Laserfiche WebLink
-2- <br /> PA-2100295(UP)& PA-2200090(GP) <br /> not limited to fences,walls, private light standards, rocks, landscaping and cobbles are not <br /> allowed in the right-of-way.) (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2) The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Improvement Standards Drawing No. R-17 prior to issuance of the <br /> occupancy permit. (Development Title Section 9-1145.5) <br /> 3) The proposed driveway shall align with Curry Avenue to the south. <br /> 4) Applicant shall obtain approval from the Department of Public Works and Caltrans for <br /> STAA terminal and STAA route designations of proposed facility.Contact the Traffic <br /> Engineering Division of the Department of Public Works(209-468-3707)for designation <br /> process. <br /> 5) Prior to the issuance of the occupancy permit the"Commercial Vehicles Over 7 Tons <br /> Prohibited"signage shall be relocated to the western property line. <br /> 6) Prior to issuance of the occupancy permit signage shall be installed directing all traffic <br /> exiting the facility west on Pine Street. No truck or vehicular traffic shall be directed east on <br /> Pine Street to Curry Avenue. <br /> 7) The owner shall execute an Irrevocable Offer to Dedicate Road to result in a twenty-five <br /> (25)foot wide right-of-way from the centerline of Pine Street to the property line across the <br /> parcel's frontage.(A fee based on the current fee schedule is required for processing per <br /> Development Title Table 9-240.2 in addition to a copy of the Grant Deed and a legal <br /> description of the parcel to be offered for dedication.)(Development Title Section 9-1150.5) <br /> 8) The Traffic Impact Mitigation Fee shall be required for this application.The fee is due and <br /> payable at the time of building permit application.The fee will be based on the current <br /> schedule at the time of payment.The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> 9) The Regional Transportation Impact Fee shall be required for this application. The fee is <br /> due and payable at the time of building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> 10) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-1135) <br /> 11) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 12) Applicant shall file a Notice of Intent(NOI)with the State Water Resources Control Board <br /> (SWRCB)and comply with the State"General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Discharge Identification Number(WDID), <br /> issued by SWRCB,shall be submitted to Public Works prior to release of the building <br /> permit.Contact the SWRCB at(916)341-5537 for further information. <br /> Planning Commission Staff Report, PA-2200090, PA-2100295 (GP, SA) 10 <br /> Response Letters <br />