GENERAL PROJECT NOTES: ESCALON AVENUE AND HIGHWAY 120 ESCALON , CALIFORNIA bp
<br /> I. ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE BUILDING CODES
<br /> AND LOCAL RESTRICTIONS. CONTRACTOR'S MUST COMPLY WITH CIVIL STE PLAN
<br /> CONTRACTOR REGISTRATION REQUIREMENTS OF ALL GOVERNING
<br /> AUTHORITIES. THE GENERAL BUILDING PERMITS SHALL BE PAID FOR BY LEGEND
<br /> THE OWNER. ALL OTHER PERMITS SHALL BE SECURED AND PAID FOR
<br /> BY THE SUBCONTRACTOR DIRECTLY RESPONSIBLE. ALL REQUIRED CITY,
<br /> COUNTY AND/OR STATE LICENSES SHALL BE ACQUIRED AND PAID FOR ;
<br /> BY THE INDIVIDUAL SUBCONTRACTOR. EXISTING ASPHALT r r f
<br /> t PROPOSED ASPHALT
<br /> 2. APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE
<br /> USED BY WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT THE / ` `' `:'
<br /> SAME INFORMATION. CONTRACTOR SHALL MAINTAIN ONE COMPLETE SET ' .i"'�' EXISTING CONCRETE PROPOSED CONCRETE
<br /> OF PLANS ON THE PREMISES IN GOOD CONDITION AT ALL TIMES, THIS
<br /> SHALL INCLUDE ALL ADDENDA AND CHANGE ORDERS,
<br /> 3. DISCREPANCIES BETWEEN PORTIONS OF THE CONTRACT DOCUMENTS, ___
<br /> " ------------------------- EXISTING CURB PROPOSED CONCRETE BARRIER CURB
<br /> DRAWINGS AND SPECIFICATIONS ARE NOT INTENDED. THE CONTRACTOR 0 10 20 40 ------------------
<br /> SAWCUT LINE
<br /> IS TO CLARIFY ANY SUCH DISCREPANCIES WITH THE �\ EXISTING EDGE OF PAVEMENT �..
<br /> ARCHITECT/CONSULTANT PRIOR TO COMMENCING WORK. \\
<br /> 4. STATED DIMENSIONS TAKE PRECEDENCE OVER GRAPHICS. DO NOT ` PROPERTY LINE
<br /> SCALE DRAWINGS TO DETERMINE LOCATIONS. THE _ _ ARCO_
<br /> ARCHITECT/CONSULTANT SHALL BE NOTIFIED OF ANY SUCH
<br /> DISCREPANCIES PRIOR TO CONTINUING WITH THE WORK• -- -
<br /> ROP LINE ml U�mr cm V00Mv LLC
<br /> 5. GENERAL CONTRACTOR WILL REFER TO THESE DOCUMENTS AS WELL AS - --- --/ --___ 24 SW
<br /> SPECIFICATIONS FOR IDENTIFICATION OF ALL OWNER SUPPLIED ITEMS, - --
<br /> ALL ITEMS NOT KED AS OWNER SUPPLIED' ARE TO BE SUPPLIED _________________- ,
<br /> BY THE GENERAL CONTRACTOR. UNLESS NOTED OTHERWISE, ALL ITEMS S89°26842�E R=58 00' L=271 a /''� 26 CRB AVEMENT Q
<br /> ARE TO BE INSTALLED BY THE GENERAL CONTRACTOR. LS 19
<br /> X279 d=2°40,
<br /> R 5W OJ' L=38.33'
<br /> 6. FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S - - - - - - - - - - - ---------_-:_:_____________ '0 6109" M
<br /> --------------- ------ _ °
<br /> 4''
<br /> APPROVED SHOP DRAWINGS/DATA SHEETS IN ACCORDANCE WITH THE d 14 CtJREt
<br /> PROJECT SPECIFICATIONS. 23 a q :e k ,
<br /> l4 rr
<br /> TRANSF RMER °.. , d . s � sEY 0 ®'
<br /> 7. THE CONTRACTOR SHALL 8E RESPONSIBLE FOR THE COMPLETE , £ . ,a ° '
<br /> -11
<br /> SECURITY OF THE SITE WHILE THE JOB IS IN PROGRESS AND UNTIL '�- ` -` •� � `�` � � `"`�� t�'. ��,' ° '� ' EX DRIVE
<br /> THE BUILDING IS OCCUPIED. '_r.---
<br /> '
<br /> WE DEVELOPMENT SCHEDULE
<br /> S. ALL DEBRIS SHALL 8E REMOVED FROM PREMISES AND ALL AREAS
<br /> SHALL BE LEFT IN A CLEAN (BROOM) CONDITION AT ALL TIMES. LS 19 `"` 'n axk sti 1 PROPOSED 3,000 SF CONVENIENCE STORE. SEE ARCHITECTURAL PLANS.
