Laserfiche WebLink
Human Services Agency - 3 - 2 August 2021 <br /> 145 South Sutter Street <br /> Stockton, San Joaquin County <br /> 7. Prior to implementation of remedial actions, a mandated 30-day public comment <br /> period needs to be completed by distributing a Public Notice Fact Sheet. In the <br /> Fact Sheet, please include the following information related to the Site project: <br /> • Site name, location, and case information. <br /> • The dates of the public comment period (30 days). <br /> • A brief case summary. <br /> • A brief description of proposed remedial actions. <br /> • Contact information for those wishing to receive more information related to <br /> the case. <br /> • A figure depicting the current maximum extent of hydrocarbon impact to <br /> groundwater and the proposed remedial treatment area. <br /> By 3 September 2021, please submit, via email to Central Valley Water Board <br /> staff, a draft Fact Sheet for public distribution and a proposed distribution list that <br /> includes all responsible parties, owners and occupants of the property impacted <br /> by the petroleum release, the owners and occupants of all parcels adjacent to the <br /> impacted property, and this office. <br /> 8. Central Valley Water Board staff will begin preparing a Notice of Applicability <br /> (NOA) and a Monitoring and Reporting Program (MRP) for permit coverage <br /> under the Order. A draft copy of the MRP will be provided to you for review and <br /> comment prior to issuance. <br /> Based on proposals presented in the Work Plan and Revised Addendum, as well as <br /> Central Valley Water Board staff comments above, staff understands the BOS-200 <br /> remediation scope of work to be as summarized in Tables 1-6 below. <br /> Table 1 — Summary of Injection Points <br /> Injection Points Drilling Method Purpose Location Injection Interval <br /> BOS-200 Triangular grid <br /> IP-1 thru IP-10 Direct Push Injection around MW-2 18-43 ft bgs <br /> with 6ft spacing <br /> ft= feet; bgs= below ground surface <br /> Table 2 — Summary of BOS-200 Injections <br /> Injection Points <br /> Number of injection points 10 <br /> Total injection interval depth 18-43 ft b s <br /> Total injection interval length 25 ft <br /> Discrete injection interval verticalspacing Every 2 ft <br /> Number of discrete injection intervals per point 13 <br />