Laserfiche WebLink
ti <br />CALGREEN <br />2016 CALIFORNIA GREEN BUILDING CODE <br />THIS PROJECT IS SUBJECT TO THE MANDATORY MEASURES OF THE "CALGREEN" CODE; SEE SHEET CG1 & OTHER SHEETS THAT <br />REPLACE CODE SECTIONS. ALL FACTORS OF WORK ARE AFFECTED . <br />- BELOW IS ONLY A PARTIAL LIST: <br />BUILDING CONSTRUCTION: THE FOLLOWING ITEMS ARE TO BE INCLUDED IN CONSTRUCTION: <br />+++ RECYCLE 100% OF ALL SITE CONCRETE OR ASPHALT PAVING BEING DEMOLISHED INCLUDING 100% OF ALL SOIL, LANDSCAPE <br />DEBRIS & OTHER SITE DEBRIS <br />+++ RECYCLE MIN. 75% OF BUILDING CONCRETE OR CMU WASTE. (SEE SITE PLAN FOR ANY HIGHER REQUIREMENTS) <br />+++ RECYCLE MIN. 75% BUILDING CONSTRUCTION WASTE INCLUDING WOOD, STEEL, ALUMINUM, GLASS, AND CLEAN <br />PAPERICARDBOARD (INCLUDE TRASH). (SEE SITE PLAN FOR ANY HIGHER REQUIREMENTS) <br />+++ PERCENTAGE ARE IN "VOLUME" <br />+++ WHERE REQUIRED BY LOCAL AGENCIES, INCREASED RECYCLE PERCENTAGE SHALL GOVERN. <br />+++ ULTRA LOW WATER CLOSET AND URINAL FLUSH VALVES (ZURIN). <br />+++ 50% SHADING OF EXTERIOR PAVED AREAS IN 15 YEARS. <br />+++ MOTION SENSOR/CONTROLS FOR RESTROOMS AND STORAGE AREAS. <br />+++ ADHESIVES AND PAINTS WITH LOW VOC (SEE BELOW). <br />+++ CEILING TILES WITH RECYCLED CONTENT AND HIGHER REFLECTIVITY (SEE BELOW). <br />SITE BICYCLE PARKING: <br />OPERATOR OPTIONS: THE FOLLOWING "GREEN BUILDING" ITEMS ARE AT OWNER'S OPTION TO INCLUDE IN BUILDING: (THESE ARE <br />IMPORTANT "GREEN" ITEMS; PM TO CLEAR WITH OPERATOR): <br />+++ RECYCLE OIL. <br />+++ ELECTRONIC CONTROLLED FIXTURES. <br />+++ RECYCLE CONTENT IN FURNITURE/DECOR. <br />+++ ENERGY MANAGEMENT SYSTEM. <br />SPECIFICATIONS: SEE ALSO, CALGREENS SHEETS SA3 & CG1 <br />ADHESIVE: <br />ADHESIVES MUST MEET OR EXCEED THE VOC LIMITS OF SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE #1168 BY, AND <br />ALL SEALANTS USED ASA FILLER MUST MEET OR EXCEED BY AREA AIR QUALITY MANAGEMENT DISTRICT REG. 8, RULE 51. SEE <br />ALSO CGI <br />PAINT SPECIFICATIONS: <br />- WHERE PRACTICAL; PRODUCTS SHALL HAVE OVER 40% EXTRACTED, PROCESSED (WHERE PRACTICAL, AND MANUFACTURED <br />WITHIN 5DO MILE RADIUS OF PRODUCT SITE). SEE ALSO CGI <br />-INTERIOR PAINTS: MEET CRITERIA FOR U.S. GREEN BUILDING COUNCIL LEED VERSION 2.2 EQ CREDIT 4.2: LOW EMITTING <br />MATERIALS: PAINTS AND COATINGS. SEE ALSO CGI <br />-EXTERIOR PRODUCTS MEET GREEN SEAL GS -11 AND GREEN SEAL GS -03. SEE ALSO A2 <br />CEILING SPECIFICATIONS: <br />- PRODUCTS SHALL HAVE OVER 45% EXTRACTED, PROCESSED (WHERE PRACTICAL, AND MANUFACTURED WITHIN 500 MILE RADIUS <br />OF PRODUCT SITE). <br />- "RECYCLE CONTENT" OF NEW TILE MUST EXCEED 45%. <br />- LIGHT REFLECTANCE (LEED RC VALUE): EXCEED 45%. <br />FIRE PROTECTION SYSTEM REQUIREMENTS: <br />1. NOTICE TO CONTRACTORS: THE FIRE DEPARTMENT DOES NOT ALLOW INSTALLATION OF FIRE ALARM SYSTEMS OR <br />OTHER FIRE PROTECTION PRIOR TO PLAN APPROVAL. CONTRACTORS WHO ENGAGE IN SUCH ACTIVITIES MAY BE <br />CITED AND THE PROJECT WILL BE TAGGED. <br />2 ALL FIRE ALARM SYSTEMS(WHEN APPLICABLE) AND COMMERCIAL HOOD AND DUCT SYSTEMS REQUIRE SEPARATE PLANS <br />APPLICATION, REVIEW, PERMIT AND FEE. ANY OF THE ABOVE NAMED SYSTEMS INCLUDED WITH THIS APPLICATION AND <br />SHOWN OR NOTED ON THESE PLANS ARE TO BE USED FOR BID PURPOSES ONLY FOR FIRE DEPARTMENT APPROVAL OF <br />THE ABOVE NAMED APPLICATION DOES NOT INCLUDE ANY OF THE ABOVE SYSTEMS. AN AUTOMATIC FIRE EXTINGUISHING <br />AND ALL HOOD DUCT, PLENUM AND <br />SYSTEM IS REQUIRED FOR THE PROTECTION OF COMMERCIAL COOKING EQUIPMENT, <br />COOKING SURFACES. SUBMIT PLANS TO FIRE DEPT, FOR REVIEW, APPROVAL & PERMITTING <br />3. APPROVED NUMBERS AND OR LETTERS SHALL BE PLACED ON ALL BUILDINGS TO BE VISIBLE FROM THE <br />STREET. <br />4. PROVIDE A "KNOX BOX" SECURITY KEY BOX AT AN APPROVED ACCESSIBLE LOCATION (6' ELEVATION). <br />COORDINATE WITH FIRE DEPARTMENT FOR EXACT LOCATION. PROVIDE KEYS WITH IDENTIFICATION <br />TAGS. <br />5. SEPARATE PERMIT IS REQUIRED FOR ANSUL SYSTEM TO BE TESTED AND APPROVED BY PLUMBING <br />DEPARTMENT. <br />6. INSPECTIONS ARE TO BE REQUESTED THROUGH THE BUILDING DIVISION WISPECIFIC INSPECTION. <br />7. ADDRESS NUMBERS SHALL BE INSTALLED ON THE FRONT OR PRIMARY ENTRANCE FOR ALL BUILDINGS. MINIMUM <br />E R TENANT PACE <br />ADDRESS O S <br />MULTIPLE ACCESS ISPROVIDED, <br />SIZE SHALL BE 12" HIGH BY 1" STROKE. WHERE U <br />NUMBER SHALL BE PROVIDED ON EACH MAN DOOR. ADDRESS NUMBERS TO BE ILLUMINATED AT NIGHT. <br />8. RANGE HOODS, DUCTS, GRILLS, AND FRYERS IN COMMERCIAL KITCHENS SHALL BE EQUIPPED WITH AN APPROVED <br />AUTOMATIC WET CHEMICAL SYSTEM. SETS OF PLANS AND SPECIFICATIONS SHALL BE SUBMITTED TO THE DIXON <br />FIRE DEPARTMENT FOR REVIEW AND APPROVAL. SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC GAS AND <br />ELECTRIC SHUT-OFF, THE LATEST EDITION OF N.F.P.A. 2013, "STANDARD FOR INSTALLATION OF EQUIPMENT FOR <br />REMOVAL OF SMOKE AND GREASE -LADEN VAPORS FROM COMMERCIAL COOKING EQUIPMENT" SHALL BE <br />CONSIDERED AS A GUIDE TO RECOMMENDED GOOD PRACTICE, AN APPROVED WET CHEMICAL FIRE <br />EXTINGUISHER HAVING A UL K -RATING SHALL BE MOUNTED IN THE KITCHEN. WITH (2) TWO 2A10BC FIRE <br />EXTINGUISHERS. NO CONSTRUCTION ABOVE THE SLAB SHALL OCCUR UNTIL STREETS OR ACCESS WAYS ARE <br />PAVED. REFER TO PLUMBING AND MECHANICAL DEPARTMENT FOR INSTALLATION OF HOOD AND VENT <br />SUPPRESSION SYSTEMS. <br />9. UNDERGROUND UTILITIES ARE INSTALLED AND REQUIRED FIRE HYDRANTS ARE INSTALLED AND TESTED. OPTION: <br />CONSTRUCTION ABOVE THE SLAB IS PERMITTED PRIOR TO THE PAVED STREETS AND/OR ACCESS WAYS AND <br />INSTALLATION OF UNDERGROUND UTILITIES IF A FEE MAY BE REQUIRED AND SHALL BE PAID INTO THE FIRE <br />DEPARTMENT CAPITAL EQUIPMENT REPLACEMENT AND REPAIR FUND. THIS FEE SHALL BE PAYABLE AT THE TIME <br />OF BUILDING PERMIT ISSUANCE. PORTABLE FIRE EXTINGUISHER(S) SHALL BE PROVIDED AND INSTALLED IN <br />ACCORDANCE WITH THE MOST CURRENT EDITION OF CBC. <br />10. CALIFORNIA FIRE CODE AND FIRE CODE STANDARD NUMBER 10-1. MINIMUM APPROVED SIZE FOR ALL PORTABLE <br />FIRE EXTINGUISHERS SHALL BE 2A 10B:C. PER STOCKTON CITY ORD. TEMPORARY OFFICE <br />CONSTRUCTION/MODULAR BUILDINGS SHALL HAVE THE FOLLOWING REQUIREMENTS: A. PROVIDE "K" GLASS FIRE <br />EXTINGUISHER IN A READILY ACCESSIBLY LOCATION ADJACENT TO THE PRIMARY EXIT TO THE <br />UNIT(S)/MODULAR(S), PROVIDE A MINIMUM OF ONE BATTERY-OPERATED SMOKE DETECTOR. WHEN THE UNIT IS <br />BROKEN UP INTO MULTIPLE SPACES SUCH AS OFFICE(S) AND STORAGE AREA(S). B. A SMOKE DETECTOR SHALL <br />BE INSTALLED IN EACH AREA. A MINIMUM 48-HOUR NOTICE IS REQUIRED FOR FIRE DEPARTMENT WITNESSING OF <br />ALL NECESSARY TESTS AND/OR INSPECTIONS. C. PROVIDE ONE CLASS "K" FIRE EXTINGUISHER AT KITCHEN AREA. <br />13. SUBMIT PLANS TO AND OBTAIN PERMIT FROM FIRE PREVENTION WORK. <br />14. CALIFORNIA LICENSED C-16 CONTRACTOR SHALL NOTIFY THE FIRE DEPARTMENT WHEN THEY WILL TEST <br />PLUMBING AND ANSUL SYSTEM, SO THAT THE FIRE DEPARTMENT WILL BE ABLE TO ATTEND THE TEST. <br />15. FIRE HYDRANTS SHALL BE TESTED AND APPROVED, FIRE ACCESS ROADS MADE SERVICEABLE PRIOR TO <br />DELIVERY OF COMBUSTIBLE MATERIALS ON SITE. ALL CONSTRUCTION WORK IS SUBJECT TO STOP WORK ORDER <br />IF ACCESS ROADS BECOME IMPASSABLE OR FIRE HYDRANT INOPERABLE. SEE THE BACK OF THE BUILDING & <br />SAFETY DIVISION PERMIT CARD FOR FIRE PRODUCTION REQUIREMENTS DURING CONSTRUCTION. <br />16. WHEN FIRE FACILITIES SUCH AS, BUT NOT LIMITED TO, FIRE HYDRANTS AND ACCESS ROADS ARE TO BE <br />INSTALLED BY THE DEVELOPER, THEY SHALL BE INSTALLED AND MADE SERVICEABLE PRIOR TO AND DURING THE <br />TIME OF CONSTRUCTION (SECTION 901.3 