Laserfiche WebLink
W.O.# NW1-2361632 <br /> Tanknology Inc. <br /> 11000 N.MoPac Fxpressway,Suite 500 Austin,TX 78759 (800)964-0010 Policy 100-29-A <br /> JOB CLEARANCE FORM&SITE SAFETY CHECKLIST-OVF Rev:G <br /> Revised:2/11/2019 <br /> Site Name/#: � � � tree)Address: W.O.u <br /> Arrival ime: eparture ime: Trave T—Ime Othets on site: Date <br /> Sco f Work and ks Performed(JSA'stnust be avail for all tasksl: <br /> Repairs to Equipment or arts Provided: <br /> Follow-up actions required;equipment isolated:comments: <br /> PE-PERSONAL PROTE E EQUIPMENT REQUIRED heck✓items used or mark—if notapplicable) <br /> Safety Vest Safety Glasses Gloves ❑ Hearing Protection <br /> Steel Toe Boots Splash Goggles ❑ Hard Hat ❑ Other <br /> ✓ PRE-TEST PROCEDURES Check , each item completed or mark -- if not applicable <br /> 1. Discuss safety procedures with site personnel. Nearest hospital: <br /> 2. ❑ �rfor to fuel deliveries the UST system must be placed back into working order. <br /> 3. KP <br /> e entire work area with barricades(cones,flags,and extension bars,caution tape,pennant flags,or other perimeter guard). <br /> 4. e fire extinguishers and"No Smoking"signs in the work area. <br /> 5. ❑ Confined Space Entry—If required complete separate CSE Checklist. If NO CSE REQUIRED check the following reason: <br /> ❑No CS's ❑CS's not opened ❑No entry only visual ❑No entry-used tools ❑Work from prone position w/o risk of falling in <br /> 6. ❑ Implement Lockout/Tagout per API 1646(when accessing product piping during tasks) <br /> ❑ Secure nozzles with"Out of Service'bags and nylon ties. ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> ❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet"conn for from the STP(s). <br /> All applicable equipment disabled during test(s). ❑ Verify LOTO is complete by tryin to operate pumps. <br /> SIGN IN Lead Tecame ad Technician Signature <br /> General Safety Checks: <br /> All site personnel have been informed. )rArrdU <br /> Is a fuel delivery due today? Site Representative ame Site Representative Signature <br /> LOTO procedures have been discussed. <br /> Work areas barricaded to protect workers,staff&public. <br /> ✓ POST-TEST PROCEDURES(Check ,'each item completed or mark - if not applicable) <br /> 1. Remove all"Lockout/ragout"devices and nozzle bags/ties. <br /> 2. Run all pumps and verify there are no leaks: Impact Valve Test Ports under dispensers <br /> Leak Detector Threads on STP's Functional Elements&Relief Screws <br /> 3. Ins II lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: Li _ L2_ L3_ L4_ L5_ L6 <br /> 4. Check following components operational: ATG es,sensors,&caps <br /> Rall floats,dry breaks&caps C odic protection operational <br /> C tainment sumps are dry ispensers&POS operational <br /> /Dip enser panels are replacedCI tubes,flapper valves,fill adapters&caps <br /> k detectors&vent tubes /hole covers and sump lids <br /> //Monitoring system is operational hear valves are open <br /> Siphon lines and manifold valves open Spill containers&drain valves <br /> STP fittings and bayonet connectors Vents&Extractors(not capped,plugged or isolated) <br /> 5. Remove barricades. <br /> SIGN OUT&Operator Verification of Work(CIVF) Lead Technital Name Lead Technician Signature <br /> General Safety Checks: <br /> Work area has been left clean&safe. <br /> Site staff aware of work status including any remaining isolation. -Site Representative Name Site Representative Signature <br /> Changes to equipment are documented and communicated. <br /> All incidents,near incidents,and unsafe situations reported. <br /> Site RepresentativeComments: <br /> COMPANY CONFIDENTIAL ©Tanknology Inc.,2019.All Rights Reserved. <br /> Printed copies of this document are uncontrolled. The current version is available in the Tanknolo On-Line Document Control S stem. <br />