My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
704
>
2300 - Underground Storage Tank Program
>
PR0547997
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 2:47:16 PM
Creation date
12/5/2022 11:23:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0547997
PE
2351
FACILITY_ID
FA0027375
FACILITY_NAME
GRAPPA MARKET SHELL
STREET_NUMBER
704
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
25966077
CURRENT_STATUS
01
SITE_LOCATION
704 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT <br /> ® Northern Region Office ❑ Central Region Office ❑ Southern Region Office <br /> 4800 Enterprise Way 1990 E.Gettysburg Ave. 34946 Flyover Court <br /> Modesto,CA 95356-8718 Fresno,CA 93726-0244 Bakersfield,CA 93308-9725 <br /> (209)557-6400 (559)230-5950 (661)392-5500 <br /> Gasoline Vapor Recovery Pre-Backfill Inspection Form <br /> Facility <br /> Station Name: Grappa Market Shell ATC: N-10114-1-0 <br /> Location: 710 Jack Tone Rd City: Ripon Contact: Gulbahar Saini Phone: (312)912-1833 <br /> Contractor <br /> Michael <br /> Company: LC Services Contact: Lemon ICC Cert# 8944790 exp.11-23-22 Phone#: 559-500-9809 <br /> Inspection Summary: <br /> Phase I System Type: VR-101 Phase II System Type: VR-204 Number of Dispensers: 8 <br /> Vapor return slope piping: Slope is 1/8"or greater draining toward the UST?O Yes ❑No <br /> Vapor return pipe diameter: Pipe diameter is 2"from the dispenser to the first manifold? O Yes❑No <br /> 3"Thereafter?O Yes❑No <br /> Diesel tanks on-site? ®Yes ❑No If yes,are they manifolded with the gasoline tanks? ❑Yes ®No <br /> Compliance ® No defects apparent in the vapor return piping.Final compliance to be determined with TP 201.4 test at <br /> Status: start-up <br /> ❑ The following items must be addressed and re-inspected before backfill can commence: <br /> Comments: <br /> Site has E85,which was confirmed to not be manifolded to gasoline tanks. <br /> Inspector: Adam Mumford Date: 9/27/2022 <br /> When repairs are complete call: Received By: <br /> NOTE:CA Health&Safety Code,Section 41960.2(a)—Maintenance of Installed Systems.(e)Requires that ■ <br /> the above listed 7-day deficiencies be repaired within 7 days.Failure to do so will result in legal action. HEALTHY AIR LIVING' <br /> For important updates and information regarding gasoline dispensing operation requirements,please join wwwheal thysirliving.com <br /> our email notification list for Gasoline Vapor Recovery at: http://www.valleyair.org/lists/list.htm Make one change for clean air! <br />
The URL can be used to link to this page
Your browser does not support the video tag.