Laserfiche WebLink
- 2 - <br /> PA - 22001185 ( SA ) <br /> 3 ) The Traffic Impact Mitigation Fee shall be required for any traffic resulting from this <br /> application . The fee is due and payable at the time of building permit application . The fee <br /> shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record . ( Resolution R- 00 - 433 ) <br /> 4 ) The Regional Transportation Impact Fee shall be required for any traffic resulting from this <br /> application . The fee is due and payable at the time of building permit application . The fee <br /> will be based on the current schedule at the time of payment . ( Resolution R - 06 - 38 ) <br /> 5 ) A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> 6 ) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards . Retention basins shall be fenced with six ( 6 ) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more . Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval , prior to release of building permit . ( Development Title Section 9 - 1135 <br /> Informational Notes : <br /> ( i ) Wastewater shall not be allowed into the storm drainage system . <br /> ( ii . ) The project will enact appropriate source control BMPs to prevent the discharge of <br /> trash offsite . <br /> CH : DS <br />