My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:11:06 PM
Creation date
11/17/2022 1:54:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2006
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
526
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/22/04 Permit was issued for gas system expansion (39 wells total). <br />Dates that EHD inspected: <br />03/23/05 through 03/25/04 <br />Completion date was approximately: 05/19/04 <br />Note: Decommission of extraction wells near monitoring probes was <br />scheduled to be done on 09/20/05 and destruction to be done by 11/19/04. <br />However, this action was not carried out or enforced. <br />09/16/04 Permit was issued for gas system expansion (vacuum curtain). <br />09/20/04 Work Plan received on this date for vacuum curtain along western <br />boundary. There are 52 wells total (39 gas monitoring probes and 13 <br />vertical gas extraction wells) <br />Dates that EHD inspected: <br />09/22/04 (well construction observed) <br />09/24/04 (well construction observed) <br />10/05/04 (34 wells completed at this time) <br />Completion date was in November 2004. <br />06/16/05 Permit was issued for gas system expansion <br />Dates that EHD inspected: <br />06/21/05 <br />06/22/05 <br />06/24/05 <br />06/25/05 <br />06/28/05 <br />06/30/05 <br />07/07/05 <br />07/08/05 <br />07/11/05 <br />07/12/05 <br />07/13/05 <br />07/15/05 Installations completed. <br />r7`0---�5 <br />3 ' a-fuw 1 c9 <br />2�1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.