Laserfiche WebLink
1A00 t:VIAIIUN5 <br />& <br />AND <br />I.D. <br />INSIDE DIAMETER <br />L <br />ANGLE <br />INSUL. <br />INSULATION <br />@ <br />AT <br />INT. <br />INTERIOR <br />EO.4 <br />CENTERLINE <br />JT. <br />JOINT <br />0 <br />DIAMETER OF ROUND <br />KIT. <br />KITCHEN <br /># <br />POUND OR NUMBER <br />LAM. <br />LAMINATE <br />(E) <br />EXISTING <br />LAV. <br />LAVATORY <br />(R) <br />RELOCATED <br />LT. <br />LIGHT <br />(N) <br />NEW <br />L.E.D. <br />LIGHT EMITTING DIODE <br />A.F.F. <br />ABOVE FINISH FLOOR <br />MAX. <br />MAXIMUM <br />A.D. <br />AREA DRAIN <br />M.C. <br />MEDICINE CABINET <br />ADJ. <br />ADJUSTABLE <br />MECH. <br />MECHANICAL <br />AGGR. <br />AGGREGATE <br />MEMB. <br />MEMBRANE <br />AL. <br />ALUMINUM <br />MTL. <br />METAL <br />APPROX. <br />APPROXIMATE <br />MFR. <br />MANUFACTURER <br />ARCH. <br />ARCHITECTURAL <br />MIN. <br />MINIMUM <br />ASB. <br />ASBESTOS <br />MIR. <br />MIRROR <br />ASPH. <br />ASPHALT <br />MISC. <br />MISCELLANEOUS <br />BD. <br />BOARD <br />M.O. <br />MASONRY OPENING <br />BITUM. <br />BITUMINOUS <br />MTD. <br />MOUNTED <br />BLDG. <br />BUILDING <br />MUL. <br />MULLION <br />BLKG. <br />BLOCKING <br />N. <br />NORTH <br />BM. <br />BEAM <br />N.I.C. <br />NOT IN CONTRACT <br />BOT. <br />BOTTOM <br />NO. OR <br /># NUMBER <br />CAB. <br />CABINET <br />NOM. <br />NOMINAL <br />CEM.CEMENT <br />A7.4 <br />N.T.S. <br />NOT TO SCALE <br />CER. <br />CERAMIC <br />O.A. <br />OVERALL <br />C.I. <br />CAST IRON <br />OBS. <br />OBSCURE <br />CLG. <br />CEILING <br />O.C. <br />ON CENTER <br />CLKG. <br />CAULKING <br />O.D. <br />OUTSIDE DIAMETER <br />CLO. <br />CLOSET <br />OFF. <br />OFFICE <br />CLR./CL. <br />CLEAR <br />OPNG. <br />OPENING <br />C.O. <br />CASED OPENING <br />OPP. <br />OPPOSITE <br />COL. <br />COLUMN <br />PL. <br />PLATE <br />CONIC. <br />CONCRETE <br />P.LAM. <br />PLASTIC LAMINATE <br />CONN. <br />CONNECTION <br />PLS. <br />PLASTER <br />CONSTR. <br />CONSTRUCTION <br />PLYWD. <br />PLYWOOD <br />CONT. <br />CONTINUOUS <br />PR. <br />PAIR <br />CTSK. <br />COUNTERSUNK <br />PT. <br />POINT <br />CNTR. <br />COUNTER <br />PTN. <br />PARTITION <br />CTR. <br />CENTER <br />Q.T. <br />QUARRY TILE <br />DBL. <br />DOUBLE <br />QSR <br />QUICK SERVE RESTAURANT <br />DEPT. <br />DEPARTMENT <br />R OR RAD. RADIUS <br />DET. <br />DETAIL <br />R.D. <br />ROOF DRAIN <br />DIA. <br />DIAMETER <br />REF. <br />REFERENCE <br />DIM. <br />DIMENSION <br />REFR. <br />REFRIGERATOR <br />DISP. <br />DISPENSER <br />RGTR. <br />REGISTER <br />DN. <br />DOWN <br />REINF. <br />REINFORCED <br />D.O. <br />DOOR OPENING <br />REQ'D <br />REQUIRED <br />DR. <br />DOOR <br />RESIL. <br />RESILIENT <br />DWR. <br />DRAWER <br />RM. <br />ROOM <br />D.S. <br />DOWNSPOUT <br />R.O. <br />ROUGH OPENING <br />DWG. <br />DRAWING <br />R.W.L. <br />RAIN WATER LEADER <br />E. <br />EAST <br />S. <br />SOUTH <br />EA. <br />EACH <br />S.C. <br />SOLID CORE <br />E.J. <br />EXPANSION JOINT <br />SCHED. <br />SCHEDULE <br />EL. <br />ELEVATION <br />S.D. <br />SOAP DISPENSER <br />ELEC.ELECTRICAL <br />SECT. <br />SECTION <br />E.P. <br />ELECTRICAL PANELBOARD <br />SH. <br />SHELF <br />EQ. <br />EQUAL <br />SNR. <br />SHOWER <br />EQPT. <br />EQUIPMENT <br />SHT. <br />SHEET <br />EXISTING <br />SIM. <br />SIMILAR <br />EXP. <br />EXPANSION <br />SPEC. <br />SPECIFICATION <br />EXT. <br />EXTERIOR <br />SQ. <br />SQUARE <br />F.E.FIRE <br />EXTINGUISHER <br />S.S. <br />STAINLESS STEEL <br />F.F. <br />FLOOR FINISH <br />STD. <br />STANDARD <br />FDN. <br />FOUNDATION <br />STL. <br />STEEL <br />FIN. <br />FINISH <br />STOR. <br />STORAGE <br />FL.FLOOR <br />STRL. <br />STRUCTURAL <br />FLASH'G <br />FLASHING <br />SYM• <br />SYMMETRICAL <br />FLUOR. <br />FLUORESCENT <br />T.B.S. <br />TO BE SPECIFIED <br />F.O.C.FACE <br />OF CONCRETE <br />TRD <br />TREAD <br />F.O.F. <br />FACE OF FINISH <br />T.B. <br />TOWEL BAR <br />F.O.S. <br />FACE OF STUD <br />T.C. <br />TOP OF CURB <br />FPRF. <br />FIREPROOF <br />TEL. <br />TELEPHONE <br />F.S.FLOOR <br />SINK <br />TER. <br />TERRAllO <br />FT. <br />FOOT OR FEET <br />T&G <br />TONGUE &GROOVE <br />FTG. <br />FOOTING <br />THK. <br />THICK <br />FURR. <br />FURRING <br />T.P. <br />TOP OF PAVEMENT <br />FUT. <br />FUTURE <br />T.P.D. <br />TOILET PAPER DISPENSER <br />G.A. <br />GAUGE <br />T.V. <br />TELEVISION <br />GALV. <br />GALVANIZED <br />T.W. <br />TOP OF WALL <br />GL. <br />GLASS <br />NP• <br />TYPICAL <br />GR. <br />GRADE <br />UNF. <br />UNFINISHED <br />GSMGALVANIZED <br />SHEET METAL <br />U.N.O. <br />UNLESS NOTED OTHERWISE <br />GYP. <br />GYPSUM <br />VERT. <br />VERTICAL <br />G.W.B. <br />GYPSUM WALL BOARD <br />V.C.T. <br />VINYL COMPOSITE TILE <br />H.B. <br />HOSE BIBS <br />W <br />WEST <br />H.C. <br />HOLLOW CORE <br />W/ <br />WITH <br />HDWD. <br />HARDWOOD <br />W.B. <br />WALL BASE <br />HDWE. <br />HARDWARE <br />W.C. <br />WATER CLOSET <br />H.M. <br />HOLLOW METAL <br />WD. <br />WOOD <br />HORIZ. <br />HORIZONTAL <br />W/o <br />WITHOUT <br />HR.HOUR <br />WP• <br />WATERPROOF <br />HT. <br />HEIGHT <br />WSCT. <br />WAINSCOT <br />WT. <br />WEIGHT <br />SYMBOLS <br />SECTION MARK XX <br />XX.X <br />EXTERIOR ELEVATION TAG XX <br />XX.X <br />X <br />ELEVATION TAG X XX.X X <br />X <br />ELEVATION MARK-JwOCAT 0 <br />FINISH TAG XX -X <br />WINDOW TAG O <br />DOOR TAG Q <br />WALL TAG XX <br />KEYED NOTE XX <br />ARCO <br />TRINITY PARKWAY @ SCOTT CREEK DR <br />STOCKTON, CA <br />GENERAL PROJECT NOTES <br />1. ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE BUILDING CODES AND LOCAL <br />RESTRICTIONS. CONTRACTORS MUST COMPLY WITH CONTRACTOR REGISTRATION <br />REQUIREMENTS OF ALL GOVERNING AUTHORITIES. THE GENERAL BUILDING PERMITS <br />SHALL BE PAID FOR BY THE OWNER UNLESS AGREED OTHERWISE. ALL OTHER <br />PERMITS SHALL BE SECURED AND PAID FOR BY THE SUBCONTRACTOR DIRECTLY <br />RESPONSIBLE. ALL REQUIRED CITY, COUNTY AND/OR STATE LICENSES SHALL BE <br />ACQUIRED AND PAID FOR BY THE INDIVIDUAL SUBCONTRACTOR. <br />2. IT IS THE INTENT