Laserfiche WebLink
ffN <br /> ir <br /> Building214 <br /> -4r_ <br /> ------ _ =�_— �wo2o wo79 W-o78 <br /> 11-in314 !' �_—+ _ _ ----- - - -- rr �__` -- ___ - _ _ <br /> g _ P-177P 173 <br /> _z�_�- --- - -- _ - - 0-- - - — _ _l - _ P-` 004 <br /> �W-080 <br /> X332 <br /> _ - - �_ _ = - -r q'�� -- • _ — - ",' �.._ PMW 02/�W 333 VV-058 • .. <br /> - t- -• � �- s- W-081 <br /> / W-106 <br /> / -_ • W-108 <br /> •.W-112 <br /> -� W-331 <br /> / <br /> -214 W <br /> Y, <br /> W-109 <br /> -215 <br /> Y <br /> Legend Notes <br /> W-099=Well ID W-334 <br /> Monitoring Well(will be gauged in 3Q22) VOCs=Volatile Organic Compounds <br /> Monitoring Well(will be sampled for W-110 75 37.5 0 75 Feet <br /> VOCs in 3Q22) <br /> Piezometer(will be gauged in 3Q22) <br /> Piezometer(will be sampled for { Site 4 Sampling Locations <br /> VOCs in 3Q22) <br /> cis-1,2-DCE concentration greater <br /> 7 2022 Groundwater Monitoring Work Plan <br /> nthan 6 Ng/L dashed where inferred W-218 Rough and Ready Island,Port of Stockton <br /> Vinyl Chloride concentration greater t,-;•Ar Stockton,California <br /> R than 0.5 Ng/L-dashed where inferred r` <br /> Drainage Channel Geosptec <br /> Figure <br /> 1--I Approximate Excavation Area <br /> Building 216 r consultants <br /> y Contamination Sites �� •I' "'r4 25u Imagery Source:Google Earth,2018 I '� -.- Project No.:WR2501 B June 2022 <br />