Laserfiche WebLink
PLUMBING FIXTURE SCHEDULECALIFORNIA GREEN BUILDING STANDARDS CODE GENERAL NOTES <br />PLUMBING LEGEND <br />PIPE MATERIAL SCHEDULE <br />FIELD VERIFICATION <br />GRAVITY - GREASE INTERCEPTOR CALCULATION <br />NON-RESIDENTIAL MANDATORY MEASURES <br />PIPE SIZING SCHEDULE AT 3.0 PSI/100 FT <br />EXISTING WATER CALCULATIONS* <br />PLUMBING NOTES, SCHEDULES, <br />SYMBOLS AND ABBREVIATIONS <br />P-1.0 <br />PRINTED DATE: 07-23-2021PROJECT NAME/ADDRESS: <br />STAMP <br />@Mountain House <br />ARCHITECT <br />ARCH PROJECT #: <br />JOB NUMBER <br />DRAWN BY <br />SHEET CONTENT <br />SHEET NO <br />ISSUE DATE: <br />REVISIONS: <br />EM <br />21-___ <br />CHECK BY <br />ADR <br />ARCHITECTURE <br />GWA <br />1000 Corporate Center Drive <br />Suite 550 <br />Monterey Park, CA 91754 <br />tel: (626) 288-6898 <br />Member of The American Institute of Architects <br />REN. 04-30-2023