My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084185 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6471
>
2900 - Site Mitigation Program
>
SR0084185 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 4:10:35 PM
Creation date
10/27/2022 3:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084185
PE
2903
FACILITY_ID
FA0026300
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
6471
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741079
ENTERED_DATE
9/7/2021 12:00:00 AM
SITE_LOCATION
6471 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultarns <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION....................................................................................................................1 <br /> 1.1 Work Plan Objectives and Regulatory Framework.........................................................1 <br /> 2. BACKGROUND......................................................................................................................2 <br /> 3. RATIONALE, OBJECTIVES, AND APPROACH.................................................................3 <br /> 3.1 Rationale..........................................................................................................................3 <br /> 3.2 Objectives........................................................................................................................4 <br /> 3.3 SVE Approach.................................................................................................................4 <br /> 3.4 ISCO APPROACH..........................................................................................................5 <br /> 4. SCOPE OF WORK...................................................................................................................6 <br /> 4.1 Pre-Field Activities..........................................................................................................6 <br /> 4.1.1 Health and Safety ................................................................................................6 <br /> 4.1.2 Permitting............................................................................................................6 <br /> 4.1.3 Utilities................................................................................................................6 <br /> 4.2 SVE Well Installation......................................................................................................7 <br /> 4.3 SVE Pilot Test Setup.......................................................................................................7 <br /> 4.4 SVE Pilot Test.................................................................................................................7 <br /> 4.5 Post-SVE Performance Monitoring.................................................................................8 <br /> 4.6 Potential Future ISCO Scope of Work............................................................................9 <br /> 4.7 Waste Management.........................................................................................................9 <br /> 5. REPORTING..........................................................................................................................10 <br /> 6. SCHEDULE ...........................................................................................................................1 l <br /> 7. REFERENCES.......................................................................................................................12 <br /> LIST OF FIGURES <br /> Figure 1: Site Location Map <br /> Figure 2: Soil Vapor Sample Locations and PCE Analytical Results <br /> Figure 3: Site Plan and SVE Pilot Test Layout <br /> Figure 4: Process Flow Diagram <br /> Northern Parking Lot Remedial Plan Iii August 6,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.