Laserfiche WebLink
SJVUAPCD Indirect Source Review 11/30/23 <br /> Complete Project Summary Sheet 111-37— <br /> Monitoring <br /> 1:37amMonitoring and Reporting Schedule <br /> (District Enforced Emission Reduction Measures Continued) <br /> Enforcing Measure specific implementation Measure For District Review <br /> Aciencv Compliance <br /> SJVAPCD Construction andFor each project phase,all <br /> Operation-Recordkeeping records shall be maintained (Compliance Dept_ <br /> on site during construction Review) <br /> and for a period of ten years <br /> following either the end of <br /> construction or the issuance <br /> of the first certificate of <br /> occupancy,whichever is <br /> later. Records shall be made <br /> available for District <br /> inspection upon request. <br /> SJVAPCD Construction and For each project phase, <br /> Operational Dates maintain records of(1)the (Compliance Dept. <br /> construction start and end Review) <br /> dates and (2)the data of <br /> issuance of the first certificate <br /> of occupancy, if applicable. <br /> SJVAPCD Landscape equipment 30% Landscape Equipment <br /> electrically powered (Compliance Dept. <br /> Review <br /> Number of District Enforced Measures:4 <br /> 2 <br />