OF THE OWNER, THE ARCHITECT AND THEIR CONSULTANTS, THAT <br />ALL WORK DEPICTED IN THESE DRAWINGS AND SPECIFICATIONS IS TO BE PROVIDED <br />BY THE GENERAL CONTRACTOR. ANY REFERENCES TO THE CONTRARY THROUGHOUT <br />THE CONSTRUCTION DOCUMENTS OR SPECIFICATIONS IS NOT INTENDED. ADDITIONALLY, <br />CONTRACTOR IS TO REFER TO THE BID DOCUMENT PACKET AND/OR OWNER'S SCOPE <br />OF WORK DOCUMENT(S) WHICH SHALL TAKE PRECEDENCE OVER SCOPE THAT MAY BE <br />PRESENTED IN THIS SET OF CONSTRUCTION DOCUMENTS OR SPECIFICATIONS. THE <br />SCOPE OF WORK DOCUMENT IS INTENDED TO IDENTIFY ALL OWNER SUPPLIED ITEMS <br />OR WORK PROVIDED BY OTHERS. ABSENCE OF THESE DOCUMENTS MEANS ALL WORK <br />NOTED IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR UNLESS THE OWNER <br />HAS SPECIFIED OTHERWISE DURING THE BID PROCESS. <br />3. APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY <br />WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT SAME INFORMATION AS THE <br />APPROVED PLANS. CONTRACTOR SHALL MAINTAIN ONE COMPLETE SET OF PLANS ON <br />THE PREMISES IN GOOD CONDITION AT ALL TIMES. THIS SHALL INCLUDE ALL ADDENDA <br />AND CHANGE ORDERS. <br />4. DISCREPANCIES BETWEEN PORTIONS OF THE CONTRACT DOCUMENTS, DRAWINGS AND <br />SPECIFICATIONS ARE NOT INTENDED. THE CONTRACTOR IS TO CLARIFY ANY SUCH <br />DISCREPANCIES WITH THE ARCHITECT OR PROJECT MANAGER PRIOR TO COMMENCING <br />WORK. STATED DIMENSIONS TAKE PRECEDENCE OVER GRAPHICS, DO NOT SCALE <br />DRAWINGS TO DETERMINE LOCATIONS. THE ARCHITECT OR PROJECT MANAGER SHALL <br />BE NOTIFIED OF ANY SUCH DISCREPANCIES PRIOR TO CONTINUING WITH WORK. <br />5. IT IS THE INTENT OF THE ARCHITECT THAT THIS WORK BE IN CONFORMANCE WITH <br />ALL REQUIREMENTS OF THE BUILDING AUTHORITIES HAVING JURISDICTION OVER THIS <br />TYPE OF CONSTRUCTION AND OCCUPANCY. THE CONTRACTOR SHALL NOTIFY <br />ARCHITECT IMMEDIATELY OF CONFLICTS WITH GOVERNING CODE REQUIREMENTS BEFORE <br />PROCEEDING FURTHER WITH THE AFFECTED WORK. <br />6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING <br />UTILITIES AND TO PROTECT THEM FROM DAMAGE. CONTRACTOR SHALL BEAR THE <br />EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED <br />BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK. <br />7. THE CONTRACTOR TO PROVIDE FIRE SPRINKLER SYSTEM AND ALARM SYSTEM <br />WHEN <br />REQUIRED BY CODE AND NOTED AS REQUIRED BY THESE PLANS) IN ACCORDANCE <br />WITH NFPA REQUIREMENTS. FIRE SPRINKLER CONTRACTOR IS TO SUBMIT COMPLETE <br />SHOP DRAWINGS, LAYOUT AND RELATED DATA TO BUILDING DEPARTMENT AND FIRE <br />MARSHAL FOR APPROVAL PRIOR TO INSTALLATION. <br />8. FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S APPROVED <br />SHOP DRAWINGS/DATA SHEETS IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. <br />ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL <br />AND SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE IN THE <br />WORK EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN. <br />9. THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL FOOD SERVICE EQUIPMENT