Laserfiche WebLink
The following is an itemized list of hazardous materials violations that have not been <br /> addressed for NORMAC-STOCKTON as of December 27, 2022. <br /> Open violations from November 17, 2022 inspection <br /> Violation #5 - Failed to electronically submit hazardous materials inventory for all reportable materials on <br /> site. <br /> 1 . OBSERVATION About 170 gallons of Round Up Pro Max were found inside the southwest area of the building <br /> that have not been reported to CERS. <br /> REGULATION GUIDANCE: Any material that meets or exceeds the reportable quantity shall be reported in the <br /> facility's business plan. <br /> CORRECTIVE ACTIONS: Immediately log into the California Environmental Reporting System (CERS) at <br /> http://cers.calepa.ca.gov/, add the materials to the hazardous material inventory, and submit to the EHD for <br /> approval. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 2 . OBSERVATION The Hazardous Materials Inventory was not complete/accurate. <br /> 1 . Best Dimension 270G - the size of the largest container, average daily amount, days on site, storage pressure, <br /> and storage temperature elements were not completed. <br /> 2. Best Nitra King - the size of the largest container, average daily amount, days on site, storage pressure, and <br /> storage temperature elements were not completed. <br /> 3. Best Start 6-24-24-XB - the size of the largest container, average daily amount, days on site, storage pressure, <br /> and storage temperature elements were not completed. <br /> 4. Best Triple Pro 15-15-15 - the size of the largest container, average daily amount, days on site, storage <br /> pressure, and storage temperature elements were not completed. <br /> 5. Best Turf Supreme - the size of the largest container, average daily amount, days on site, storage pressure, and <br /> storage temperature elements were not completed. <br /> 6. Best Turf Supreme 16-6-8 plus - the size of the largest container, average daily amount, days on site, storage <br /> pressure, and storage temperature elements were not completed. <br /> 7. Site Pro 15-15-15 Multi Purpose - the size of the largest container, average daily amount, days on site, storage <br /> pressure, and storage temperature elements were not completed. <br /> 8. Site Pro 15-15-15 .37% prodiamine - the size of the largest container, average daily amount, days on site, <br /> storage pressure, and storage temperature elements were not completed. <br /> 9. Site Pro 18-6-8 Summer - the size of the largest container, average daily amount, days on site, storage <br /> pressure, and storage temperature elements were not completed. <br /> 10. Site Pro 21 -0-0 - the size of the largest container, average daily amount, days on site, storage pressure, and <br /> storage temperature elements were not completed. <br /> 11 . Site Pro 21 -7-4 Turf Royal with .25 pounds Dimension - the size of the largest container, average daily amount, <br /> days on site, storage pressure, and storage temperature elements were not completed. <br /> 12. Site Pro 25-5-2 Summer Slow - the size of the largest container, average daily amount, days on site, storage <br /> pressure, and storage temperature elements were not completed. <br /> 13. Site Pro 6-20-20 Pre Plant - the size of the largest container, average daily amount, days on site, storage <br /> pressure, and storage temperature elements were not completed. <br /> 14. Propane — the unit of measure and maximum daily amount is wrongly reported in cubic feet vs. gallons and the <br /> size of the largest container, average daily amount, days on site, storage pressure, and storage temperature <br /> elements were not completed. <br /> 15. Best Plant Paks 20-10-5 - the size of the largest container, average daily amount, days on site, storage <br /> pressure, and storage temperature elements were not completed. <br /> 16. Best Plan Tabs - the size of the largest container, average daily amount, days on site, storage pressure, and <br /> storage temperature elements were not completed. <br /> 17. PVC Glue - the size of the largest container, average daily amount, days on site, storage pressure, and storage <br /> temperature elements were not completed. <br /> REGULATION GUIDANCE: The Hazardous materials inventory information must be current and submitted as part <br /> of the business plan. <br /> Page 2 of 5 <br />