CFC) <br />17. OBTAIN PERMIT FROM THE FIRE PREVENTION DIVISION FOR FIRE SPRINKLER ALARM SUPERVISION. SUPERVISION <br />IS REQUIRED ON ALL FIRE SPRINKLER SYSTEMS WITH 20 OR MORE SPRINKLER HEAD. CFC 903.4. PLANS FOR FIRE <br />ALARM SYSTEM SHALL BE SUBMITTED TO THE CITY/COUNTY FIRE DEPARTMENT FOR REVIEW AND APPROVAL. <br />18. THE GENERAL CONTRACTOR AND THE SPRINKLER CONTRACTOR SHALL COORDINATE THE PROTECTION OF ROOF <br />"CRICKETS" (WHERE APPLICABLE). <br />19. SEE ADDITIONAL FIRE SPRINKLER NOTES ON SHEET SA5 <br />20. LOCATE TYPE "K" EXTINGUISHER W/ IN 18' OF HOOD. ADD CONSPICUOUS PLACARD NEAR IF @ TO READ; "THE FIRE <br />SPRINKLER SYSTEM SHALL BE ACTIVATED PRIOR TO USING THE PORTABLE FIRE EXTINGUISHER" (WHEN APPLICABLE) <br />21, SUBMIT PLANS TO AND OBTAIN PERMIT FROM THE FIRE PREVENTION DIVISION FOR THE INSTALLATION OR MODIFICATION <br />OF FIRE SPRINKLER SYSTEM. INSTALLATIONS MUST ALSO COMPLY WITH FFD POLICY SECTION 405. FFD POLICIES CAN BE <br />FOUND ON THE FIRE DEPARTMENT WEBPAGE UNDER FIRE PREVENTION & INVESTIGATION, FIRE DEPARTMENT POLICIES. <br />22. OBTAIN PERMIT FROM THE FIRE PREVENTION DIVISION (OVER THE COUNTER) FOR FIRE SPRINKLER ALARM SUPERVISION. <br />SUPERVISION IS REQUIRED ON ALL FIRE SPRINKLER SYSTEMS WITH 20 OR MORE SPRINKLER HEADS. 2016 CFC, SECTION <br />903.4 INSTALLATIONS MUST ALSO COMPLY WITH FFD POLICY SECTIONS 405 AND 407. FFD POLICIES CAN BE FOUND ON <br />THE FIRE DEPARTMENT WEBPAGE UNDER FIRE PREVENTION & INVESTIGATION. FIRE DEPARTMENT POLICIES. <br />GENERAL NOTES: <br />1. ALL WELDING SHALL BE INSPECTED BY AN APPROVED TESTING AGENCY IN ACCORDANCE W/ CBC SECTION <br />1705.2.2.1 SUBMIT REPORTS TO THE DEVELOPMENT DEPARTMENT, BUILDING AND SAFETY DIVISION. ALL SPECIAL <br />INSPECTIONS REQUIRED IN SEC. 1704 & 1705 NEED TO BE INCLUDED IN THE SPECIAL INSPECTION & TESTING FORM. <br />ANY WORK DONE IN THE FIELD NEED A FIELD INSPECTION & REPORT FROM TESTING SHOULD BE SENT TO <br />BUILDING SERVICES DIVISION.. UBC ALSO REQUIRES MILUSHOP CERTIFICATION (OR ICBO EVALUATION SERVICE <br />NUMBER) IF ANY WORK IS DONE IN A SHOP; THE CERTIFICATION MUST BE ISSUED BY AN APPROVED AGENCY. <br />2. ALL HIGH-STRENGTH BOLTING SHALL BE INSPECTED BY AN APPROVED INSPECTION AGENCY IN ACCORDANCE W/ <br />CBC SECTION 1705A.2.1 SUBMIT REPORTS TO THE DEVELOPMENT DEP., BUILDING AND SAFETY DIVISION. <br />3. A PROPOSAL FOR SPECIAL INSPECTION IS REQUIRED TO BE SUBMITTED PRIOR TO ISSUANCE OF PERMITS, THE <br />PROPOSAL MUST: 1) IDENTIFY THE SCOPE OF REQUIRED INSPECTIONS, 2) IDENTIFY THE APPROVED INSPECTION <br />FIRM & INDIVIDUAL(S) PERFORMING THE INSPECTIONS, 3) SPECIFY THAT ALL INSPECTIONS MUST BE AS PER <br />BUILDING DEPARTMENT APPROVED PLANS, NOT SHOP DRAWINGS. THE FOLLOWING SPECIAL INSPECTIONS ARE <br />REQUIRED FOR THIS PROJECT: a) CONCRETE: fc= IF OVER 2500 PSI, SPECIFY ON PLANS. b) FIELD AND SHOP <br />WELDING (DEFINE AS APPLICABLE) c) HIGH STRENGTH BOLTING d) OBSERVATION OF SOIL EXCAVATION & <br />FOUNDATION CONSTRUCTION OPERATIONS BY A REPRESENTATIVE OF THE GEOTECHNICAL FIRM IDENTIFIED <br />BELOW: <br />4. ALL DECORATIVE MATERIALS MUST BE FIRE <br />RETARDANT. <br />5, ALL DUCT WORK SHALL BE CONSTRUCTED, ERECTED AND TESTED IN ACCORDANCE WITH THE MOST RESTRICTIVE <br />OF ASHRAE, SMACNA AND THE CALIFORNIA CODE. <br />6. MECHANICAL CONTRACTOR SHALL PROCURE THE SERVICES FOR THE RECOGNIZED TEST AND BALANCE AGENCY <br />WHICH SPECIALIZES IN TESTING AND BALANCING OF HVAC SYSTEMS RESULTS SHALL BE SUBMITTED TO THE <br />ARCHITECT, ENGINEER AND BUILDING SERVICES DIVISION FOR REVIEW. <br />7. SOILS ENGINEER TO OBSERVE GRADING & EXCAVATION AND SUBMIT TESTING REPORTS TO THE BUILDING <br />DEPT. PER THE SOILS REPORTS. <br />8. GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS OF BUILDING AND SITE AND REPORT ANY <br />DISCREPANCIES TO THE OWNER OR ARCHITECT BEFORE SUBMITTING BIDS OR BEGINNING WORK. THE <br />CONTRACTOR SHALL ALSO VERIFY ALL UTILITY LOCATIONS AND DEPTHS AS INDICATED HEREON AND SHALL BE <br />RESPONSIBLE FOR REPORTING ANY DISCREPANCIES BETWEEN THESE PLANS AND EXISTING CONDITIONS PRIOR TO <br />SUBMITTAL OF BID OR BEGINNING WORK. