Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for SUPER STOP GAS & LIQUOR* as of July 13, 2023. <br /> Open violations from April 24, 2023 inspection <br /> Violation#107-Failure to submit and maintain complete and current financial responsibility documents. <br /> 1).OBSERVATION: Current Financial responsibility documents(Certificate of Financial Responsibility and a letter <br /> from the Chief Financial Officer)have not been submitted to the EHD. The most recent financial responsibility <br /> documents in CERS are dated 3/16/20222 and expired 03/16/2023. <br /> REGULATION GUIDANCE: Current financial responsibility documents are required to be submitted annually. <br /> CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS)at <br /> http://cers.calepa.ca.gov/, and upload the required documents. <br /> ---------------------------------------------------------------------------------------------------------------------------------------------------- <br /> 2).OBSERVATION: Current financial responsibility documents were not found on site. <br /> REGULATION GUIDANCE:A copy of current financial responsibility documents are required to be maintained on <br /> site. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br /> copy on site. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#122-Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION:An inspection was last done on 04/05/2022 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 05/05/2022. This information was received on 05/24/2022, 19 days late. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report.The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 2 <br />