<br /> �� rnf „ly EXISTING CUR TO
<br /> ,fig, 15215 72ND AVENUE SOUTH
<br /> 9• CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE T � � � '- REMAIN PROPOSED FUELING ISLAND CANOPY. SEE CANOPY PLANS,
<br /> THE SAFETY OF THE WORKERS AT ALL TIMES. ( � 1 KENT, WA 95032
<br /> 14
<br /> (425)251-6222
<br /> 10• CONTRACTOR SHALL PROVIDE TEMPO WATER, POWER AND TOILET .. EXISTING SIDE ALK TO PROPOSED GAS UNDERGROUND STORAGE TANKS. SEE TANK PLANS, (425)251-5752 FAX
<br /> ASP�IALt 1
<br /> FACILITIES AS REQUIRED. CURB \ FUEL --- REMAIN (D
<br /> GRIL ENGINEERING, ISN® PLANNING,
<br /> % f :EllSt 14 PROPOSED TANK SLAB, SEE TANK PLANS.
<br /> 11< GENERAL CONTRACTOR IS RESPONSIBLE FOR RECEIVING, UNLOADING, ��`, .�,.,.. �' .r:a,,. t� J����T SURVEYING, ENVIRONMENTAL SERVICES
<br /> UN-CRATING, INSTALLATION AND HOOKUP OF ALL FOOD SERVICE ° 44
<br /> - CURB
<br /> EQUIPMENT AND OTHER OWNER FURNISHED ITEMS. ', < a. 4 a. PROPOSED FUELING ISLAND CONCRETES . SEE ARCHITECTURALNo. DATE REVISIONDESCRIPTION
<br /> 5
<br /> EXISTING a e k> 1 .91
<br /> a
<br /> PLANS FOR SLAB DETAIL D JOINT PLACEMENT
<br /> 50 _
<br /> 12. GENERAL CONTRACTOR IS REQUIRED TO LABEL ALL ELECTRICAL PANELS, BULDING ^� a 41, ® R1W WIDT VARIES) I�
<br /> PLUMBING VALVES, AND ROOF TOP EQUIPMENT. PLASTIC PHENOLIC EXISTING PAVEMENT ° a °
<br /> t °. a PROPOSED MULTI PRODUCT DISPENSER (MPD) WITH GUARD POST z
<br /> ENGRAVED PLATE SCREWED ON. TO REMAIN ,� ° ° . � '
<br /> + ` (TYPICAL OF 6). SEE TANK PLANS
<br /> 19 LS
<br /> 13• IT IS THE INTENT OF THE ARCHITECT THAT THIS WORK BE IN PROPOSED AIR/WATER UNIT, SEE DETAIL ON SHEET C6.2•
<br /> CONFORMANCE WITH ALL REQUIREMENTS OF THE BUILDING AUTHORITIES
<br /> CANOPY'
<br /> °
<br /> HAVING JURISDICTION OVER THIS TYPE OF CONSTRUCTION AND ----
<br /> OCCUPANCY. ♦\♦C'. o a A £$y
<br /> 50104 0.3E r ! f e.' ® a A ( 1 PROPOSED ARCO MONUMENT SIGN. SEE ARCHITECTURAL PLANS.
<br /> 121.1®'
<br /> 14. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED °. I
<br /> TO BE TYPICAL AND SHALL 8E CONSTRUED TO APPLY TO ANY SIMILAR a a 6 't R=50 9>0,3' L=37 2' PROPOSED TRASH ENCLOSURE. SEE ARCHITECTURALPLANS.