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING AND <br />OBTAINING THEIR RESPECTIVE CONSTRUCTION PERMITS ARRANGING GOVERNMENTAL INSPECTIONS AND <br />APPROVALS. <br />9. ANY CONSTRUCTION ON STATE HIGHWAYS MUST CONFORM TO BOTH LOCAL JURISDICTION AND STATE <br />DIVISION OF HIGHWAYS SPECS. OBTAIN AN ENCROACHMENT PERMIT FROM THE CAL TRANS OFFICE 1352 W, <br />OLIVE AVE. PRIOR TO ANY WORK OFF SITE. <br />10. ANY CONSTRUCTION OUTSIDE OF PROPERTY INCLUDING UTILITIES, PAVING CURBS, AND EARTHWORK MUST MEET <br />ALL PERTINENT AND APPLICABLE SPECIFICATIONS AND STANDARDS OF AND SHALL BE INSPECTED AND APPROVED <br />BY CITY/COUNTY, STATE AND/OR LEGAL REPRESENTATIVE OF THE CITY/COUNTY. <br />11. REPAIR ALL DAMAGED AND/OR OFF GRADE OFF-SITE CONCRETE IMPROVEMENTS AS DETERMINED BY THE <br />CONSTRUCTION MANAGEMENT DIVISION OF THE GOVERNING REGULATORYAGENCY(S). <br />12. ANY SURVEY MONUMENTS WITHIN T4 AREA OF CONSTRUCTION SHALL BE PRESERVED OR RESET BY A REGISTERED <br />CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. <br />13. ALL SIGN PROPOSALS TO BE SUBMITTED TO PLANNING DEPARTMENT OF GOVERNING JURISDICTION PRIOR TO <br />INSTALLATION FOR VERIFICATION OF COMPLIANCE WITH ZONING ORDINANCES. SEPARATE SITE PLAN REVIEW <br />REQUIRED. SIGNAGE UNDER SEPARATE CONTROL BY OWNER. <br />14. THE CONSTRUCTION OF ANY OVERHEAD IN THE RIGHT OF WAY IS PROHIBITED UNLESS AN ENCROACHMENT <br />PERMIT IS ISSUED FOR THE SPECIFIC USE. ENCROACHMENT PERMITS MUST BE APPROVED PRIOR TO ISSUANCE OF <br />BUILDING PERMITS. <br />15. CODES AND REGULATIONS: THE MOST CURRENT AND RECENT EDITIONS AND CODES, STANDARDS, AND <br />REGULATIONS ADOPTED BY CITY/COUNTY SHALL GOVERN THE WORK OF THESE DRAWINGS AND SPECIFICATIONS; <br />THE MOST CURRENT CBG & CFC. SHALL GOVERN INCLUDING ALL RELATED TRADE CODES. <br />16. DISABLED ACCESS REQUIREMENTS: BUILDING/SITE ACCESS, SIGNAGE, DOORS, HARDWARE, DRINKING FOUNTAINS <br />TOILET ROOM ACCESSORIES, AND ALL OTHER APPLICABLE MATERIAL SYSTEMS, FIXTURES, FURNITURE, FINISHES, <br />CONSTRUCTION AND LOCATIONS SHALL FULLY COMPLY WITH THE MOST RECENT EDITIONS OF THE CITY/COUNTY, <br />AND STATE OF CALIFORNIA "ARCHITECTURAL BARRIERS LAW CAL/ABL" RULES AND REGULATIONS, , <br />AS WELL AS <br />CURRENT FEDERAL "ACCESSIBILITY" REQUIREMENTS AND REGULATIONS. <br />17. ADA:AMERICAN DISABILITY ACT: THIS PROJECT IN ITS ENTIRETY HAS BEEN DESIGNED TO ANTICIPATE ALL <br />REQUIREMENTS OF THE ADA STDS. & THE CBC CODE. INTERPRETATIONS WHERE NECESSARY OR <br />THE PRIOR T PROCEEDING. <br />UNCLEAR SHALL BE BROUGHT TO THE ATTENTION OF ARCHITECT O O <br />18. STATE ENERGY REGULATORY: ALL MATERIALS, PRODUCTS, PRODUCT ASSEMBLIES, AND OTHER BUILT-UP OR <br />INDIVIDUAL COMPONENTS OF THE WORK SHALL FULLY MEET AND COMPLY WITH ALL APPLICABLE CODES AND <br />SECTIONS OF THE STATE OF CALIFORNIA ENERGY CODES AND REGULATIONS FOR NONRESIDENTIAL BUILDINGS. <br />19. TYPICAL DETAILS: SEE TYPICAL DETAIL SHEET WHICH DESCRIBES ALL TYPICAL DETAILS FOR STANDARD <br />NON -TYPICAL STANDARD DETAILS AS APPLICABLE TO SPECIFIC OR GENERAL CONDITIONS. <br />20. CERTIFICATION OF CONSTRUCTION COMPLIANCE: AT TIME OF REQUEST FOR FINAL INSPECTION OF <br />CERTIFICATION OF CONSTRUCTION COMPLIANCE MUST BE SUBMITTED TO THE THE CITY/COUNTY BY THE <br />CONTRACTOR INDICATING THAT ALL WORK DONE AND ALL MATERIALS OF APPLICABLE FEDERAL, STATE AND <br />LOCAL CODES AND REGULATIONS. CONTRACTOR SHALL ALSO FILE A WRITTEN CERTIFICATE OF COMPLIANCE <br />WITH REQUIRED APPLICATIONS OF THE