Laserfiche WebLink
Following soil and groundwater sampling activities, temporary well points and/or probes will be removed <br /> from the subsurface and the borehole will be backfilled with hydrated bentonite chips following sampling <br /> activities. Boreholes advanced in improved areas will be capped with concrete or asphalt patch to match <br /> existing ground cover after being backfilled. No significant amounts of derived wastes will be generated <br /> during this investigation. <br />