My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
2300 - Underground Storage Tank Program
>
PR0504388
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2024 1:57:03 PM
Creation date
1/10/2023 9:09:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0504388
PE
2361
FACILITY_ID
FA0006185
FACILITY_NAME
STOCKTON FOOD AND GAS
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
01
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
has been examined and reviewed by a third party Professional Engineer. The Service <br /> Technician will perform all Hydrostatic Testing using the Caldwell Systems Level <br /> Change Indicator. The sump will be inspected prior to testing. If necessary the sump <br /> will be cleaned prior to addition of testing fluid. All test fluid will be supplied and <br /> recovered for reuse by the Service Technician performing the test. The Service <br /> Technician will test at a level of 2" above the highest penetration to include electrical <br /> penetrations unless otherwise expressly recommended by the local regulatory agency to <br /> test at a higher or lower level. Sumps not equipped with fail safe sensors will be tested at <br /> a level to include the entire sump unless otherwise expressly recommended by the local <br /> regulatory agency to test at a lower level. <br /> Under Dispenser Containment—The Service Technician will test and certify using <br /> methods developed and recommended by the UDC Manufacture, Industry Standard or <br /> Professional Engineer. The test procedure recommended and used is Hydrostatic with a <br /> level change indicator that has been developed to indicate a standard leak rate of/4 inch <br /> in 24 hours within 30 minutes, and has been examined and reviewed by a third party <br /> professional engineer. The Service Technician will perform all Hydrostatic Testing using <br /> the Caldwell Systems Level Change Indicator. The UDC will be inspected prior to <br /> testing. If necessary the UDC will be cleaned prior to addition of testing fluid. All test <br /> fluid will be supplied and recovered for reuse by the Service Technician performing the <br /> test. The Service Technician will test at a level 2" above the highest penetration to <br /> include electrical penetrations unless otherwise expressly recommended by the local <br /> regulatory agency to test at a higher or lower level. Sumps not equipped with fail safe <br /> sensors will be tested at a level to include the entire sump unless otherwise expressly <br /> recommended by the local regulatory agency to test at a lower level. <br /> Entire Agreement and Procedure—There are no understandings or agreements between <br /> the parties with respect to the agreement or procedure or the services to be rendered <br /> hereunder, except as herein expressly stated. <br /> Reference: PELRP1200-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.