My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085504
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
SR0085504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 2:45:32 PM
Creation date
10/27/2022 2:17:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085504
PE
2903
FACILITY_ID
FA0025329
FACILITY_NAME
SAN JOAQUIN COUNTY HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
NEAR 14912010
ENTERED_DATE
7/8/2022 12:00:00 AM
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Human Services Agency - 5 - 2 August 2021 <br /> 145 South Sutter Street <br /> Stockton, San Joaquin County <br /> Table 4 — Summary of Remedial Monitoring Groundwater Analysis <br /> Suite A <br /> (Hydrocarbons) TPHg, TPHd, BTEX, MTBE, naphthalene <br /> Suite B dissolved metals, total chromium, hexavalent chromium, <br /> (Remedial Indicators) TDS, bromide, bromate, sulfate, nitrate <br /> Field Measurements Depth to water, DO, ORP, EC, temp, pH <br /> TPHg= total petroleum hydrocarbons as gasoline; TPHd= total petroleum hydrocarbons as <br /> diesel; BTEX= benzene, toluene, ethylbenzene, xylenes; TDS= total dissolved solids; <br /> DO= dissolved oxygen; ORP= oxygen reducing potential; EC= electrical conductivity; <br /> temp= temperature <br /> Table 5 — Summary of Remedial Monitoring <br /> Monitoring Monitoring Wells <br /> Zone (Screen Interval) Analysis Frequency <br /> Suite A; Suite B; <br /> Treatment MW-2 (30-45 ft bgs) Field 2x Baseline; 1, 2, 3, 6, 9, & 12 <br /> MW-10 (94-104 ft bgs) months after injection <br /> Measurements <br /> Transition -- -- -- <br /> Compliance MW-6 (40-60 ft bgs) Field Suite A; Suite B; 2x Baseline; 1, 2, 3, 6, 9, & 12 <br /> MW-7 (43-63 ft bgs) months after injection <br /> Measurements <br /> Suite B; 3 6 <br /> Background MW-3A (37-57 ft bgs) Field 2x Baseline; , & 12 <br /> MW-9 (35-55 ft bgs) months after injection <br /> Measurements <br /> Table 6 — Summary of Contingency Plan <br /> When Action 1 Action 2 Action 3 Action 4 <br /> Implemented <br /> Concentrations of Collect Batch Extraction <br /> selected remedial confirmation of 2,000 gallons3 Sample If <br /> parameters' sample from from wells with compliance exceedances <br /> exceed Action wells with continued wells 30 days remain, <br /> Level S2 by 20% in exceedances exceedances following repeat <br /> Compliance Zone 30 days after following batch Actions 1 <br /> wells initial confirmation extraction through 3 <br /> exceedance sampling <br /> 1= Total chromium, hexavalent chromium, bromate, nitrate, sulfate <br /> 2= Action Levels to be determined by baseline sampling <br /> 3= Each batch extraction event will consist of the removal of 2,000 gallons or an effort <br /> of 5 days, whichever occurs first. <br />
The URL can be used to link to this page
Your browser does not support the video tag.