AND <br />COORDINATE LOCATION OF ALL UTILITIES INCLUDING FLOOR SINKS, FLOOR DRAINS, <br />SLOPES/SLAB DEPRESSIONS AND RAISED CURBS, ELECTRICAL AND PLUMBING AND <br />STUBOUTS FOR FUTURE EQUIPMENT WHERE NOTED. <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE <br />SITE <br />WHILE JOB IS IN PROGRESS AND UNTIL BUILDING IS OCCUPIED. <br />11. ALL DEBRIS SHALL BE REMOVED FROM PREMISES REGULARLY AND ALL AREAS SHALL <br />BE LEFT IN A CLEAN (BROOM) CONDITION AT ALL TIMES. <br />12. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF <br />THE OCCUPANTS AND WORKERS AT ALL TIMES. <br />13. CONTRACTOR SHALL PROVIDE TEMPORARY WATER, POWER, TELEPHONE, FACSIMILE OR <br />METHOD TO RECEIVE E-MAIL, PRINTER AND TOILET FACILITIES AS REQUIRED. <br />14. GENERAL CONTRACTOR IS RESPONSIBLE FOR RECEIVING, UNLOADING, UN -CRATING, <br />INSTALLATION AND HOOKUP OF ALL FOOD SERVICE EQUIPMENT AND OTHER'OWNER <br />OR VENDOR FURNISHED ITEMS. <br />15. GENERAL CONTRACTOR IS REQUIRED TO LABEL ALL ELECTRICAL PANELS, PLUMBING <br />VALVES, AND ROOF TOP EQUIPMENT WITH PLASTIC PHENOLIC ENGRAVED PLATES <br />ATTACHED TO IDENTIFY THE EQUIPMENT USE OR PURPOSE. <br />16. CONTRACTOR SHALL SUPPLY, LOCATE AND BUILD INTO THE WORK ALL INSERTS, <br />ANCHORS, ANGLES, PLATES, OPENINGS, SLEEVES, HANGERS, SLAB DEPRESSIONS AND <br />PITCHES AS MAY BE REQUIRED TO ATTACH AND ACCOMMODATE OTHER WORK. <br />SPECIAL INSPECTION REQUIREMENTS MAY APPLY TO ALL STRUCTURAL EMBEDMENTS <br />OR POST INSTALLED ANCHORS. CONTRACTOR SHALL CONFIRM REQUIREMENTS PRIOR <br />TO INSTALLATION. <br />17. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE MEANS AND METHODS <br />FOR ERECTION PROCEDURE AND SEQUENCE OF THE CONSTRUCTION. CONTRACTOR TO <br />INSURE THE SAFETY OF ALL INSTALLED IMPROVEMENTS, BUILDINGS AND THEIR <br />COMPONENT PARTS DURING ERECTION. <br />18. MATERIALS LISTED IN DRAWINGS ARE BASED ON DESIGN INTENT. ALTERNATE <br />SPECIFICATIONS MAY BE ACCEPTED PROVIDED THEY CLOSELY MATCH AND ARE <br />DEEMED EQUAL TO SPECIFIED MATERIAL. GENERAL CONTRACTOR IS TO SUBMIT <br />PROPOSED SAMPLES OF SUBSTITUTIONS, ALONG WITH SAMPLE OF THAT SPECIFIED IN <br />DRAWINGS FOR REVIEW BY THE ARCHITECT OR PROJECT MANAGER. SUBSTITUTIONS <br />WILL ONLY BE APPROVED IF SPECIFIED MATERIAL IS PROVEN TO BE UNAVAILABLE <br />WITHIN A REASONABLE TIME FRAME OR THE SUBSTITUTION IS A BENEFIT TO THE <br />OWNER RELATED TO COST OR SCHEDULE TIME SAVINGS. <br />19. THE PROJECT BOUNDARIES SHALL BE CONFIRMED BY THE CONTRACTOR PRIOR TO <br />CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE OWNERS ATTENTION <br />IMMEDIATELY BEFORE PROCEEDING WITH CONSTRUCTION. <br />20. ALL LABOR, MATERIALS AND INSTALLATIONS MUST COMPLY WITH THE CODES AND <br />REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION. ANY DISCREPANCY WHICH <br />EXISTS BETWEEN THE REQUIREMENTS BY THE PLANS, SPECIFICATIONS, SAID CODES, <br />RULES AND REGULATIONS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF <br />THE ARCHITECT, IN WRITING FOR RESOLUTION. IF ANY CHANGE IN THE PLANS AND/ <br />OR