My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083942
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1700
>
2900 - Site Mitigation Program
>
SR0083942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 1:55:07 PM
Creation date
1/10/2023 1:51:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0083942
PE
2903
FACILITY_ID
FA0026668
FACILITY_NAME
DELTA WIRELESS AND PORTSIDE MACHINE SHOP
STREET_NUMBER
1700
Direction
W
STREET_NAME
FREMONT
City
STOCKTON
Zip
95203
APN
13508009
ENTERED_DATE
7/8/2021 12:00:00 AM
SITE_LOCATION
1700 W FREMONT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Partner Site-Specific Health and Safety Plan <br /> Introduction <br /> Partner Engineering and Science, Inc. (Partner) has been retained by Delta Wireless Inc. to conduct a Phase II <br /> Subsurface Investigation at the subject property. This Health and Safety Plan (HASP) document identifies the <br /> Health and Safety procedures that are intended to guide the field activities at the site. The details of this plan <br /> apply to employees of Partner and its subcontractors. Regulatory agencies are expected to observe the safety <br /> rules and regulations established by their respective organizations in addition to the requirements of this <br /> document. <br /> This plan must be reviewed and acknowledged by all personnel prior to entering the work area. In general, a <br /> "Tailgate Safety Meeting" is conducted at the initiation of on-site activities and at the beginning of each day <br /> thereafter until the completion of the project. However, the actual briefing may be conducted off-site (e.g., in the <br /> office) if conditions preclude or render impractical its completion on-site. <br /> This HASP will be a living document in that it will be continually updated and/or revised as the site conditions and <br /> knowledge of the operations develop further. The development and preparation of the HASP has been based on <br /> past experiences and site specific information at the time of preparation. If actual site conditions or operations vary <br /> from the data used to prepare this HASP, amendments shall be made to reflect those changes. <br /> This HASP has been developed with consideration to current safety standards, health effects, and standards for <br /> known contaminants and procedures designed to account for potential hazards from known and/or suspected <br /> substances. In preparing this document, Partner has specifically reviewed Occupational Safety & Health <br /> Administration (OSHA) Title 29 Code of Federal Regulations (CFR) 1910 & 1926, California Occupational Safety & <br /> Health Administration (Cal/OSHA) Title 8 California Code of Regulations (CCR) 5192, the National Institute of <br /> Occupational Safety& Health (NIOSH)/OSHA/United States Coast Guard (USCG)/Environmental Protection Agency <br /> (EPA) Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, NIOSH Pocket Guide <br /> to Chemical Hazards, and the American Conference of Governmental Industrial Hygienists, Inc. (ACGIH) Threshold <br /> Limit Values for Chemical Substances and Chemical Agents. <br /> Project Information <br /> Project Type: Phase II Subsurface Investigation <br /> Site Name: West Fremont Street <br /> Address: 1700 West Fremont Street <br /> Stockton, California 95203 <br /> Partner Project Number: 21-327528.1 <br /> Project Scope of Work <br /> Advance a total of 4 borings for soil and groundwater sampling. <br /> Utility Clearance <br /> Have necessary underground utility notifications for subsurface work been made? ® Yes ❑ Not Applicable <br /> Specify clearance dates,ticket confirmation number, and other relevant information: <br /> Partner Site-Specific Health and Safety Plan Page 1 <br /> Version 2.0 July 6,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.