My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 9:42:05 AM
Creation date
1/10/2023 9:05:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC. #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGINEERING, INC. <br /> X,of- <br /> Overfill <br /> Prevention Inspection -OPW 61 and 71 Series Devices <br /> Date: �Gf/Gl % D g <br /> Owner: <br /> Facility: <br /> OPW Overfill Model Number: <br /> Part 1 -Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons <br /> Max shut off requirement for flapper is 95% s 95% <br /> Multiply Max tank volume by 95% C Gauuns ' <br /> Use tank chart or ATG to determine height of D Inches i <br /> calculated volume <br /> Measure top of fill riser threads,or face seal E Inches <br /> adapter <br /> Tank diameter(From Tank Chart) F Inches I <br /> Upper Tube in Tank(G)F-D=G G Inches <br /> Subtract 2"from upper tube in tank G-2"=K x Inches <br /> Calculated minimum upper tube length(1) I Inches <br /> K+E=I <br /> Actual measured upper tube length(Without J Inches <br /> fill adapter) <br /> Part 2-Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95% <br /> requirement? <br /> Is the actual measured upper tube length 6.5 inches or <br /> more than the fill riser?Q must be 6.5"or more than E) <br /> Does the overfill prevention device function as required? <br /> (Inspect the device for damage,contamination,freedom of <br /> movement,weakening due to wear and corrosion <br /> Device Overfill Certification PASS/FAIL <br /> Drop Tube Testing PASS/FAEL <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician: Date: <br /> Technician's Name: <br />
The URL can be used to link to this page
Your browser does not support the video tag.