Laserfiche WebLink
SOV <br />2020-049 Hvacplumb.dwg 06.10.2020ARCH D 24X36 <br />SHEET:OF <br />CHECKED BY: <br />DATE: <br />DRAWN BY: <br />PROJECT NO.:NO.DATESHEET NO.:DESCRIPTIONLH ACINAC <br />EM <br />GDMD ENGINEERING, INCMechanical and Safety Engineers212 W Pine St, Ste 4Lodi, Ca 95242Ph 209-367-0899Fax 209-367-0898E-mail:gdmdengrinc@sbcglobal.netJOB:2020-049´ <br />´ <br />WATERSANITARY <br />-1/2"1-1/2"2"EYEWASH <br />1/2"1/2"1-1/2"2"SHOWER - RES. <br />--1-1/2"3"FLOOR SINK 3" <br />--1-1/2"2"FLOOR SINK 2" <br />--2"3"FD - 3" <br />--1-1/2"2"FD - 2" <br />-1/2"--TRAP PRIMER <br />3/4"3/4"2"3"MOP SINK <br />1/2"1/2"1-1/2"2"KITCHEN SINK <br />1/2"1/2"1-1/2"2"CLASSROOM SINK <br />1/2"1/2"1-1/2"2"BAR SINK <br />1/2"1/2"1-1/2"2"LAV <br />-1/2"1-1/2"2"URINAL FT <br />-3/4"1-1/2"2"URINAL FV <br />-1/2"2"3"WATER CLOSET FT <br />-1"2"3"WATER CLOSET FV <br />HOTCOLDVENTSEWERFIXTURE <br />PLUMBING <br />P0