My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083445 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4555
>
2900 - Site Mitigation Program
>
SR0083445 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 4:26:51 PM
Creation date
10/28/2022 4:07:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0083445
PE
2903
FACILITY_ID
FA0026288
FACILITY_NAME
VENETIAN SQUARE
STREET_NUMBER
4555
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017001
ENTERED_DATE
3/23/2021 12:00:00 AM
SITE_LOCATION
4555 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VENETIAN SQUARE <br />4555 NORTH PERSHING AVENUE <br />STOCKTON, CALIFORNIA 95207 <br />4 <br />CONSTRUCTION DETAIL FOR VAPOR <br />MONITORING POINT <br />SLR Consulting USA Pty Ltd <br />Project No.117.02446.00007 <br />Rev 1.0 Figure No.February 2021 <br />Existing <br />subgrade <br />Slab Depth <br />Existing <br />concrete slab <br />1.5" hole (Note 3) <br />5/8" hole (Note 4) <br />Secure cover <br />(Note 2) <br />Vapor Pin <br />(Note 1) <br />NOTES: <br />1. Install vapor monitoring point to be stainless steel Vapor Pin which <br />includes a 1/4" diameter barb port per manufacturer recommendations. <br />Port to be sealed with rubber cap when not in use. <br />2. Install stainless steel secure cover compatible with Vapor Pin per <br />manufacturer recommendations. Requires spanner to open cover. <br />3. Drill 1.5" diameter hole to a depth of 2" per Vapor Pin manufacturer <br />recommendations. <br />4. Drill 5/8" diameter hole to a depth of 1" below the bottom of slab per <br />manufacturer recommendations. <br />DETAIL: VAPOR MONITORING POINT <br />NOT TO SCALE
The URL can be used to link to this page
Your browser does not support the video tag.