My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015274
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
24930
>
2600 - Land Use Program
>
PA-2200252
>
SU0015274
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:15:01 AM
Creation date
12/27/2022 9:09:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015274
PE
2622
FACILITY_NAME
PA-2200252
STREET_NUMBER
24930
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
ACAMPO
Zip
95220-
APN
00519038
ENTERED_DATE
11/23/2022 12:00:00 AM
SITE_LOCATION
24930 N CHEROKEE LN
RECEIVED_DATE
12/22/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31S . IC' 0G , Inc. . <br /> - S JC0G , Inc . <br /> San Joaquin Cozzzzty Mniti-Species Habitat Conservation Open Space Plan <br /> 555 East Weber Avenue • Stockton, CA 95202 • (209) 235- 0600 • FAX (209) 235-0438 <br /> •� SJMSCP HOLD <br /> TO : Local Jurisdiction : Community Development Department , Planning Department , Building <br /> Department Engineering Department Survey Department , Transportation Department , <br /> Other : <br /> FROM : Laurel Boyd , SJCOG , Inc . <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi - <br /> Species Habitat Conservation and Open Space Plan ( SJMSCP ) . In accordance with that agreement , the <br /> Applicant has agreed to : <br /> 1 ) SJMSCP Incidental Take Minimization Measures and mitigation requirement : <br /> 1 . Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs . <br /> " If ITMMs are not signed within six months , the applicant must reapply for SJMSCP Coverage . Upon receipt <br /> RWIFS <br /> �=. � . . <br /> � ; : 'l <br /> of signed ITMMs from project applicant, SJCOG , Inc . staff will sign the ITMMs . This is the effective date <br /> of the ITMMs . <br /> 2 . Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs . <br /> 3 . Upon issuance of fully executed ITMMs and prior to any ground disturbance , the project applicant must : <br /> a . Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered (the bond should be valid for no longer than a 6 month period) ; or <br /> b . Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered ; or <br /> c . Dedicate land in- lieu of fees, either as conservation easements or fee title ; or <br /> d . Purchase approved mitigation bank credits . <br /> 4 . Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br /> first, the project applicant must : <br /> Y a . Pay the appropriate SJMSCP for the entirety of the project acreage being covered ; or <br /> b . Dedicate land in- lieu of fees, either as conservation easements or fee title ; or <br /> c . Purchase approved mitigation bank credits . <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called . <br /> Project Title : PA-2200252 ( MS ) <br /> . � Landowner : Lochie M . Paige Applicant : Dillon & Murphy Engineering <br /> Assessor Parcel #s : 005490 - 38 <br /> T , R., Section ( s ) : <br /> Local Jurisdiction Contact : Sol Jobrack <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP . <br />
The URL can be used to link to this page
Your browser does not support the video tag.