Laserfiche WebLink
CEILING SCHEDULETYPEDESCRIPTIONC1OPEN TO CEILING STRUCTURE W/ EXPOSED TRUSSESC2GYP BD CEILINGC3(A-1) LAY IN ACOUSTICAL CEILING TILE1REFLECTED CEILING PLAN1/4" = 1'-0"REFERENCE ELECTRICAL FOR LIGHTING PLANREFERENCE MECHANICAL FOR HVAC LAYOUT1.SKYLIGHT.2.SYRUP LINE 974 SERIES (974R AT FIRE RATED WALLS) ATTACHED TO BOTTOM OF DECKWITH 34" WIDE 16 GAUGE GALVANIZED PIPE STRAPS AT 4' O.C.3.6" DIA PVC CONDUIT ABOVE CEILINGS FOR SYRUP LINES-ROUTE (2) BUNDLES OF 14SYRUP LINES PER 6" PVC CONDUIT AS REQUIRED-SEAL TO WALL FINISH ATPENETRATIONS AND APPLY SPRAY FOAM ON INTERIOR OF CONDUIT AT ENDS TO SEALAROUND SYRUP LINES (TYP THROUGHOUT WALLS).4.SYRUP LINES TO POSTMIX INSTALL IN PVC CONDUIT TO WALL POCKET BELOW AND SEALAS REQUIRED.5.SYRUP LINES TO SLURPEE DISPENSERS INSTALL IN PVC CONDUIT TO WALL POCKETBELOW AND SEAL AS REQUIRED.6.PAINT CEILING AND STRUCTURE.7.NOT USED8.BOTTOM OF SECURITY CAMERA AND MONITOR AT 9'-6" AFF.9.LAY IN CEILING ORIGIN POINT.10.PREMANUFACTURED INSULATED COOLER VAULT CEILING. BUILDING CEILING ABOVE ISUNFINISHED EXPOSED STRUCTURE.11.DIGITAL MENU BOARDS, REF EF-1, A7.2, 7.2.1, AND A7.3 FOR MORE DETAILS.12.PROMO SCREEN. CENTER BETWEEN POS1 AND POS2. REF EF-1, A7.2, A7.2.1, AND A7.3FOR MORE DETAILSKEYNOTES1.ALL WALL PAINT ABOVE 9'-4" IN THE MERCHANDISE AREA SHALL BE "P-4" UNLESS NOTEDOTHERWISE ON THE REFLECTED CEILING PLAN. (REFERENCE SHEET A6.1 FOR MATERIALSSCHEDULE).2.SYRUP LINE INSTALLATION NOTE: WHERE REQUIRED BY CODE OR AS INDICATED ON PLANCABLED BUNDLE SYRUP LINES SHALL BE INSTALLED IN PVC CONDUIT (METAL CONDUITFOR FR LINES) W/ 45 DEGREE SWEEPS AT CORNER AND "TEE" CONNECTIONS, CONDUITSHALL BE ATTACHED TO WALL AND UNDERSIDE OF ROOF CONSTRUCTION W/ PIPE STRAPSAS REQUIRED, REFERENCE MANUFACTURE SPECIFICATIONS FOR MINIMUM ALLOWEDBENDING RADIUS OF LINES3.VERIFY NUMBER OF SYRUP LINES TO NUMBER OF SYRUP AND POST MIX MACHINES4.PROVIDE ACCESS PANEL WHEN EQUIPMENT IS PRESENT ABOVE COOLER VAULTGENERAL NOTESUNISEX1051'-6"1'-4"9A2.38"107106A2.3C3COOLERVAULT110OFFICE103UNISEXRESTROOMELECTRICAL6'-8"15'-0"3A2.332A7.1270'-4"P-7 5A2.31'-6"4"91269109111296'-0"5'-0"C1FOUR WAY AIR DIFFUSERRETURN AIR DIFFUSERSECURITY MONITORW/ SEPARATE CAMERAEXIT SIGNTRANSFER GRILLSUSPENDEDCEILING GRID(A-1)GYP BOARD CEILINGPAINTED EXPOSEDSTRUCTUREEMERGENCY LEDLIGHT FIXTUREREF. ELECTRICALWALK IN COOLEREVAPORATORCEILINGEXHAUST2x2 LEDLIGHT FIXTUREREF. ELECTRICALLED LIGHTFIXTUREREF. ELECTRICALREFLECTED CEILING PLAN SYMBOLSEXTERIOR WALL PACKREF. ELECTRICAL2x2 LEDEMERGENCYLIGHT