Laserfiche WebLink
CONSTRUCTION NOTES - <br />INSTALL VERTICAL GAS EXTRACTION WELL PER1 <br />4 <br />20 INSTALL WELLHEAD ASSEMBLY PER e <br />4 <br />O3 CONNECT WELL TO HEADER PER3 OR 3 <br />4O CONNECT WELL TO HEADER PER 2 <br />4 <br />OS INSTALL TEMPORARY GAS MONITORING PROBE PER e <br />3 <br />O INSTALL 6" CSP ROAD CROSSING PER <br />3 <br />T2 <br />O7 INSTALL 2" PVC MALE ADAPTER INTO EXISTING 18" PVC/HDPE HEADER <br />O9 INSTALL 2" PVC WELL LATERAL IN TRENCH/CSP SLEEVE <br />REMEDIATION AREA <br />GRAPHIC SCALE <br />100 50 0 100 200 <br />L - <br />( IN FEET ) <br />LEGEND <br />EXISTING LFG EXTRACTION WELL <br />O PROPOSED LFG EXTRACTION WELLS (13 TOTAL) <br />GP -8 ® EXISTING GAS MONITORING PROBE <br />PROPOSED GAS MONITORING PROBES (39 TOTAL) <br />■ FUTURE LFG EXTRACTION WELLS WITH WELL SPACING <br />TO BE DETERMINED AFTER INITIAL WELLS ARE INSTALLED <br />AND SYSTEM EVALUATED <br />F063 <br />T O <br />FOA4 <br />64. <br />1i <br />0 <br />zlO <br />1:\DWG\ALLIED\FORWARD\PERIMETERMTEM\862750B.DWG <br />SURVEY <br />POINTS <br />PT If <br />PROBE # <br />WELL <br />NORTHING EASTING <br />O <br />TGP-1 <br />_# <br />N/A <br />6673.5 <br />4403.6 <br />O <br />TGP-2 <br />N/A <br />6633.5 <br />4406.2 <br />O <br />TGP-3 <br />N/A <br />6593.5 <br />4408.8 <br />® <br />TGP-4 <br />N/A <br />6553.5 <br />4411.0 <br />O5 <br />TGP-5 <br />N/A <br />6513.5 <br />4413.4 <br />© <br />TGP-6 <br />N/A <br />6473.5 <br />4415.8 <br />O7 <br />TGP-7 <br />N/A <br />6433.5 <br />4417.2 <br />® <br />TGP-8 <br />N/A <br />6393.5 <br />4418.8 <br />O9 <br />TGP-9 <br />N/A <br />6353.5 <br />4420.3 <br />OO <br />TGP-10 <br />N/A <br />6316.0 <br />4421.7 <br />11 <br />TGP-11 <br />N/A <br />6281.0 <br />4423.1 <br />©2 <br />TGP-12 <br />N/A <br />6246.0 <br />4424.6 <br />©3 <br />TGP-13 <br />N/A <br />6211.0 <br />4426.2 <br />® <br />TGP-14 <br />N/A <br />6176.0 <br />4427.8 <br />©5 <br />TGP-15 <br />N/A <br />6141.0 <br />4429.5 <br />© <br />TGP-16 <br />N/A <br />6110.1 <br />4431.1 <br />© <br />TGP-17 <br />N/A <br />6084.1 <br />4432.4 <br />® <br />TGP-18 <br />N/A <br />6054.0 <br />4433.6 <br />19 <br />TGP-19 <br />N/A <br />5987.3 <br />4436.0 <br />® <br />TGP-20 <br />N/A <br />5958.2 <br />4437.1 <br />21 <br />TGP-21 <br />N/A <br />5933.2 <br />4438.1 <br />® <br />TGP-22 <br />N/A <br />5901.0 <br />4439.4 <br />® <br />TGP-23 <br />N/A <br />5862.7 <br />4440.9 <br />®4 <br />TGP-24 <br />N/A <br />5824.3 <br />4442.4 <br />©5 <br />TGP-25 <br />N/A <br />5785.9 <br />4443.9 <br />© <br />TGP-26 <br />N/A <br />5747.6 <br />4445.5 <br />® <br />TGP-27 <br />N/A <br />5708.5 <br />4447.2 <br />® <br />TGP-28 <br />N/A <br />5668.5 <br />4449.1 <br />®9 <br />TGP-29 <br />N/A <br />5628.5 <br />4450.7 <br />® <br />TGP-30 <br />N/A <br />5588.5 <br />4451.8 <br />31 <br />TGP-31 <br />N/A <br />5548.5 <br />4452.8 <br />® <br />TGP-32 <br />N/A <br />5508.5 <br />4453.7 <br />® <br />TGP-33 <br />N/A <br />5468.5 <br />4455.0 <br />® <br />TGP-34 <br />N/A <br />5428.5 <br />4456.5 <br />®5 <br />TGP-35 <br />N/A <br />5388.5 <br />4458.0 <br />® <br />TGP-36 <br />N/A <br />5348.5 <br />4459.3 <br />® <br />TGP-37 <br />N/A <br />5308.5 <br />4460.2 <br />TGP-38 <br />N/A <br />5268.5 <br />4461.1 <br />TGP-39 <br />N/A <br />5228.5 <br />4462.4 <br />® <br />N/A <br />TGW-1 <br />6263.5 <br />4423.8 <br />® <br />N/A <br />TGW-2 <br />6228.5 <br />4425.4 <br />4© <br />N/A <br />TGW-3 <br />6193.5 <br />4427.0 <br />® <br />N/A <br />TGW-4 <br />6158.5 <br />4428.6 <br />44 <br />N/A <br />TGW-5 <br />6097.1 <br />4431.7 <br />45 <br />N/A <br />TGW-6 <br />6037.3 <br />4434.1 <br />® <br />N/A <br />TGW-7 <br />6004.0 <br />4435.3 <br />4© <br />N/A <br />TGW-8 <br />5945.7 <br />4437.6 <br />® <br />N/A <br />TGW-9 <br />5881.8 <br />4440.2 <br />® <br />N/A <br />TGW-10 <br />5843.5 <br />4441.7 <br />®0 <br />N/A <br />TGW-11 <br />5805.1 <br />4443.2 <br />51 <br />N/A <br />TGW-12 <br />5766.8 <br />4444.7 <br />® <br />N/A <br />TGW-13 <br />5688.5 <br />4448.1 <br />CONSTRUCTION NOTES - <br />INSTALL VERTICAL GAS EXTRACTION WELL PER1 <br />4 <br />20 INSTALL WELLHEAD ASSEMBLY PER e <br />4 <br />O3 CONNECT WELL TO HEADER PER3 OR 3 <br />4O CONNECT WELL TO HEADER PER 2 <br />4 <br />OS INSTALL TEMPORARY GAS MONITORING PROBE PER e <br />3 <br />O INSTALL 6" CSP ROAD CROSSING PER <br />3 <br />T2 <br />O7 INSTALL 2" PVC MALE ADAPTER INTO EXISTING 18" PVC/HDPE HEADER <br />O9 INSTALL 2" PVC WELL LATERAL IN TRENCH/CSP SLEEVE <br />REMEDIATION AREA <br />GRAPHIC SCALE <br />100 50 0 100 200 <br />L - <br />( IN FEET ) <br />LEGEND <br />EXISTING LFG EXTRACTION WELL <br />O PROPOSED LFG EXTRACTION WELLS (13 TOTAL) <br />GP -8 ® EXISTING GAS MONITORING PROBE <br />PROPOSED GAS MONITORING PROBES (39 TOTAL) <br />■ FUTURE LFG EXTRACTION WELLS WITH WELL SPACING <br />TO BE DETERMINED AFTER INITIAL WELLS ARE INSTALLED <br />AND SYSTEM EVALUATED <br />F063 <br />T O <br />FOA4 <br />64. <br />1i <br />0 <br />zlO <br />1:\DWG\ALLIED\FORWARD\PERIMETERMTEM\862750B.DWG <br />