My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084701
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
1345
>
2900 - Site Mitigation Program
>
SR0084701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 1:42:30 PM
Creation date
10/26/2022 1:34:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084701
PE
2903
FACILITY_ID
FA0026941
FACILITY_NAME
LODI SOUTHERN PLUME (LSP) SOIL VAPOR SAMPLING
STREET_NUMBER
1345
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04530032
ENTERED_DATE
1/6/2022 12:00:00 AM
SITE_LOCATION
1345 S SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Vapor Sampling Work Plan Page 5 <br /> LSP Area,Lodi,California <br /> October 13,2021 <br /> Upon completion of sampling activities, temporarily well points will be abandoned by removing <br /> temporary well points and sealing the borehole with a neat cement grout or by using the appropriate <br /> method approved by SJDEH. <br /> SCHEDULE AND REPORT PREPARATION <br /> CHT and the City request the Water Board's concurrence with our Work Plan to perform the soil <br /> vapor sampling at the proposed locations specified in Figure 2 at your earliest convenience. <br /> Following written approval of this Work Plan by the Water Board, requests for location access <br /> will be sent out to the applicable building owners. Soil vapor sampling will be conducted within <br /> three (3) weeks of receipt of the location access letters. Laboratory sample results should be <br /> available within a week following sample submission. <br /> A letter report documenting the soil vapor sampling activities, a summary of the results of the soil <br /> vapor sampling, and design of the proposed SVE pilot test extraction wells will be prepared and <br /> submitted to the Water Board within three (3)weeks of receipt of the laboratory analysis. A copy <br /> of the report and associated laboratory and boreholeinformation will be uploaded to GeoTracker. <br /> Please do not hesitate to contact Varinder Oberoi at (415)424-3009 with any questions regarding <br /> this Work Plan. <br /> Sincerely, <br /> CIVIL uyurC TECH <br /> Varinder Oberoi, PE C69037 <br /> Principal Hydrologist <br /> Attachments: <br /> Figure 1 — Site Location <br /> Figure 2 — Site Map <br /> Figure 3 — Proposed Soil Vapor Sampling Probe Locations&PSG Sampling PCE Concentration <br /> Figure 4 — Proposed Soil Vapor Sampling Probe Locations&PSG Sampling TCE Concentration <br /> 175 N EL MONTE AVENUE,LOS ALTOS,CA 94022 TEL:415-424-3009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.