<br /> SITUATION ELSEWHERE IN THE WORK EXCEPT WHERE A DIFFERENT °
<br /> DETAIL IS SHOWN. : ° a MpW-(T4p d =0' 9'.31
<br /> PROPOSED LOT LIGHT. SEE DETAILS BY OTHERS. Q_
<br /> 15. IT IS THE CONTRACTOR's SOLE RESPONSIBILITY TO DETERMINE ERECTION °
<br /> PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE BUILDING \\ 4 TANK .. °°' d' ° ° o. i 24 SW
<br /> AND ITS COMPONENT PARTS DURING ERECTION. SLS : a a ® ° :a .i ! 11 PROPOSED ADA COMPLIANT WHEELCHAIR P> SEE DETAIL ON SHEET C6.0.
<br /> . . ; ° q
<br /> a
<br /> 16. MATERIALS LISTED IN DRAWINGS ARE ED ON DESIGN INTENT. \♦♦ I' 10 LIGHT LS 19 `n ° u : „t. , n
<br /> . J
<br /> .. t 12 PROPOSED ADA PARKING. SEE DETAILS ON SHEET C6.0. I
<br /> ALTERNATE SPECIFICATIONS Y BE ACCEPTED PROVIDED THEY CLOSELY
<br /> `.. ' a, fj� ..�.': � .' SEAL:
<br /> MATCH SPECIFIED MATERIAL. CONTRACTOR IS TO SUBMIT PROPOSED \+ - " �,.., 15
<br /> SAMPLES OF SUBSTITUTIONS, ALONG WITH SAMPLE OF THAT SPECIFIED -' a 6 a OF E S
<br /> y .,.. . ...: . , . ,•. .,.. .::' -� ' • . . 13 PROPOSED ONSITE CONCRETE SIDEWALK. SEE DETAIL ON SHEET C6.1. R S/
<br /> f :.,. s •• "F:<afi. •v.. y. ,,,, _,,w,' : 1 ?' 'n:n?�y,^•k, :zra3,h. ,:r . .,1
<br /> N DRAWINGS OR REVIEW BY THE OWNER. .. . u. .: ...,.�;..:<:.:.. r., .....y...:...
<br /> y,
<br /> <b :
<br /> . •. .. r.: ,�, '.n ., :..:x•,.:.:'hl`..:.v 1.... h v:... : .............. 4i .t4,..,s.. ,:. ah :6,: ..i .M'¢ `y A gQZ
<br /> �. _.:>::. ;:.,:::. : ;,r r k .. :: e.. n .t. o . .. �' :'`. >,.'�::�. ..� :;k k.,:e �.t�Hr�;. r? Q
<br /> 17. GENERAL CONTRACTOR WILL VERIFY WITH OWNER IN REGARD TO ANY ,, ,,,f,ly,� : : ,y :�. < r::fig':,• ,. . �: ,,��'. F � �:�' � ..
<br /> ;. ,«,u, „ :.., „:.h.. ;, PRP IT RIR T
<br /> ..,, •. ,.� ., Fa .r..e. �!%,,,�x�^, , � . ,. : . ,; . , : <•,.<.,; . . a PROPOSED ONSITE E CURB. SEE DETAIL ON SHEET C6.2.
<br /> SPECIFICATIONS NOT INCLUDED WITHIN IN THESE DOCUMENTS. : :«. :. sir t,y. ,;,; q °- ,::::,<v�:,,;u,>,: , ., . ` 4; �,�`: °. a
<br /> ESE DOCU EN S, �; � ,� �� ,� 14 H
<br /> ♦ ;sg,iv . ^ � #g#t ° o.' F: vtir, a•'.,,.r#`" `a �M
<br /> .� /". •yr„:,:' ,k �r e. -Q e - .l,;•:<• 'F`ir::•;y,;e 's' o
<br /> a ::.4`u'•F'lt•,.'•' o 'a.o °.' 4_ lam! ® ^n."•;arT,?:., Sfln:a; .+r:: c#: n ds! P4l
<br /> 15, ALL WORK SHALL BE PERFORMED AS SHOWN N THESE P A I 'I;'. . d s x'
<br /> : 0 ESE LANS AND N .♦, ,. ., ..: • - r r f .. ,� ,, , .��, 6y �.<f � �:� rnw
<br /> a :;.,. a •...e.. 4..., '.!?. w .^ gz "... '': .>r ^ttl' `.a. ••° "1
<br /> ACCORDANCE WITH ARCO SPECIFICATIONS. �� � . ,,� �- a � � 5 PROPOSED ASPHALT CONCRETE PAVEMENT, SEE DETAIL ON SHEET C6.1.
