My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084975 (5)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STATEN ISLAND
>
20250
>
2900 - Site Mitigation Program
>
SR0084975 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 2:10:26 PM
Creation date
10/26/2022 2:04:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084975
PE
2903
FACILITY_ID
FA0027045
FACILITY_NAME
1992 NORTH DELTA SEEPAGE MONITORING
STREET_NUMBER
20250
Direction
N
STREET_NAME
STATEN ISLAND
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
06902019
ENTERED_DATE
3/9/2022 12:00:00 AM
SITE_LOCATION
20250 N STATEN ISLAND RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1992 North Delta Seepage Monitoring Work Plan <br /> I am submitting this work plan for the destruction of well ND-45 on the <br /> Staten Island Delta seepage monitoring well. I am requesting approval <br /> to destroy this monitoring well as follows. <br /> Excavate down around the 2 inch pvc monitoring well to the depth of 2 <br /> foot below grade, due to inaccessibility of well location with backhoe. I <br /> will next set 1 inch trim pipe down the bottom of the well and funnel <br /> neat cement at 5 to 6 gallons of water per 941b bag until concrete <br /> reaches the surface of the well. Next we will seal the well and <br /> pressurize the grout mix, attempting to force the grout out of the well. <br /> Once the inspector is satisfied with this I will remove the pressure and <br /> cut the casing off 2 foot below grade and mushroom cap the seal. Once <br /> this step is completed I will backfill the hole to surface grade. <br />
The URL can be used to link to this page
Your browser does not support the video tag.