My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 9:06:10 AM
Creation date
1/11/2023 9:20:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC TEST FAIL <br /> ALARM DISABLED =------------------------ <br /> _____ <br /> ANNUAL TEST FAIL Request: 65 - 161100 - Tank Leak Test Type and Start Time <br /> ALARM DISABLED Request Source: Monitor System Configuration Requests - <br /> Line: 65 <br /> 4 GROSS TEST FAIL <br /> ALARM DISABLED <br /> PERIODIC TEST FAIL <br /> ALARM DISABLED 161100 <br /> ANNUAL TEST FAIL FEB 1, 2023 9:58 AM <br /> ALARM DISABLED <br /> LEAK TEST METHOD <br /> TEST ON DATE : TANK 1 <br /> ____________________________ JAN 29, 2009 <br /> ----- -------- ---- <br /> Request: 60 - 163100 - Tank Leak Test Averaging START TIME : DISABLED <br /> Request Source: Monitor System Configuration Requests - TEST RATE :0.20 GAL/HR <br /> Line: 60 DURATION : 2 HOURS <br /> TST EARLY STOP:DISABLED <br /> 163100 TEST ON DATE : TANK 2 <br /> FEB 1, 2023 9:58 AM JAN 29, 2009 <br /> START TIME : DISABLED <br /> TANK LEAK TEST AVERAGING TEST RATE :0.20 GAL/HR <br /> DURATION : 2 HOURS <br /> TANK PRODUCT LABEL ANNUAL PERIODIC <br /> 1 SUPREME OFF OFF TST EARLY STOP:DISABLED <br /> 2 REGULAR OFF OFF <br /> 3 OFF OFF TEST ON DATE : TANK 3 <br /> 4 OFF OFF JAN 29, 2009 <br /> START TIME : DISABLED <br /> TEST RATE :0.20 GAL/HR <br /> ------------------------- DURATION : 2 HOURS <br /> Request: 61 - 163000 - Tank Leak Test notify <br /> Request Source: Monitor System configuration Requests - TST EARLY STOP:DISABLED <br /> Line: 61 <br /> TEST ON DATE : TANK 4 <br /> JAN 29, 2009 <br /> START TIME : DISABLED <br /> 163000 TEST RATE :0.20 GAL/HR <br /> FEB 1, 2023 9:58 AM DURATION : 2 HOURS <br /> IN-TANK LEAK TEST NOTIFY TST EARLY STOP:DISABLED <br /> TANK PRODUCT LABEL TANK TEST NOTIFY: <br /> 1 SUPREME OFF ____________________________ <br /> 2 REGULAR OFF Request: 66 - 161300 - CSLD Probability Of Detection <br /> 3 OFF Request Source: Monitor System Configuration Requests - <br /> 4 OFF Line: 66 <br /> ---------------------------- <br /> Request: 62 - 163200 - Tank TestSiphon Break 161300 <br /> Request Source: Monitor System Configuration Requests - FEB 1, 2023 9:58 AM <br /> Line: 62 CSLD PROBABLITY OF DETECTION <br /> 163200 =--------------------------- <br /> ----- -------- - <br /> FEB 1, 2023 9:58 AM Request: 67 - 161400 - CSLD Climate Factor <br /> Request Source: Monitor System Configuration Requests - <br /> TANK TEST SIPHON BREAK Line: 67 <br /> TANK PRODUCT LABEL SIPHON BREAK <br /> 1 SUPREME OFF <br /> 2 REGULAR OFF 161400 <br /> 3 OFF FEB 1, 2023 9:58 AM <br /> 4 OFF CSLD CLIMATE FACTOR <br /> Request: 63 - 161000 - Tank delivery Delay -------- - ---- <br /> Request Source: Monitor System configuration Requests - Request: 68 - 161600 - ACCUChart update Scheduling <br /> Line: 63 Request Source: Monitor System Configuration Requests - <br /> Line: 68 <br /> 161000 <br /> FEB 1, 2023 9:58 AM 161600 <br /> FEB 1, 2023 9:58 AM <br /> TANK DELIVERY DELAY <br /> TANK PRODUCT LABEL CAL UPDATE <br /> TANK PRODUCT LABEL 1 SUPREME IMMEDIATE <br /> 1 SUPREME 5 2 REGULAR IMMEDIATE <br /> 2 REGULAR 5 3 IMMEDIATE <br /> 3 1 4 IMMEDIATE <br /> 4 1 <br /> ---------------------------- ---------------------------- <br /> Request: 64 - 163A00 - Tank 10W Level Threshold for Line Request: 69 - 161A00 - In-Tank Leak Test Early Stop <br /> Manifold Request Source: Monitor System Configuration Requests - <br /> Request Source: Monitor System Configuration Requests - Line: 69 <br /> Line: 64 <br /> 161A00 <br /> 163A00 FEB 1, 2023 9:58 AM <br /> FEB 1, 2023 9:58 AM <br /> IN-TANK LEAK TEST EARLY STOP <br /> LOW LEVEL PUMP THRESHOLD FOR SEQUENTIAL LINE MANIFOLD <br /> TANK PRODUCT LABEL TST EARLY STOP: <br /> TANK PRODUCT LABEL PUMP THRESHOLD 1 SUPREME DISABLED <br /> 1 SUPREME 10.00% 2 REGULAR DISABLED <br /> 2 REGULAR 10.00% 3 DISABLED <br /> 3 10.00% 4 DISABLED <br /> 4 10.00% <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.