<br /> fb•
<br /> k�a'ms
<br /> .. -
<br /> 1 WHERE ,,;. .. � .4 .. .� , 'I ,,, �.. `• � ,��,: �. t .,xY,. .:,, ,'� �; :,' . ., .
<br /> 9 E E LOCAL CODES, ORDINANCES OR REGULATIONS ARE MORE . . . t •. ';y a
<br /> ♦ PROPOSED TRAFFIC AND LANE MARKING. TAI SHEET
<br /> RESTRICTIVE T ARCO F STORES TH I . . -�„ , G SEE DETAIL ON S EE C6.0• C - �
<br /> FOOD S 0 ES E R LOCAL R ��� .,. „.� / 0-
<br /> REQUIREMENTS
<br /> f•"t"' Y� P ala 3•`. �.o f. & Y �,. ^' :t�/� �• -
<br /> y.
<br /> s
<br /> :
<br /> k Ff
<br /> \ '.G '. c hep
<br /> Fol
<br /> I. . ( ,a F
<br /> R M T H �; � �
<br /> E U E N R
<br /> Q E SSALLGO N• F.
<br /> VE :,:k:..
<br /> } {r { y
<br /> \ n
<br /> :� R �. p
<br /> fk Y.
<br /> Y..
<br /> 'd'f.�.. s S :t .1': '.tr.
<br /> ::.,... 1
<br /> ^ yy> f 9
<br /> ICN _
<br /> t
<br /> S n n r
<br /> ..s
<br /> -% / `r.4" . :+. �. - tea..5:• ,. . :: � ••'. .w .: h's:.s,::y:Oi::. •_
<br /> p,y. ..II .Y. fs. ,.,Yya4tt.., :`:.:::,/:4.: :. pE.y:r..t::....:y."lv.:., y`}, .t.. 17
<br /> C f .;.4 r.� _N L, f. - s ';,nk.. t j :y<:y:; ,. F'. :x F: v:,:y..•,. .d2 tY.`.
<br /> Y • \ . . � �,.�'�. :•.�. , ,, . :�.x ,: ,}. . .: ... f,4.<::::,..:. ;�. PRP AR POST. T
<br /> 20. AN DISCREPANCY BETWEEN FIELD CONDITIONS AND THESE PLANS ARE :� ,j .�� .�.<� t .r..<... >.:.,:.,:,:: PROPOSED GUARD OS . SEE DETAIL ON SHEET C6.1•
<br /> <
<br /> fF
<br /> E
<br /> / .. x„S<s9 .. ,9 .�.. .: / v .:..... :ye. >:•.)•:y'•:is:,,;..:,,:n`.... .:::::d: .,'2.. � -�: : a y.... : # F:.e:a:X' 6-. 1,
<br /> TO 8E IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER
<br /> ♦ , .. i;,. Yr5„7t'; i c:•::. ,�.^,.,.',,':. F .:.Y',`r.`:.' a. :3:��"":: .. .' ,� ', 1'y'. -.: '4£, _ .l'":
<br /> AND/OR ARCHITECT, NO WORK SHALL BE PREFORMED ON THE ITEMS EX. DRIVE Y
<br /> - 15 PROPOSED COMMERCIAL DRIVEWAY PER CITY OF ESCALON STANDARD DETAILS.
<br /> `C ,�aga.xr"a..'iFc,>u-ray! � t£ •.' e o ° `�
<br /> IN QUESTION UNTIL DIRECTED BY THE OWNER AND/OR ARCHITECT.