CALIFORNIA ENERGY CONSERVATION STANDARDS FOR <br />NONRESIDENTIAL BUILDINGS. THIS REPORT SHALL INDICATE, BASED ON PERSONAL KNOWLEDGE, THAT THE <br />WORK APPEARS TO HAVE BEEN PERFORMED IN COMPLIANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. <br />21. EVERY EXIT DOOR SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL <br />KNOWLEDGE OR EFFORT. FLUSH BOLTS OR SURFACE BOLTS ARE PROHIBITED. SPECIAL LOCKING DEVICES <br />SHALL BE OF AN APPROVED TYPE AND WHEN PERMITTED WITH DOOR SHALL BE IDENTIFIED WITH A VISIBLE SIGN <br />ABOVE THE DOOR HAVING NOT LESS THAN 1" HIGH LETTERS, STATING "THIS DOOR TO REMAIN UNLOCKED WHEN <br />BUILDING IS OCCUPIED ". <br />22. ALL GLAZING WITHIN T-0" OF DOORS: (C.B.C. SECTIONS 1405.13, 1710.5, & 2406) (EXCEPT WHERE INTERRUPTED BY <br />AN INTERIOR WALL THAT IS PERPENDICULAR TO THE GLAZED WALL) AND ALL GLAZING WITHIN Z -O" OF DOORS <br />SHALL BE FULL HEIGHT TEMPERED GLASS. ALL GLAZING ADJACENT TO EXTERIOR WALKS (EXCEPT WHERE <br />INTERRUPTED BY AN INTERMEDIATE HORIZONTAL RAIL AT+24" TO +36" ABOVE THE FLOOR OR WHERE THE SILL IS <br />+18" MINIMUM ABOVE THE FLOOR) SHALL BE FULL HEIGHT TEMPERED GLASS WHERE THERE IS 9 S.F. OR LARGER <br />PER LITE. ALL DOOR GLASS AND GLAZING AND ALL WINDOW, SHOWER STALL DOORS, AND MIRROR GLASS AND <br />GLAZING SHALL FULLY MEET AND COMPLY WITH THE MOST RECENT EDITION OF THE C.B.C. STANDARDS AND ALL <br />RECENT AND APPLICABLE FEDERAL AND STATE STANDARDS FOR GLASS AND GLAZING. ALL GLAZING SHALL <br />CONFORM TO THE U.S. PRODUCT SAFETY COMMISSION'S "SAFETY STANDARDS FOR ARCHITECTURAL MATERIALS" <br />(16CFR1201). <br />23. EXIT SIGNAGE: ALL EXIT SIGNAGE AS INDICATED ON THE DRAWINGS AND SPECIFIED SHALL BE POSTED AS <br />DIRECTED AND APPROVED BY AN AUTHORIZED REPRESENTATIVE OF THE CITY/COUNTY AT TIME OF INTERIOR <br />IMPROVEMENTS, OR BEFORE OCCUPANCY PERMITS ARE ISSUED. EXIT SIGNS & LIGHTING SHALL CONFORM TO CBC <br />& IBC. WHERE REQ. INSTALL 6" H. ILLUMINATED "EXIT" SIGNS @ EXITS. <br />24. ROOM CAPACITY SIGNS SHALL BE INSTALLED BY THE OWNER AS REQUIRED AND DIRECTED BY THE BUILDING AND <br />FIRE DEPARTMENTS. <br />25. ALL CRACKS AND BUILDING ENVELOPE PENETRATIONS MUST BE CAULKED GASKETED OR 156 <br />WEATHER-STRIPPED TO LIMIT AIR LEAKAGE. <br />26. INTERIOR FINISHES AND FLAME PROOFING SHALL CONFORM TO WITH CHAPTER 8 OF THE CBC. <br />27. INTERIOR WALL AND CEILING FINISHES FOR EXIT CORRIDORS SHALL NOT EXCEED AN END POINT FLAME <br />SPREAD RATING OF 25 FOR ENCLOSED VERTICAL EXIT WAYS AND 75 FOR OTHER EXIT WAYS. <br />28. EXCAVATION ENCROACHMENT PERMITS ARE REQUIRED FOR ALL WORK DONE IN THE CITY RIGHT-OF-WAY. <br />29. SEE BUILDING INFORMATION ON THIS SHEET FOR LIST OF SPECIAL INSPECTIONS PER CBC. <br />30. ALL MECHANICAL EQUIPMENT SHALL BE ADEQUATELY SCREENED TO PREVENT VISIBILITY FROM STREET. <br />31, COMBUSTIBLE DEBRIS, RUBBISH AND WASTE MATERIAL SHALL NOT ACCUMULATED WITHIN BUILDINGS. RUBBISH <br />AND WASTE MATERIAL SHALL BE REMOVED AS OFTEN AS PRACTICAL <br />32. PER CBC SECTION 1704 EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND OR <br />SEISMIC FORCE RESISTING SYSTEM LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL SUBMIT A <br />WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL, THE OWNER PRIOR TO COMMENCEMENT <br />OF WORK & SHALL CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS STATED IN <br />THE SPECIAL INSPECTIONS. <br />GENERAL NOTES: <br />DRAWINGS AND SPECIFICATIONS: <br />EACH BIDDER/CONTRACTOR SHALL THOROUGHLY EXAMINE ALL DOCUMENTS AND CONDITIONS PRIOR TO BID AND <br />START OF WORK. THESE DOCUMENTS CONSTITUTE THE CONTRACT DOCUMENTS DESCRIBING THE GENERAL DESIGN <br />AND CHARACTERISTICS OF THE PROJECT. WHEN THESE DOCUMENTS ARE VAGUE OR CONTRADICTORY, IN PART OR <br />IN WHOLE, THE CONTRACTOR SHALL BE OBLIGATED TO PROVIDE