My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085271 (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
17
>
2900 - Site Mitigation Program
>
SR0085271 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2022 10:55:50 AM
Creation date
11/1/2022 10:53:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085271
PE
2903
FACILITY_ID
FA0027175
FACILITY_NAME
MAJ STOCKTON, LLC
STREET_NUMBER
17
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730019
ENTERED_DATE
5/13/2022 12:00:00 AM
SITE_LOCATION
17 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan <br />17 West Washington Street, Stockton, California 95202 <br />461803 <br /> <br /> Page i <br />Table of Contents <br />Page <br />1.0 INTRODUCTION ....................................................................................... 1 <br />1.1 Specific Work Activities .................................................................................................. 1 <br />1.2 Site Description and Chemicals of Concern .................................................................... 1 <br />2.0 IDENTIFICATION OF KEY HEALTH AND SAFETY PERSONNEL ................. 3 <br />2.1 Principal in Charge/Project Manager ............................................................................. 3 <br />2.2 Local Office Health and Safety Representative .............................................................. 3 <br />2.3 Site Supervisor................................................................................................................ 3 <br />2.3 Site Safety Officer ........................................................................................................... 3 <br />2.4 Project Personnel ........................................................................................................... 4 <br />3.0 HAZARD EVALUATION .............................................................................. 5 <br />3.1 Specific Chemicals of Concern ........................................................................................ 1 <br />4.0 GENERAL SUBSURFACE CLEARANCE REQUIREMENTS ............................ 2 <br />4.1 Specific Procedures ........................................................................................................ 3 <br />5.0 PERSONNEL PROTECTIVE EQUIPMENT (PPE) ......................................... 5 <br />6.0 AIR MONITORING PROCEDURES ............................................................. 7 <br />6.1 Action Level Guidance .................................................................................................... 8 <br />6.1.1 Air Monitoring Action Response Limits 8 <br />6.1.2 Combustible Gas Indicator (CGI) Oxygen Meter 8 <br />6.1.3 Odors 8 <br />7.0 DECONTAMINATION ................................................................................ 9 <br />7.1 Sampling and Construction Equipment Decontamination .............................................. 9 <br />7.2 Personnel Decontamination ........................................................................................... 9 <br />8.0 EMERGENCY RESPONSE PLAN (ERP) ..................................................... 10 <br />8.1 General Emergency guidelines are as follows: .............................................................10 <br />8.1.1 First Aid Procedures 10 <br />8.1.2 Fire Procedures 10 <br />8.1.3 Spill Procedures 10 <br />8.1.4 Uncovering an Underground Service (Intact) 10 <br />8.1.5 Striking an Underground Electrical/Telecom Cable 11 <br />8.1.6 Striking a Pressurized Gas Pipeline 11 <br />8.1.7 Striking a Pressurized Water Main 11 <br />8.2 Incident Reporting .......................................................................................................12 <br />9.0 HEALTH AND SAFETY PLAN FIELD TEAM SIGNATURES ......................... 13 <br />10.0 SAFETY MEETING CHECKLIST ................................................................ 14
The URL can be used to link to this page
Your browser does not support the video tag.