My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INTERNATIONAL
>
1124
>
2300 - Underground Storage Tank Program
>
PR0548106
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 4:47:02 PM
Creation date
12/1/2022 9:44:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0548106
PE
2351
FACILITY_ID
FA0027447
FACILITY_NAME
MOUNTAIN HOUSE CHEVRON
STREET_NUMBER
1124
Direction
N
STREET_NAME
INTERNATIONAL
STREET_TYPE
PKWY
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
1124 N INTERNATIONAL PKWY
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> 5 . Provide written notification to ust@sjgov . org to arrange the following inspection appointments . <br /> All appointments must be scheduled 48 hours in advance . <br /> PRIOR TO BACKFILL <br /> a ) Inspection for brine leaks prior to tank placement in excavation . All tank pre- installation tests shall be <br /> performed according to tank manufacturer instructions . <br /> b ) Verification of tank set , anchorage , appropriate backfill , and appropriate additional corrosion protection <br /> of tank anchors (turnbuckles , eye bolts , etc . ) . Additional corrosion protection is required on all exposed <br /> metal prior to covering . <br /> c) Primary tank test, according to manufacturer' s specifications . <br /> d ) Primary piping soap test of all piping and penetrations ( product , vapor recovery , and vent) : One - hour <br /> pneumatic pressure test at 110 % of operating pressure , or 40 psi , whichever is greater, in accordance <br /> with manufacturer installation instructions . <br /> e ) Verification of secondary piping slope at 1 /8 inch per foot or greater, to a containment sump with an <br /> audible/visual alarm . <br /> f) Secondary piping soap test of all piping and penetrations ( product, vapor recovery , and vent) : One- <br /> hour pressure test at the manufacturer' s recommended specification . <br /> g ) Verification of all pipe setbacks , cross-overs , and burial depth according to the manufacturer' s <br /> installation instructions and verification of appropriate piping backfill . <br /> h ) Integrity testing of all sumps per the manufacturer' s installation instructions . <br /> i ) Verification of brine type and witnessing of brine addition . <br /> PRIOR TO FIRST FUEL DELIVERY <br /> j ) Verification of leak monitoring communication for all installed vacuum , pressure , or hydrostatic (VPH ) <br /> components including piping , sumps , under dispenser containment sumps ( UDCs) , and all chase lines . <br /> Communication at end points of each vacuum zone and each vacuum monitored sump must be <br /> verified independently in operating condition . <br /> k) Verification of the dispenser footprints contained by the UDCs . Any potential leaks from piping and <br /> fuel filters must drain directly into UDCs . <br /> 1 ) Enhanced Leak Detection ( ELD ) testing , after facility is in operating condition . Appropriate test <br /> notification , tester certifications , and test method disclosure is required . Passing ELD test results must <br /> be received prior to receiving fuel . <br /> m ) Verification of VPH components installation ( shroud boots and band clamps for spill containers , <br /> appropriate rubber-type gasket or clamps on lids on all fill , vent and STP sumps , etc . ) . <br /> n ) Verification of overfill prevention : Measurement of drop tubes to verify 95 % tank volume shut off and/or <br /> verification that external audible/visual alarm activates when tank is 90 % full . <br /> o) Spill bucket test : Verify minimum 5 -gallon capacity and pass a one hour hydrostatic test ( or equivalent) . <br /> Proper drainage method must be verified . <br /> p ) Monitoring system functionality : Functionality of the monitoring system must be verified to ensure it <br /> meets the requirements of California Code of Regulations ( CCR) Title 23 and California Health & <br /> Safety Code ( HSC ) Chapter 6 . 7 . <br /> PRIOR TO FINAL APPROVAL <br /> q ) Leak detector test , after first fuel delivery : Leak detector must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi . Leak detector monitored line volumes shall be appropriate <br /> for the make and model of the installed leak detectors , and shall be verified at the time of installation . <br /> r) PRIOR TO FINAL APPROVAL : Monitoring system functionality , after first fuel delivery , in operating <br /> condition : Functionality of the monitoring system must be verified to ensure it meets the requirements <br /> of CCR Title 23 and HSC Chapter 6 . 7 . <br /> 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.