THE MOST STRINGENT WRITTEN OR DRAWN <br />INTERPRETATION, HE SHALL BE RESPONSIBLE TO AND LIABLE FOR CORRECTING OR COMPLETELY REPLACING SUCH <br />WORK UPON REQUIREMENTS. IN NO CASE SHALL THE CONTRACTOR(S) PROCEED WITH WORK THAT IS UNCLEAR OR <br />IN CONTRADICTION WITHOUT FIRST RECEIVING INSTRUCTION FROM THE ARCHITECT, AT CONTRACTOR'S SOLE COSTS. <br />MCUS MAJOR REMODEL <br />322 S. CENTER ST., STOCKTON, CA 95243 <br />BUILDING INFORMATION <br />ADDRESS: <br />STREET ADDRESS 322 S. CENTER ST. <br />CITY: STOCKTON <br />STATE CA <br />McDONALD'S REGION: PACIFIC SIERRA REGION <br />STATE SITE CODE 004-3666 <br />COUNTY: TU ARE <br />APN: 119-03-034 PARCEL 1 <br />STRUCTURE: <br />EXISTING LIGHT GAUGE METAL STUD CONSTRUCTION w/ <br />WOOD TRUSSES. NEW CONSTRUCTION TO BE LIGHT <br />GAUGE METAL FRAMING <br />UTILITIES - <br />GAS UTILITIES (EXISTING) <br />ELECTRIC UTILITIES<E> TO REMAIN <br />SPLIT UTILITIES <E> TO REMAIN <br />BUILDING DATA: <br />OCCUPANCY TYPE` <br />ALLOWABLE AREA PER TABLE 503 BASIC ALLOWABLE <br />FLOOR AREA PER 2016 CBC V -B = 6,000 S.F. <br />CONSTRUCTION TYPE V -B <br />NUMBER OF STORIES, 1 <br />BUILDING HEIGHT: <E> 19-6" T/PARAPET <br />TOWER HEIGHTS, <E> 32'-0" TrrOWER <br />PLAYPLACE HEIGHT N/A _ <br />CONDITIONED SPACE: <br />COOLER/FREEZER: <br />ADDITION: <br />TOTAL: <br />EXISTING PROPOSED <br />6 063 .F. <br />6 063 S.F. <br />315 S.F. <br />315 S.F. <br />N/A <br />369 S.F. <br />6,378 S.F. <br />6,747 S.F. <br />OCCUPANT LOAD: <br />DRAWING INDEX <br />Cover & ADA <br />DINING AREA PER TABLE (1004.1.1): <br />42 SEATS <br />PLAYPLACE <br />/A <br />EMPLOYEES: <br />13 <br />CUSTOMER SERVICE: <br />15 <br />CONVENIENCE STORE: <br />33 <br />TOTAL OCCUPANT LOAD: <br />103 <br />CONSULTANTS <br />ARCHITECT )IGEN INCORPORATED <br />L.S. ARCHITECT 516 W. Shaw Ave. Suite 101 <br />ELECTRICAL Fresno, CA 93704 <br />Tel: (55 <br />9) 268-2711 <br />CIVIL ENGINEER <br />MQUA ENTERPRISE <br />5699 N. 7th Street <br />Fresno, CA 93710 <br />Tel: (559) 268-2711 <br />STRUCTURAL ENGINEER PLATINUM Engineering <br />Solutions Inc. <br />10648 N. HWY. 41 <br />Madera, CA 93638-9469 <br />Tel. (559) 439-0500 <br />Fax. (559) 433-6433 <br />MECHANICAL & LMR Engineering <br />PLUMBING ENGINEER 1165 A Street <br />Hayward, CA 94541 <br />Tel. (510) 733-2330 <br />Fax. (510) 733-0332 <br />BUILDING INFORMATION: <br />BUILDING CODE: <br />CALIFORNIA BUILDING CODE: 2016 CBC <br />MECHANICAL CODE EDITION: 2016 CMC <br />ELECTRICAL CODE EDITION: 2016 CEC <br />PLUMBING CODE EDITION: 2016 CPC <br />CALIFORNIA FIRE CODE 2016 CFC <br />NEC: 2010 <br />CALIFORNIA ENERGY CODE: 2016 CEC <br />CALIFORNIA CODE OF 2013 NFPA <br />REGULATIONS/2010/TITLE 24 <br />DESIGN LOADS/ STANDARDS: <br />ROOF LIVE LOAD: 20 PSF <br />ROOF DEAD LOAD: 20 PSF <br />WIND LOAD: 110 MPH <br />EXPOSURE' C <br />SOIL SITE CLASS D <br />SOIL BEARING CAPACITIES: 1,500 PSF <br />SPECIAL INSPECTIONS REQUIRED: 1,2.4,5 67 <br />SEISMIC CATEGORY: D <br />SPECIAL INSPECTIONS (SEE ABOVE): <br />1. PERIODIC INSPECTION FOR SEISMIC RESISTANCE IS <br />REQUIRED FOR WOOD SHEAR WALLS, WOOD <br />DIAPHRAGMS, DRAG STRUTS/COLLECTORS (CHORDS), <br />SHEAR PANELS, SILL BOLTS, HOLD DOWN, ETC. WHERE <br />NAILING IS 4" o.c. OR LESS (CBC 1707.3) <br />2. RESPONSIBLE CONTRACTOR OF MAIN W1 ND- OR <br />SEISMIC- FORCE RESISTING SYSTEMS (CBC 1709.1) <br />3. SOILS COMPACTION & REPORTS <br />4. CONCRETE CYLINDERS, 3 PER DAY w/ SLUMP TEST FOR <br />CONCRETE SLABS & FOUNDATIONS. (3,000 psi) <br />5. FIELD WELDING <br />6. SUSPENDED METAL CEILING SYSTEMS. <br />7. SEE GENERAL NOTES #32 <br />LIFE SAFETY SYSTEM: <br />EMERGENCY LIGHTING: X YES _ NO <br />EXIT SIGNS: X YES _ NO <br />FIRE ALARM AND SMOKE <br />DETECTION SYSTEMS: X YES _ NO <br />PANIC HARDWARE: X YES _ NO <br />FIRE