Laserfiche WebLink
SOP-008 Standard Operating Procedure <br />Well Development Page 4 of 5 REVISION NO. 0 March 2020 <br /> <br />• Well designation <br />• Date of well installation <br />• Date of development <br />• Static water level before and after development <br />• Quantity of drilling fluid lost during drilling <br />• Well volume <br />• Depth from top of well casing to bottom of well <br />• Screen length <br />• Depth from top of well casing to bottom of well <br />• Physical character of removed water, including changes during development in clarity, color, particulates, and odor <br />• Type and size/capacity of pump and/or bailer used <br />• Height of well casing above/below ground surface <br />• Typical pumping rate <br />• Estimate of recharge rate <br />• Quantity of water removed and time for removal <br />5.2 Developed Water Management <br />Manage development water generated during well development as IDW, in accordance with the designated work plan or Site Waste Management Plan.