SPECIFICATIONS OCCURS AS A RESULT OF THE REQUIREMENTS OF THE LIFE <br />SAFETY CODE (NFPA 101) OR ANY OTHER AUTHORITIES HAVING JURISDICTION AFTER <br />ADJUST THEIR BIDS, IF NECESSARY, ONLY FOR THE CHANGE. THE SUBMISSION OF BIDS, THEN THE BIDDERS WILL BE GIVEN THE OPPORTUNITY TO <br />21. THE CONTRACTOR SHALL COORDINATE THE WORK WITH MECHANICAL, ELECTRICAL AND <br />PLUMBING DRAWINGS FOR ALL NECESSARY OPENINGS AND PENETRATIONS THROUGH <br />WALLS, CEILING AND FLOORS. <br />22. ALL EXPOSED PIPES, CONDUITS OR DUCTS IN FINISHES AREAS, WHETHER SHOWN ON <br />DRAWINGS OR NOT, SHALL BE FURRED OUT WITH GYPSUM BOARD. <br />23. LOCATION OF ACCESS DOORS SUPPLIED BY MECHANICAL TRADES AND INSTALLED BY <br />OTHERS SHALL BE DETERMINED IN THE FIELD THROUGH COORDINATION OF TRADES, <br />WHICH ACCESS DOORS ARE REQUIRED. ACCESS DOORS SHALL NOT BE PLACED IN <br />LOCATION OF LIGHT FIXTURES SHALL GOVERN POSITION OF DUCTS AND PIPES FOR <br />INACCESSIBLE POSITIONS OR IN THE WAY OF LIGHTS, GRILLS, REGISTERS, CONCEALED <br />BY CASEWORK, ECT. <br />24. ALL DEFERRED SUBMITTALS SHALL BE REVIEWED BY THE DESIGN PROFESSIONAL IN <br />CHARGE AND FORWARD THEM TO THE BUILDING DEPT. INDICATING THAT THE <br />DEFERRED ITEMS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL <br />CONFORMANCE TO THE DESIGN OF THE BUILDING. <br />LEGAL DESCRIPTION/ DATA <br />PARCEL 1 OF THE TENTATIVE PARCEL MAP FOR ARCO TRINITY PARKWAY <br />BEING RESULTANT PARCEL 2 AS SHOWN ON THAT CERTAIN CERTIFICATE OF LOT LINE <br />ADJUSTMENT LLA 15-02 AND SHOWN ON THE GRANT DEED RECORDED AS DOCUMENT <br />NO. 2015-150966, SAN JAGQUIN COUNTY RECORDS AND LYING IN A PORION OF <br />SECTION 1, TOWNSHIP 2 NORTH, RANGE 5 FAST, MOUNT DIABLO MERIDIAN, CITY OF <br />STOCKTON, SAN JOAQUIN COUNTY, CALIFORNIA, JUNE 2016. <br />PROJECT DESCRIPTION: PROPOSED ARCO am/pm GAS STATION, <br />C -STORE AND CAR WASH <br />ASSESSORS PARCEL 066-020-02 <br />NUMBER: <br />SITE AREA: 53,659 SF <br />1.23 AC <br />FLOODZONE: ZONE "X", PER COMMUNITY PANEL NO. <br />06077CO295F, DATED OCTOBER 16, 2009. <br />ZONING• <br />MX- MIXED USE <br />CITY APPROVAL <br />CITY OF STOCKTON <br />RESOLUTION NO. 2016-05-26-0301 <br />PROJECT DATA <br />PROJECT ADDRESS: 10849 TRINITY PARKWAY <br />STOCKTON, CA <br />BUILDINGS • am/pm STORE <br />CONSTRUCTION TYPE: V -B <br />USE GROUP: M (CONVENIENCE STORE) <br />ALLOWABLE AREA: 9,000 S.F. <br />ACTUAL GROSS AREA: 3,054 S.F. <br />BUILDING FOOTPRINT: 3,174 S.F. <br />AC NOPY <br />CONSTRUCTION TYPE: II -B <br />USE GROUP: M (FUEL CANOPY) <br />ALLOWABLE AREA: 12,500 S.F. <br />ACTUAL GROSS AREA: 5,989.5 S.F. <br />BUILDINGS : CARWASH <br />CONSTRUCTION TYPE: V -B <br />USE GROUP: B (BUSINESS) <br />ALLOWABLE AREA:, 9,000 S.F. <br />ACTUAL GROSS AREA: 1,382 S.F. <br />OCCUPANCY AND EGR <br />CONVENIENCE _STORE <br />SALES - 1,701 S.F.(1701/30) = 57 <br />CASHIER - 131 S.F.(131/100) = 2 <br />OFFICE - 68 S.F. (68/100) = 1 <br />RESTROOMS - 114 S.F. (EXEMPT) = Q <br />PREP/UTILITY - 405 S.F.