Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 , Site map enclosed ? YES = NO F71 <br /> 2 , Submit copies of ICC Service Technician and /or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the " Site Health and Safety <br /> Plan " is available on the 14obsite as required by Title 8 . <br /> 3 , Detailed description of work to be completed , List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done , ( If <br /> adding piping , UDC 's , or other UST equipment , or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> address SB989 failures ; no excavation required -- specifically : <br /> 1 ) at UDC 5-6 : remove and replace Bravo conduit penetrations ; replace 87 and 91 Bravo hubs <br /> 2 ) at UDC 7-8 : remove and replace Bravo conduit penetrations ; replace 87 and 91 Bravo Hubs <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval ) : <br /> Bravo penetrations and hubs (see attached ) <br /> 2 <br />