SPRINKLERS: X YES _ NO <br />LIFE SAFETY: <br />A) THE TYPE I HOOD WILL BE EQUIPPED WITH AN <br />APPROVED AUTOMATIC FIRE EXTINGUISHING <br />SYSTEM. <br />B) PLANS AND SPECIFICATIONS WILL BE SUBMITTED TO <br />THE CITY OF STOCKTON , FIRE MARSHAL, FOR <br />REVIEW, APPROVAL, AND PERMIT ISSUANCE PRIOR <br />TO INSTALLATION OF ALL FIRE SUPPRESSION <br />SYSTEMS. <br />C) THE CONTRACTOR(S) SHALL NOT COMMENCE ANY <br />O <br />ADDITIONAL WORK, NOR INCUR ANY ADDITIONAL <br />COSTS OR TIME(VIMOLE OR INPART) WHERE ANY <br />SUCH COSTS AND OR TIME MAY OR DOES IMPACT <br />THE OWNER, ARCHITECT, OR ENGINEER AND SUCH <br />SHALL NOT BE INCURRED BY CONTRACTOR OR <br />SUBCONTRACTOR WITHOUT PRIOR WRITTEN <br />APPROVAL OF EACH AND EVERY AFFECTED PARTY <br />(INCLUDING OWNER, ARCHITECT, AND ENGINEERS). <br />NO CHANGES TO SPECIFICATIONS, PRODUCTS, OR <br />CHANGE ORDERS WITHOUT ARCHITECT'S WRITTEN <br />AUTHORIZATION. J <br />HEALTH DEPARTMENT NOTES: <br />PLANS SUBMITTED FOR RESTAURANTS SHALL BE APPROVED BY THE HEALTH DEPARTMENT PRIOR TO PLUMBING <br />BACK CHECK PER 2016 CPC 101.3 <br />1. COMPLETED CONSTRUCTION MUST CONFORM TO ALL PROVISIONS OF THE CURRENT CALIFORNIA RETAIL <br />FOOD CODE (CAL -CODE). <br />2. THIS ESTABLISHMENT WILL REQUIRE A MINIMUM OF THREE INSPECTIONS PRIOR TO OPENING. IT IS THE <br />RESPONSIBILITY OF THE OWNER AND/OR REPRESENTATIVE TO CONTACT THE GOVERNING HEALTH <br />DEPARTMENT FOR THESE INSPECTIONS. THE CONTACT TIME FOR THESE INSPECTIONS SHOULD BE AS FOLLOWS: <br />1ST INSPECTION: IMMEDIATELY AFTER INSTALLATION OF THE ROUGH PLUMBING BUT PRIOR TO CONCRETE POUR. <br />2ND INSPECTION: AFTER SURFACES (WALLS, FLOORS CEILINGS, ETC) ARE COMPLETED BUT PRIOR TO EQUIPMENT <br />INSTALLATION. <br />3RD INSPECTION: UPON COMPLETION OF CONSTRUCTION, BUT PRIOR TO OPENING FOR BUSINESS. <br />DEFERRED ITEMS: <br />1, NOT USED <br />2. ALL SIGNAGE (INCLUDING DRIVE-THRU MENU SIGNAGE) SHALL BE UNDER SEPARATE PERMIT AND WILL BE <br />SUBMITTED TO THE PLANNING DIVISION AS A DEFERRED SUBMITTAL, ALL SIGNS SHALL COMPLY WITH PROVISIONS <br />ESTABLISHED IN (MDP 2010.05). <br />3. METAL CANOPIES & WALK IN COOLER TO BE PROVIDED BY OTHER AS A DEFERRED SUBMITTAL. <br />4. NOT USED <br />5. ALL ITEMS (ABOVE) REQUIRING DEFERRED SUBMITTAL SHALL BE BY SEPARATE PLAN CHECK SUBMITTAL & REVIEW BY <br />THE LOCAL GOVERNING AGENCY & SHALL RECEIVE SEPARATE APPROVAL, PERMIT & FEES PAID PRIOR TO ISSUANCE OF <br />PERMITS OF SUCH WORK. <br />6, THE AVAILABLE FAULT CURRENT LETTER, PROVIDED BY THE UTILITY COMPANY (ON UTILITY COMPANY LETTERHEAD), <br />SHALL BE PROVIDED TO THE CITY PRIOR TO THE FIRST FOUNDATION INSPECTION. <br />REVISIONS <br />DRAWING INDEX <br />Cover & ADA <br />n <br />E D c B A <br />K1 KITCHEN LAYOUT SHEET <br />Z u <br />AOb ADA Notes <br />CV Cover Sheet <br />K2.1 KITCHEN SCHEDULE & ELEVATIONSDUO <br />AOd Finish Schedules & Details <br />Al <br />CVa Abbreviations Key & Symbols <br />Floor Plan <br />CG1 CAL Green <br />v7 <br />0 <br />N <br />V <br />Z <br />SITE & CIVIL <br />_0 <br />Cl Grading Plan <br />PLUMBING MBING PI ANS <br />In <br />AC1 Site Plan <br />A1d Demolition Floor Plan <br />P1 Water Piping Plan <br />__ <br />LU <br />ACta Site Notes & Details <br />Y <br />w p <br />LU <br />AC1b Typ, Site Details <br />ECrt <br />Ir <br />o <br />a d <br />AC1c Trash Enclosure Details <br />0 rn m <br />P4 Water Piping Diagram <br />AC1f Drive-Thru Details (FOR REF. ONLY) <br />A3 Roof Plan <br />0 <br />AO ADA Details <br />n <br />AOa ADA Notes <br />K1 KITCHEN LAYOUT SHEET <br />Z u <br />AOb ADA Notes <br />z � $ <br />z <br />K2.1 KITCHEN SCHEDULE & ELEVATIONSDUO <br />AOd Finish Schedules & Details <br />Al <br />LU - _ 24E ' <br />Floor Plan <br />Ala Door/WindowSchedules/Details <br />0 <br />N <br />V <br />Alb Toilet / Detail <br />N N <br />w <br />A1c Exiting Plan <br />PLUMBING MBING PI ANS <br />> <br />A1d Demolition Floor Plan <br />P1 Water Piping Plan <br />__ <br />Ale Front Counter Details <br />P2 Waste and Vent Pian <br />Y <br />w p <br />A2 Exterior Elevations <br />ECrt <br />A2a Exterior Elevations <br />o <br />a d <br />0 <br />0 rn m <br />P4 Water Piping Diagram <br />�J <br />0= <br />A3 Roof Plan <br />I <br />W U o <br />A4 Reflected Ceiling Plan <br />H w <br />Z <br />A4a Ceiling Details <br />m Z N <br />0 <br />o t <br />o <br />ma W O <br />A5 Seating Plan <br />uE <br />a o o <br />3 U H 7 <br />A6 Wall Sections <br />MECHANICAL <br />a o U <br />A8 Details <br />_ <br />N mN O " <br />A8a Details <br />���� <br />" , N F_0 <br />F_ nC`7W OUo <br />ASb Details <br />(l ) i s <br />N <br />5 <br />cPFCIFIC TIONS w �\�c o /�dou <br />SA1/SA3 Specifications r M a i <br />4� N " i <br />O U <br />_ " w o <br />';TRI Ir <br />SOa Details <br />SOb Details <br />SOc Details <br />S1 Foundation Plan <br />S2 Roof Framing Plan <br />S5 Foundation Details <br />S6 Wall Sections & Details <br />KITCHEN EQUIPMENT <br />n <br />K1 KITCHEN LAYOUT SHEET <br />K2 KITCHEN EQUIPMENT PLAN <br />K2.1 KITCHEN SCHEDULE & ELEVATIONSDUO <br />Q <br />V <br />Y <br />N <br />PLUMBING MBING PI ANS <br />P1 Water Piping Plan <br />__ <br />3 <br />P2 Waste and Vent Pian <br />0 <br />((� <br />P3 Gas and Refrigerant Piping <br />o <br />a d <br />0 <br />P4 Water Piping Diagram <br />�J <br />0= <br />0 <br />N <br />O v <br />0 <br />o t <br />o <br />uE <br />a o o <br />MECHANICAL <br />o <br />a „� <br />E o a <br />o <br />0 <br />MT1 Envelope Analysis <br />���� <br />MT2 Envelope Analysis <br />(l ) i s <br />N <br />M1 Ductwork Ian <br />P <br />v a <br />E � <br />z <br />om <br />rnv7 <br />0 <br />w <br />a <br />FLFrTRIQAL <br />MCI <br />EO.0 Electrical Site Plan <br />a = <br />N <br />E1 Kitchen Electrical Rough -In Plan <br />s - <br />a a <br />E1.3 Kiosk Plan & Elevation <br />8 d <br />ElA Menu Board Details <br />Ff <br />N <br />E2.0 Lighting Plan <br />o <br />E3.0 Lighting Control <br />E3.1 Pos Riser Diagram <br />z <br />EN1 Title 24 Compliance <br />O <br />EN2 Title 24 Compliance <br />(' <br />EN3 Title 24 Compliance <br />EN4 Title 24 Compliance <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 E.HAZELTONAVE, <br />z <br />SMKTON,CA95205' <br />o <br />z <br />(Pf)9) 4680 <br />Q <br />zz <br />S2 <br />O <br />g <br />W <br />o <br />p�p, <br />proved[ witinchangp5 Sae RelnarlZ§ <br />> <br />> <br />a <br />i7 Dlsepproyed: See R <br />OW <br />z <br />w N <br />II <br />Remarks �Y iN� �� Y7 0 '1'I -1S <br />a <br />o <br />U Y <br />O O <br />0 <br />o111 <br />C7 <br />60 <br />of <br />z <br />Y <br />Z <br />m <br />o <br />Date e7 BY <br />0 Y <br />¢ <br />Apprbvaf extends only to that which is shown'aA described <br />" O <br />m o <br />o <br />o <br />hereon and does not authorize or approve any omission or <br />w <br />= <br />" <br />F S <br />J <br />deviation from requirements of stale laws or localordinances. <br />THESE DRAWINGS, DESIGNS, SKETCHES, IDEAS, <br />ARRANGEMENTS AS WELL AS ANY AND ALL <br />ELECTRONIC FILES AND/OR DWGS ARE THE SOLE <br />AND EXCLUSIVE PROPERTY OF VIGEN INC., AND <br />MCDONALD'S CORP. , AND WERE CREATED AND <br />DEVELOPED BY AND FOR THE ARCHITECTS <br />WORK, NOTHING CONTAINED OR REPRESENTED <br />ON THESE DOCUMENTS SHALL BE USED BY OR <br />DISCLOSED TO ANY PERSON, FIRM OR <br />CORPORATION FOR ANY PURPOSE WITHOUT <br />THE EXPRESSED WRITTEN CONSEM OF VIGEN <br />INC. THE WORK CONTAINED ON THESE DWGS <br />AND DOCUMENTS IS CREATED ONLY FOR THIS <br />PROJECT AT THIS TIME AND NO OTHER, AND <br />NOT FOR OTHER RELATED, IMPLIED, OR FUTURE <br />WORKIS! OR PROJECTISI. <br />CV <br />