(405/200) = 3 <br />COOLER/FREEZER - 533 S.F. (*EXEMPT) = 0 <br />TOTAL (NET): 2,952 S.F. = 63 OCCUPANTS <br />TOTAL (GROSS): 3,054 S.F. <br />*COOLER IS A NON OCCUPIABLE SPACE PER SECTION 202 <br />DEFINITION OF AN OCCUPIABLE SPACE. <br />EXITS REQUIRED: 2 <br />EXITS PROVIDED: 2 <br />PLUMBING FIXTURE COUNT: <br />CONVENIENCE TORE: <br />PER CPC 422.1 LOAD FACTOR TABLE 'A' <br />M -MERCANTILE OCC LOAD FACTOR = 1/200 <br />3054 SF/ 200 = 16 OCC LOAD <br />PER CPC 422.2 EXCEPTION 3- <br />-OCC LOAD LESS THAN 50 ALLOWS 1 UNISEX <br />PROVIDED <br />MEN FIXTURES PROVIDED = 1 WATER CLOSET, 1 LAV <br />WOMEN FIXTURES PROVIDED = 1 WATER CLOSET, 1 LAV <br />SPECIAL INSPECTIONS <br />-SPECIAL INSPECTIONS: SEE STRUCTURAL SHEET S3.4 FOR REQUIREMENTS <br />SEPARATE AT <br />E <br />SUBMITTALS <br />T <br />A <br />L <br />S <br />-SIGNAGE PERMITS <br />DEFFERRED SUBMITTALS <br />-TRUSS SHOP DRAWINGS <br />APPLICABLE CODES <br />BUILDING CODE : <br />2013 CALIFORNIA BUILDING CODE <br />GC -1 <br />(BASED ON 2012 IBC) <br />GC -2 <br />2013 CALGREEN CODE <br />MO.3 <br />(BASED ON 2012 CALIF GREEN <br />MOA <br />BUILDING STANDARDS CODE) <br />PLUMBING CODE: <br />2013 CALIFORNIA PLUMBING CODE <br />EO.4 <br />(BASED ON 2012 UPC) <br />ELECTRICAL CODE: <br />2013 CALIFORNIA ELECTRICAL CODE <br />EO.6 <br />(BASED ON 2011 NEC) <br />MECHANICAL CODE: <br />2013 CALIFORNIA MECHANICAL CODE <br />EO.8 <br />(BASED ON 2012 UMC) <br />ENERGY CODE: <br />2010 ENERGY STANDARDS <br />AS AMENDED <br />BY STATE OF CALIF, AND LOCAL JURISDICTION <br />SITE VICINITY MAP <br />PROJECT DIRECTORY <br />APPLICANT/ OWNER <br />KEN DHARNI <br />6698 MACK ROAD <br />SACRAMENTO, CA 95821 <br />ARCHITECTCIVIL, PETROLEUM. LANDSCAP <br />BARGHAUSEN CONSULTING ENGINEERS <br />915 HIGHLAND POINT DRIVE <br />ROSEVILLE, CA 95209 <br />PROJECT CONTACT. PETE TOBIN <br />(425) 656-7416 <br />STRUCTURAL ENGINEER <br />PCS STRUCTURAL SOLUTIONS <br />811 FIRST AVENUE, SUITE 620 <br />SEATTLE, WA <br />PROJECT CONTACT: JACK PINKARD <br />PHONE: (206) 292-5076 <br />PLUMBING MECHANICAL ELECTRICAL ENGINEER <br />SACRAMENTO ENGINEERING CONSULTANTS <br />10555 OLD PLACERVILLE RD <br />SACRAMENTO, CA 95827 <br />(916) 368-4468 <br />UR EYO <br />NORTHSTAR ENGINEERING GROUP, INC. <br />620 12TH STREET <br />MODESTO, CA 95354 <br />PHONE: (209) 524-3525 <br />SOILS ENGINEER <br />KLEINFELDER <br />2001 ARCH AIRPORT RD SUITE 100 <br />STOCKTON, CA 95206 <br />(209) 948-1395 <br />DEVELOPMENT CONTACTS <br />BUILDING: <br />CITY OF STOCKTON COMMUNITY DEPT <br />BUILDING AND LIFE SAFETY <br />425 N. ELDORADO STREET <br />STOCKTON, CA 95202 <br />(209) 937-8561 <br />PLANNING, <br />CITY OF STOCKTON COMMUNITY DEPT <br />PLANNING <br />425 N. ELDORADO STREET <br />STOCKTON, CA 95202 <br />(209) 937-8266 <br />ENGINEERING: <br />CITY OF STOCKTON COMMUNITY DEPT <br />ENGINEERING DIVISION <br />425 N. EL DORADO STREET <br />STOCKTON, CA 95202 SAN JOAQUIN COUNTY <br />(209) 937-8266 ENVIRONMENTAL HEALTH DEPARTMEI <br />FIS 1868 E. HAZELTON AVE. <br />FIRE PREVENTION STOCKTON, CA 95205 <br />345 N. ELDORADO STREET;- (209)463 3420 <br />STOCKTON, CA 95202 0 Approv6d <br />(209) 937-8271 pproved with changeq See Remarks <br />L7.Dfsapproved See �P,{�.