My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 9:06:10 AM
Creation date
1/11/2023 9:20:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br />Tank ID 1-Super 91 2-Regular 87 <br />Tank Manufacturer XERXES XERXES <br />Tank Capacity 12K 12K <br />Test Start Time 12:00 12:00 <br />Initial Reading -10" Hg. -10" Hg. <br />Test End Time 1:00 1:00 <br />Final Reading -10" Hg. -10" Hg. <br />Change in Reading 0" Hg. 0" Hg. <br />Pass/Fail Criteria No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Pipe Run ID 1-Super 91 2-Regular 87 <br />Pipe Manufacturer Smith Smith <br />Test Start Time 12:05 12:05 <br />Initial Reading 3 Psi 3 Psi <br />Test End Time 1:05 1:05 <br />Final Reading 3 Psi 3 Psi <br />Change in Reading 0 Psi 0 Psi <br />Pass/Fail Criteria No Loss No Loss <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br />6. TANK SECONDARY CONTAINMENT TEST <br />7. PIPE SECONDARY CONTAINMENT TEST
The URL can be used to link to this page
Your browser does not support the video tag.