Laserfiche WebLink
i <br />CONSTRUCTION NOTES= <br />O1 INSTALL VERTICAL GAS EXTRACTION WELL PER e <br />4 <br />O2 INSTALL WELLHEAD ASSEMBLY PER <br />4 <br />O3 CONNECT WELL TO HEADER PER3 OR 3 <br />O4 CONNECT WELL TO HEADER PER e <br />4 <br />O INSTALL TEMPORARY GAS MONITORING PROBE PER e <br />3 <br />�6 INSTALL 6" CSP ROAD GROSSING PER 8{ <br />3 <br />O INSTALL 2" PVC MALE ADAPTER INTO EXISTING 18" PVC/HDPE HEADER <br />O - <br />O9 INSTALL 2" PVC WELL LATERAL IN TRENCH/CSP SLEEVE <br />lz-,�6w- q;,, <br />yzb Sia Zc50zf <br />REMEDIATION AREA \ <br />N <br />i <br />GRAPHIC SCALE <br />100 50 0 Sao 200 <br />( IN FEET ) <br />LEGEND <br />S EXISTING LFG EXTRACTION WELL <br />Q PROPOSED LFG EXTRACTION WELLS (13 TOTAL) <br />GP -8 0 EXISTING GAS MONITORING PROBE <br />A PROPOSED GAS MONITORING PROBES (39 TOTAL) <br />■ FUTURE LFG EXTRACTION WELLS WITH WELL SPACING <br />TO BE DETERMINED AFTER INITIAL WELLS ARE INSTALLED <br />AND SYSTEM EVALUATED <br />SURVEY POINTS <br />PT N <br />PROBE y <br />-Ar N <br />NOb5NG <br />EACUNG <br />O <br />TGP-1 <br />2/ <br />7 <br />20 <br />TGP-2 <br />P. Ay33© <br />O <br />TGP-30 <br />. <br />4O <br />TGP-4 <br />N;)% <br />R i0 <br />�1 <br />OS <br />TGP-5 <br />3�5 <br />© <br />TGP-6 <br />O <br />TGP-7 <br />® <br />TGP-8 <br />9O <br />TGP-9 <br />3/lkl <br />R.34 <br />T430.7 <br />10 <br />TGP-10 <br />('N& <br />t 6 <br />.Z) <br />11 <br />TGP-11 <br />1. <br />12 <br />TGP-12 <br />/A! <br />4.t4. <br />13 <br />TGP-13 <br />t!/� <br />11j <br />6 <br />Q4 <br />TGP-14 <br />$4 <br />76. <br />15 <br />TGP-15 <br />N/A <br />6141.0 <br />4429.5 <br />16 <br />TGP-16 <br />N/A <br />6110.1 <br />4431.1 <br />1Q <br />TGP-17 <br />N/A <br />6084.1 <br />4432.4 <br />18 <br />TGP-18 <br />N/A <br />6054.0 <br />4433.6 <br />19 <br />TGP-19 <br />N/A <br />5987.3 <br />4436.0 <br />�0 <br />TGP-20 <br />N/A <br />5958.2 <br />4437.1 <br />2t <br />TGP-21 <br />N/A <br />5933.2 <br />4438.1 <br />©2 <br />TGP-22 <br />N/A <br />5901.0 <br />4439.4 <br />© <br />TGP-23 <br />N/A <br />5862.7 <br />4440.9 <br />�4 <br />TGP-24 <br />N/A <br />5824.3 <br />4442.4 <br />�5 <br />TGP-25 <br />N/A <br />5785.9 <br />4443.9 <br />© <br />TGP-26 <br />N/A <br />5747.6 <br />4445.5 <br />© <br />TGP-27 <br />N/A <br />5708.5 <br />4447.2 <br />® <br />TGP-28 <br />N/A <br />5668.5 <br />4449.1 <br />®9 <br />TGP-29 <br />N/A <br />5628.5 <br />4450.7 <br />® <br />TGP-30 <br />N/A <br />5588.5 <br />4451.8 <br />31 <br />TGP-31 <br />N/A <br />5548.5 <br />4452.8 <br />® <br />TGP-32 <br />N/A <br />5508.5 <br />4453.7 <br />® <br />TGP-33 <br />N/A <br />5468.5 <br />4455.0 <br />®4 <br />TGP-34 <br />N/A <br />5428.5 <br />4456.5 <br />®5 <br />TGP-35 <br />N/A <br />5388.5 <br />4458.0 <br />�6 <br />TcP-36 <br />N/A <br />5348.5 <br />4459.3 <br />® <br />TGP-37 <br />N/A <br />5308.5 <br />4460.2 <br />® <br />TGP-38 <br />N/A <br />5268.5 <br />4461.1 <br />©9 <br />TGP-39 <br />N/A <br />5228.5 <br />4462.4 <br />® <br />N/A <br />TGW-1 <br />6263.5 <br />4423.8 <br />® <br />N/A <br />TGW-2 <br />6228.5 <br />4425.4 <br />N/A <br />TGW-3 <br />6193.5 <br />4427.0 <br />Q <br />N/A <br />TGW-4 <br />6158.5 <br />4428.6 <br />44 <br />N/A <br />TGW-5 <br />6097.1 <br />4431.7 <br />45 <br />N/A <br />TGW-6 <br />6037.3 <br />4434.1 <br />® <br />N/A <br />TGW-7 <br />6004.0 <br />4435.3 <br />0 <br />N/A <br />TGW-8 <br />5945.7 <br />4437.6 <br />lFa'- <br />/A <br />TGW-9 <br />5881.8 <br />4440.2 <br />N/A <br />TGW-10 <br />5843.5 <br />4441.7 <br />® <br />N/A <br />TGW-11 <br />5805.1 <br />4443.2 <br />51 <br />N/A <br />TGW-12 <br />5766.8 <br />4444.7 <br />® <br />N/A <br />TGW-13 <br />56885 <br />4448.1 <br />CONSTRUCTION NOTES= <br />O1 INSTALL VERTICAL GAS EXTRACTION WELL PER e <br />4 <br />O2 INSTALL WELLHEAD ASSEMBLY PER <br />4 <br />O3 CONNECT WELL TO HEADER PER3 OR 3 <br />O4 CONNECT WELL TO HEADER PER e <br />4 <br />O INSTALL TEMPORARY GAS MONITORING PROBE PER e <br />3 <br />�6 INSTALL 6" CSP ROAD GROSSING PER 8{ <br />3 <br />O INSTALL 2" PVC MALE ADAPTER INTO EXISTING 18" PVC/HDPE HEADER <br />O - <br />O9 INSTALL 2" PVC WELL LATERAL IN TRENCH/CSP SLEEVE <br />lz-,�6w- q;,, <br />yzb Sia Zc50zf <br />REMEDIATION AREA \ <br />N <br />i <br />GRAPHIC SCALE <br />100 50 0 Sao 200 <br />( IN FEET ) <br />LEGEND <br />S EXISTING LFG EXTRACTION WELL <br />Q PROPOSED LFG EXTRACTION WELLS (13 TOTAL) <br />GP -8 0 EXISTING GAS MONITORING PROBE <br />A PROPOSED GAS MONITORING PROBES (39 TOTAL) <br />■ FUTURE LFG EXTRACTION WELLS WITH WELL SPACING <br />TO BE DETERMINED AFTER INITIAL WELLS ARE INSTALLED <br />AND SYSTEM EVALUATED <br />