FIXTUREREF. ELECTRICALEMERGENCYLIGHT FIXTUREREF. ELECTRICALEXTERIOR EMERGENCYEGRESS LIGHTSECURITY CAMERAEXTERIORSECURITY CAMERASALED LIGHTFIXTUREREF. ELECTRICALINTERIOR WALL MOUNTSPEAKERAVA MUSIC SYSTEMWALL MOUNTEMERGENCYLIGHT15"x15" LEDCANOPY FIXTUREREF. ELECTRICALLED LIGHTFIXTUREREF. ELECTRICAL11A7.18815'-0"A7.1112'-3"57'-4"23SIMP-8C28' - 0"A.F.F.P-8SALES10211'-2"C210' - 0"A.F.F.P-8BACKROOM343'-7"C28' - 0"A.F.F.P-83A7.14A7.110'-8 1/2"F.O. GYP TO F.O. GYP.1'-4"SSSAA.1B1234A8'-4"16'-5" <br />16'-5"18'-10"8'-4"17'-3"17'-7"7'-7"19'-0"8'-11"455'-8"6"1'-9"5"8"4'-4"C39' - 4"A.F.F.9' - 4"A.F.F.C39' - 4"A.F.F.C1P-4MERCHANDISE1019' - 4"A.F.F.C3EQ.EQ.6'-4"6'-8"18'-10"11C310' - 6"A.F.F.104A2.32A2.3A2.355CEILING DETAIL3" = 1'-0"6" COMPASSOSUSPENSION TRIMCOMPASSO ELITECLIPSUSPENDEDGRIDSYSTEMLAY IN CEILING2CEILING DETAIL3" = 1'-0"METAL STUD WALLPAINTED 5/8" GYP BD CEILING(MOISTURE RESISTANT AT WET ROOMS)WALL COVERING AS SCHEDULED6" 18 GA. C STUD CEILING JOISTSAT 16" O.C.16 GA. CONT. RUNNER TRACKATTACHED W/ (2) #10 TEKSCREWS AT 24" O.C.4SECTION @ COOLER WALL3/4" = 1'-0"ROOF STRUCTUREABOVECOOLER ANDFREEZER PANELS BY7-ELEVENPAINTED GYP., REFERENCEPAINTING SCHEDULE3-5/8" x 20 GA. BRACEAT EACH JOIST3-5/8" x 20 GA.STUDS AT 24" O.C.FINISH PER ROOM FINISHSCHEDULE AND INTERIORELEVATIONSMETAL RUNNER CHANNELFASTEN RUNNER TO BOTTOMOF STRUCTURE W/2 #6 TEKSCREWS @ 24" O.C.A7.08CLOCK & STRIPE REF EF1 ANDINTERIOR ELEVATIONS SHEETBULLNOSE TILE EDGE (T-5)+9'-4"REF INTERIOR ELEVATIONSSIM.3SECTION @ BULKHEAD3/4" = 1'-0"3-5/8" x 20 GA. STUDSAT 24" O.C.3-5/8" x 20 GA. STUDBRACING AT 24" O.C.LAY IN CEILINGROOF STRUCTURE ABOVESTEEL BAR JOISTFINISH PER ROOM FINISH SCHEDULEAND INTERIOR ELEVATIONSA.F.F.9' - 4"6"FASTEN RUNNER TO BOTTOMOF STRUCTURE W/2 #6 TEKSCREWS @ 24" O.C. OR ASREQUIRED TO SUPPORT THE LOAD.A2.3REFLECTED CEILING PLAN <br />3883 Ruffin Road Suite B <br />San Diego, CA 92123 <br />p: 714/560/8200 <br />f: 714/560/8211 <br />www.tait.com <br />Since 1964 Los Angeles <br />Anaheim <br />Ontario <br />Sacramento <br />San Diego <br />Boise <br />Dallas <br />Denver <br />Seattle <br />©"TAIT & ASSOCIATES" 2020 ALL RIGHTS RESERVED <br />Job#: <br />Scale: <br />Date: <br />Drawn By: <br />Checked By: <br />Rev. #Date DescriptionSHEET:7-ELEVEN, INC. <br />3200 HACKBERRY, IRVING, TEXAS 75063 <br />SE1237 <br />7-ELEVEN 1046249 <br />1110 N. MAIN ST <br />MANTECA, CA 95336 <br />TICOFALCC 1 9 0 9 1L <br />11 / 21EXPIRESETSTAFOIA <br />NR SNI <br />C <br />E <br />EDCHRAIETA <br />EN <br />FR <br />JR.EK <br />ALLPNSI