The following is an itemized list of hazardous materials violations that have not been
<br /> addressed for NORMAC-STOCKTON as of December 27, 2022.
<br /> Open violations from November 17, 2022 inspection
<br /> Violation #5 - Failed to electronically submit hazardous materials inventory for all reportable materials on
<br /> site.
<br /> 1 . OBSERVATION About 170 gallons of Round Up Pro Max were found inside the southwest area of the building
<br /> that have not been reported to CERS.
<br /> REGULATION GUIDANCE: Any material that meets or exceeds the reportable quantity shall be reported in the
<br /> facility's business plan.
<br /> CORRECTIVE ACTIONS: Immediately log into the California Environmental Reporting System (CERS) at
<br /> http://cers.calepa.ca.gov/, add the materials to the hazardous material inventory, and submit to the EHD for
<br /> approval.
<br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
<br /> 2 . OBSERVATION The Hazardous Materials Inventory was not complete/accurate.
<br /> 1 . Best Dimension 270G - the size of the largest container, average daily amount, days on site, storage pressure,
<br /> and storage temperature elements were not completed.
<br /> 2. Best Nitra King - the size of the largest container, average daily amount, days on site, storage pressure, and
<br /> storage temperature elements were not completed.
<br /> 3. Best Start 6-24-24-XB - the size of the largest container, average daily amount, days on site, storage pressure,
<br /> and storage temperature elements were not completed.
<br /> 4. Best Triple Pro 15-15-15 - the size of the largest container, average daily amount, days on site, storage
<br /> pressure, and storage temperature elements were not completed.
<br /> 5. Best Turf Supreme - the size of the largest container, average daily amount, days on site, storage pressure, and
<br /> storage temperature elements were not completed.
<br /> 6. Best Turf Supreme 16-6-8 plus - the size of the largest container, average daily amount, days on site, storage
<br /> pressure, and storage temperature elements were not completed.
<br /> 7. Site Pro 15-15-15 Multi Purpose - the size of the largest container, average daily amount, days on site, storage
<br /> pressure, and storage temperature elements were not completed.
<br /> 8. Site Pro 15-15-15 .37% prodiamine - the size of the largest container, average daily amount, days on site,
<br /> storage pressure, and storage temperature elements were not completed.
<br /> 9. Site Pro 18-6-8 Summer - the size of the largest container, average daily amount, days on site, storage
<br /> pressure, and storage temperature elements were not completed.
<br /> 10. Site Pro 21 -0-0 - the size of the largest container, average daily amount, days on site, storage pressure, and
<br /> storage temperature elements were not completed.
<br /> 11 . Site Pro 21 -7-4 Turf Royal with .25 pounds Dimension - the size of the largest container, average daily amount,
<br /> days on site, storage pressure, and storage temperature elements were not completed.
<br /> 12. Site Pro 25-5-2 Summer Slow - the size of the largest container, average daily amount, days on site, storage
<br /> pressure, and storage temperature elements were not completed.
<br /> 13. Site Pro 6-20-20 Pre Plant - the size of the largest container, average daily amount, days on site, storage
<br /> pressure, and storage temperature elements were not completed.
<br /> 14. Propane — the unit of measure and maximum daily amount is wrongly reported in cubic feet vs. gallons and the
<br /> size of the largest container, average daily amount, days on site, storage pressure, and storage temperature
<br /> elements were not completed.
<br /> 15. Best Plant Paks 20-10-5 - the size of the largest container, average daily amount, days on site, storage
<br /> pressure, and storage temperature elements were not completed.
<br /> 16. Best Plan Tabs - the size of the largest container, average daily amount, days on site, storage pressure, and
<br /> storage temperature elements were not completed.
<br /> 17. PVC Glue - the size of the largest container, average daily amount, days on site, storage pressure, and storage
<br /> temperature elements were not completed.
<br /> REGULATION GUIDANCE: The Hazardous materials inventory information must be current and submitted as part
<br /> of the business plan.
<br /> Page 2 of 5
<br />
|