed in the field to help ensure the validity of the test. Complete all documentation on the appropriate form as outlined in the project work plans. <br />• Once the pumping test is satisfactorily completed for the wells, all downhole equipment may be removed and the wellheads secured. <br /> Records <br />Records generated as a result of this SOP will be maintained in the Project Records file.
The URL can be used to link to this page
Your browser does not support the video tag.