Laserfiche WebLink
3. Raise well casing 12 inches above ground level. <br /> 4. Provide sample tap between the well head and the pressure tank. <br /> i. Install an approved back-flow prevention device on the water supply system(s) (California Code of <br /> Regulation, Title 17, Section 7603). <br /> j. Any geotechnical drilling shall be conducted under permit and inspection by The Environmental <br /> Health Department (San Joaquin County Development Title, Section 9-1115.3 and 9-1115.6). <br /> k. If floor drains are required, they must be plumbed through a sand/oil separator and discharged to <br /> an above ground system approved by the Environmental Health Department.A registered engineer <br /> must design this system. The material collected in the above ground holding system must be <br /> analyzed for hazardous constituents prior to disposal. Specific test requirements may be obtained <br /> from the Environmental Health Department. The fee will be based on the current schedule at the <br /> time of payment. <br /> 4. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Staff Contact: [209] 235-0600) <br /> a. This project is subject to the San Joaquin County Multi-Species Habitat Conservation and Open <br /> Space Plan (SJMSCP) must provide a Certificate of Payment prior to issuance of any grading or <br /> building permits. <br /> 5. MOSQUITO VECTOR CONTROL DISTRICT (Staff Contact: [209] 982-4675) <br /> a. Applicant must incorporate mosquito prevention best management practices for the design, <br /> construction, operations, and maintenance of the proposed stormwater pond. <br /> 6. SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (Staff Contact: [209] 557-6446) <br /> a. For each project phase,within 30-days of issuance of the first certificate of occupancy, if applicable, <br /> submit to the District a summary report of the construction start, and end dates, and the date of <br /> issuance of the first certificate of occupancy. Otherwise, submit to the District a summary report of <br /> the construction start and end dates within 30 days of the end of each phase of construction. <br /> b. For each project phase, all records shall be maintained on site during construction and for a period <br /> of ten years following either the end of construction or the issuance of the first certificate of <br /> occupancy,whichever is later. Records shall be made available for District inspection upon request <br /> c. For each project phase, maintain records of (1) the construction start and end dates and (2) the <br /> date of issuance of the first certificate of occupancy, if applicable. <br /> Planning Commission Staff Report, PA-2200090, PA-2100295 (GP, SA) 8 <br /> Conditions of Approval <br />