Laserfiche WebLink
Ahtna Environmental, Inc. Page 2 of 3 <br /> <br /> Pumping Test Data Sheet <br /> <br />Installation:_______________________ Project number:____________________ Well Diameter:__ Measuring Point:______ Pump Setting:________ Pump on Date:_______ Screen Interval(s):_____ Pump Off Date:_______ Discharge Flow Meter Model/Units:______ <br />Project:____________________________ Well Location:_______________________ Measured by:_______________________ Pump On Time:_____________________ Pump Off Time:______________________ Duration of Aquifer Test:______________ <br />Event:_______________________ Static Water Level(ft bmp):_______ Elevation Measuring Point(ft):_____ Available Drawdown:____________ Distance from Pumping Well:_____ Initial Totalizer Reading:__________ <br /> <br />Time of <br />Measurement <br />Time Since Pumping <br />Started(t) (minutes) <br />Sounder <br />Reading(feet) <br />Discharge(gpm) Totalizer <br />Reading(gallons) <br />Remarks <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Well ID: ________________________ <br /> <br /> <br />Test Type______________________________