My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084185 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6471
>
2900 - Site Mitigation Program
>
SR0084185 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 4:10:35 PM
Creation date
10/27/2022 3:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084185
PE
2903
FACILITY_ID
FA0026300
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
6471
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741079
ENTERED_DATE
9/7/2021 12:00:00 AM
SITE_LOCATION
6471 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosptec <br /> consultants <br /> b. SCHEDULE <br /> Geosyntec proposes the following schedule for implementation of the scope of work described in <br /> this Work Plan. This schedule is tentative and subject to change depending on the timeline for <br /> obtaining Work Plan approval from the CVRWQCB, permitting with San Joaquin County <br /> Environmental Health Department, subcontractor schedule, equipment lead-time, and subsequent <br /> SVE activities. <br /> Task Proposed Implementation Period <br /> SVE Well Installation Early September 2021 <br /> SVE Pilot Test Mid-Late September 2021 <br /> Post-Pilot Test Performance Monitoring November 2021 (first monitoring event) <br /> First Performance Assessment Report 30 days after receipt of laboratory results from <br /> first monitoring event <br /> Follow-up Performance Assessment Report 30 days after receipt of laboratory results from <br /> the second and third monitoring events <br /> CVAPCD Permitting 1-2 months <br /> Additional SVE Operation and Rebound To be determined <br /> Monitoring <br /> ISCO Injections To be determined <br /> Northern Parking Lot Remedial Plan I I August 6,2021 <br />