<br /> 13 SW 25
<br /> \\\ � rKyft�d�i�.b .i n'� r f' yk ,s /^ r � r ,S` ° O. o n AYGMENT
<br /> / d ° ' 19 LANDSCAPE. SEE LANDSCAPE AND IRRIGATION PLANS FOR DETAILS.
<br /> . 2
<br /> N04 7
<br /> Vv
<br /> m 07 E
<br /> A'VV
<br /> � s a 7 / 1 1 P 12 ADA €� , 20 PROPOSED PARKING STRIPING.
<br /> EXISTING SIDEWALK TO `��,. " ° / ° .
<br /> UNIT # y,
<br /> �EMAIN 6 CURB
<br /> o PROPOSED OVERFILL M SEE TANK PLANS FOR DETAILS.
<br /> 2 PROPOSE® C-ST®R W 21 PR
<br /> 2 -
<br /> \ •� ® C) ° ADA i DEVELOPMENT INFORMATIM-
<br /> 5 SIG 22 ADA ACCESSIBLE PATH, 11
<br /> '♦, � ;. 64.66'
<br /> pm
<br /> ACCESSIBLE o \ k ♦\ �W WID l/ARIE 23 PROPOSED TRANSFORMER. SEE TANK PLANS FOR DETAILS. 3000 � �
<br /> WALKWAYS AND SIDEWALKS ALONG ACCESSIBLE ROUTES OF TRAVEL (1)
<br /> FUEL CANOPY
<br /> 19 R=49.21' =1251'
<br /> SHALL BE CONTINUOUSLY ACCESSIBLE, (2) HAVE MAXIMUM 1/2- CHANGES \ 1 [t (3 myMe
<br /> A =14®,34' 6� 24 REPLACE EXISTING SIDEWALK PER CITY OF ESCALON STANDARD DETAILS.
<br /> IN ELEVATION, (3) ARE MINIMUM 45- IN WIDTH, (4) HAVE A MAXIMUM EXISTING B TO ♦vv,' " - S 57
<br /> 1/4'° PER FOOT SIDE SLOPE, AND (5) WHERE NECESSARY TO CHANGE MAIN
<br /> ELEVATION AT A SLOPE EXCEEDING 5% (i.e., 1:20) SHALL HAVE RAMPS 25 REPLACE EXISTING ASPHALT IN-KIND. SITE ADDRESS:
<br /> COMPLYING WITH 2010 CBC, SECTION 11338.5. WHERE A WALK CROSSES '♦
<br /> OR ADJOINS A VEHICULAR WAY, AND THE WALKING SURFACES ARE NOT '
<br /> SEPARATED BY CURBS, RAILINGS OR OTHER ELEMENTS BETWEEN \ ;'.' I 26 REPLACE EXISTING CURB PER CITY OF ESCALON STANDARD DETAILS. EON Anb UE
<br /> PEDESTRIANAREAS AND VEHICULAR AREAS SHALL BE DEFINED BY A \ p (� ❑ ©Pu1AVE
<br /> CONTINUOUS DETECTABLE WARNING WHICH IS 36 WIDE, COMPLYING WITH �, 1`�' ALGA,OA
<br /> 2010 CBC, SECTION 11338.8.5.
<br /> ~- -` FACILITY D
<br /> (k `�� yam.-'" DESGED By CE Z&DU:
<br /> �h � � ROW.1LINE ® Know what's Wow.
<br /> MWD�: Cir
<br /> SP REpmEXISITNG LANDSCAPE _ - SEE ARCHITECTURAL PLANS FOR ALL D� cY
<br /> \TO REMAIN _-___---"" ON-SITE SIGNAGE. ® �� � ��� � � �
<br /> Dial 811 CST
<br /> VERSM; CT W.
<br /> ® 17223
<br /> I DRAtllNO TITLE:
<br /> �7^
<br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL WE PLAN
<br /> I EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE UTILITIES AND
<br /> SHEET N�
<br /> SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE
<br /> CALLING UTILITY LOCATE 511 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF
<br /> PROPOSED UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF
<br /> SAID UTILITIES AS SHOWN ON THESE PLANS ARE ED UPON THE UNVERIFIED PUBLIC INFORMATION AND
<br /> ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL NOTIFY BARGHAUSEN
<br /> CONSULTING ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.