My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015278
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
6550
>
2600 - Land Use Program
>
PA-2100295 (UP)
>
SU0015278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:20 PM
Creation date
11/23/2022 8:50:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015278
PE
2626
FACILITY_NAME
PA-2100295 (UP)
STREET_NUMBER
6550
Direction
E
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240-
APN
04912004
ENTERED_DATE
11/23/2022 12:00:00 AM
SITE_LOCATION
6550 E HWY 12
RECEIVED_DATE
11/22/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21SJCOG, Inc. <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to <br /> any ground disturbance but no later than six(6)months from receipt of the ITMMs.If ITMMs are not signed within six months, <br /> the applicant must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staffwill <br /> sign the ITMMs. This is the effective date ofthe ITMMs. <br /> 2. Under no circumstance shall ground disturbance occurwithout compliance and satisfaction ofthe ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment ofthe applicable SJMSCP fee covering the entirety ofthe project acreage being covered(the <br /> bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety ofthe project acreage being covered;or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date ofthe ITMMs or issuance of a building permit,whichever occurs first,the project <br /> applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the proj ect acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> C. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations ofthe mitigation fee shall subject the bondto be called. <br /> • Receive your Certificate of Payment and release the required permit <br /> It should be noted that if this project has any potential impacts to waters of the United States[pursuant to Section 404 Clean Water Act],it would <br /> require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 days. It may be <br /> prudent to obtain a preliminary wetlands map from a qualified consultant.Ifwaters of the United States are confirmed on the project site,the <br /> Corps and the Regional Water Quality Control Board(RWQCS)would have regulatory authority over those mapped areas]pursuant to Section <br /> 404 and 401 of the Clean Water Act respectively]and permits would be required from each of these resource agencies prior to grading the <br /> project site. <br /> If you have any questions, please call(209)235-0600. <br /> Planning Commission Staff Report, PA-2200090, PA-2100295 (GP, SA) 25 <br /> Response Letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.