�{irks <br />��1p� <br />Remarks <br />WATER/ SEWER/ <br />ST RM: <br />CITY OF STOCKTON - - <br />MUNICIPAL UTILITIES --- <br />425 N. ELDORADO STREETDate fly <br />STOCKTON, CA A royal <br />sszo2 xte <br />PP ds only that whwfi is own and de <br />(209) 937-8436 hereon and does not authorize or aMID <br />rove any omi <br />deviation from requirements of state laws or local ordin <br />HEALTH/ FOOD - <br />SAN JOAQUIN ENVIRONMENTAL HEALTH DEPT <br />FOOD FACILITY PLAN REVIEW <br />1868 EAST HAZELTON AVE <br />STOCKTON, CA 95205 <br />(209) 468-3420 <br />CUPA: <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPT <br />1868 EAST HAZELTON AVE <br />STOCKTON, CA 95205 <br />(209) 468-3420 <br />AE <br />SAN JOAQUIN VALLEY <br />AIR POLLUTION CONTROL DISTRICT NORTHERN REGION OFFICE <br />4800 ENTERPRISE WAY <br />MODESTO, CA 95356 <br />(209) 557-6400 <br />ELECTRIC/ GAS: <br />PACIFIC GAS & ELECTRIC <br />PERMIT ISSUE DATES <br />INDEX OF DRAWINGS <br />** FOOD FACILITIES SUBMITTAL- SHEETS <br />GENERAL <br />T1.1 ** COVER SHEET <br />GC -1 <br />GREEN BUILDING CHECKLIST <br />GC -2 <br />GREEN BUILDING CHECKLIST <br />MO.3 <br />MECHANICAL T-24 FORMS <br />MOA <br />MECHANICAL T-24 FORMS <br />MO.5 <br />MECHANICAL T-24 FORMS <br />EO.4 <br />TITLE 24 FORMS -INDOOR LIGHTING PART 1 <br />EO.5 <br />TITLE 24 FORMS -INDOOR LIGHTING PART 2 <br />EO.6 <br />TITLE 24 FORMS -OUTDOOR LIGHTING <br />E0.7 <br />TITLE 24 FORMS -INDOOR LIGHTING CARWASH PART 1 <br />EO.8 <br />TITLE 24 FORMS -INDOOR LIGHTING CARWASH PART 2 <br />SURVEY <br />S-1 <br />BOUNDARY & TOPO SURVEY MAP <br />SITE LIGHTING PLAN <br />1 of 1 <br />PHOTOMETRIC SITE PLAN <br />CIVIL <br />ROOF PLAN <br />C1.0 <br />COVER SHEET <br />C2.0 <br />SITE PLAN <br />C3.0 <br />DEMOLITION AND EROSION CONTROL PLAN <br />C3.1 <br />EROSION CONTROL NOTES AND DETAILS <br />C4.0 <br />GRADING AND STORM DRAINAGE PLAN <br />C5.0 <br />UTILITY PLAN <br />C6.0 <br />NOTES AND DETAILS <br />C6.1 <br />NOTES AND DETAILS <br />C6.2 <br />NOTES AND DETAILS <br />C6.3 <br />RECLAIM SYSTEM DETAILS <br />C7.0 <br />ARCO SITE SPECIFICATIONS <br />C7.1 <br />ARCO SITE SPECIFICATIONS <br />C7.2 <br />ARCO SITE SPECIFICATIONS <br />LANDSCAPE <br />L1 <br />LANDSCAPE - PLANTING PLAN <br />L2 <br />LANDSCAPE - PLANTING NOTES AND DETAILS <br />L3 <br />LANDSCAPE - IRRIGATION PLAN <br />L4 <br />LANDSCAPE - IRRIGATION NOTES AND DETAILS <br />ARCHITECTURAL <br />A1.1 ** <br />CONSTRUCTION FLOOR PLAN <br />A1.2 ** <br />REFLECTED CEILING PLAN <br />A1.3 <br />ROOF PLAN <br />A2.1 <br />EXTERIOR ELEVATIONS <br />A2.3 ** <br />INTERIOR ELEVATIONS <br />A2.4 ** <br />INTERIOR ELEVATIONS <br />A2.5 ** <br />INTERIOR ELEVATIONS <br />A2.6 ** <br />INTERIOR ELEVATIONS AND ENLARGED RESTROOM PLAN <br />A3.1 <br />BUILDING SECTIONS <br />A3.2 <br />WALL SECTIONS <br />A3.3 <br />WALL SECTIONS <br />A4.1 <br />DETAILS <br />A4.2 <br />DETAILS <br />A5.1 <br />DOOR AND WINDOW SCHEDULE <br />A7.1 <br />ARCHITECTURAL SPECIFICATIONS <br />A7.2 <br />ARCHITECTURAL SPECIFICATIONS <br />A7.3 <br />ARCHITECTURAL SPECIFICATIONS <br />A7.4 <br />ARCHITECTURAL SPECIFICATIONS <br />A7.5 <br />ARCHITECTURAL SPECIFICATIONS <br />A7.6 <br />ARCHITECTURAL SPECIFICATIONS <br />Q1.1 ** <br />EQUIPMENT PLAN <br />Q1.2 ** <br />COOLER PACKAGE <br />Q2.1 ** <br />EQUIPMENT SCHEDULE <br />Q2.2 <br />NOT USED <br />Q2.3 <br />SMALL WARES SCHEDULE <br />SNA -1 <br />SIGN PLAN- SEPARATE PERMIT SUBMITTAL <br />TE -1 <br />TRASH / RECYCLE ENCLOSURE PLANS <br />CARWASH- <br />ARCHITECTURAL <br />CWA1.1 <br />CARWASH FLOOR PLAN <br />CWA1.2 <br />CARWASH REFLECTED CLG/ ROOF PLAN <br />CWA2.1 <br />CARWASH EXTERIOR ELEVATIONS <br />CWA3.1 <br />CARWASH BLDG SECTION/ WALL SECTIONS/ DETAILS <br />CARWASH- <br />EQUIPMENT <br />CWQ1.1 <br />CARWASH EQUIPMENT <br />CWQ1.2 <br />CARWASH EQUIPMENT <br />CWQ1.3 <br />CARWASH EQUIPMENT <br />C WQ1.4 <br />CARWASH EQUIPMENT <br />CWQ1.5 <br />CARWASH EQUIPMENT <br />STRUCTURAL <br />S1.1 <br />FOUNDATION PLAN <br />S1.2 <br />CEILING FRAMING PLAN <br />S1.3 <br />ROOF FRAMING PLAN <br />CSW1.1 <br />CARWASH FOUNDATION PLAN <br />CSW1.2 <br />CARWASH ROOF FRAMING PLAN <br />S2.1 <br />DETAILS <br />S2.2 <br />DETAILS <br />S2.3 <br />DETAILS <br />S2.4 <br />DETAILS <br />S2.5 <br />DETAILS <br />S2.6 <br />DETAILS <br />-S2.7 <br />DETAILS <br />52.8 <br />DETAILS <br />S2.9 <br />DETAILS <br />'S2.10 <br />DETAILS <br />IS3.1 <br />GENERAL NOTES <br />S3.2 <br />GENERAL NOTES <br />S3.3 <br />GENERAL NOTES <br />S3.4 <br />GENERAL NOTES <br />CANOPY- ARCHITECTURAL <br />CA -1 CANOPY FLOOR PLAN <br />CA -2 CANOPY EXTERIOR ELEVATIONS <br />CA -3 CANOPY REFLECTED CEILING PLAN <br />CANOPY- STRUCTURAL <br />CS1 <br />CANOPY COVER SHEET <br />E1 <br />FRAMING PLAN <br />E2 <br />ELEVATIONS <br />E3 <br />LIGHTING & SOFFIT PLAN <br />E4 <br />SECTION <br />E5 <br />SECTION <br />F1 <br />FOUNDATION PLAN <br />PLUMBING <br />PO.1 <br />** <br />PLUMBING <br />LEGEND, SCHEDULES & CALCULATIONS <br />PO.2 <br />** <br />PLUMBING <br />GENERAL NOTES & SPECIFICATIONS <br />P1.1 <br />** <br />PLUMBING <br />ROUGH -IN PLAN <br />P2.1 <br />** <br />SANITARY DRAINAGE & VENT PLUMBING PLAN AND <br />ISOMETRIC <br />DIAGRAM <br />P3.1 <br />** <br />DOMESTIC <br />WATER SUPPLY PLUMBING PLAN AND <br />ISOMETRIC <br />DIAGRAM <br />P4.1 <br />PLUMBING <br />ROOF PLAN <br />P5.1 <br />** <br />GAS PIPING PLUMBING PLANS AND ISOMETRIC DIAGRAM <br />P6.1 <br />** <br />PLUMBING <br />DETAILS - I <br />P6.2 <br />** <br />PLUMBING <br />DETAILS - II <br />INDEX OF DRAWINGS -CONT <br />MECHANICAL <br />Mo.1 ** EQUIPMENT SCHEDULE, LEGEND AND NOTES <br />MO.2 ** MECHANICAL SPECIFICATIONS <br />M2.1 ** MECHANICAL FLOOR PLAN <br />M2.2 MECHANICAL ROOF PLAN <br />M6.1 ** MECHANICAL DETAILS <br />M6.2 ** HOOD & FAN SHOP DRAWINGS <br />M9.1 ** CONTROLS <br />ELECTRICAL <br />ES1.1 SITE PLAN <br />EO.1 LEGEND, NOTES & SCHEDULES <br />EO.2 SPECIFICATIONS <br />EO.3.1 SINGLE LINE DIAGRAM & EQUIPMENT SCHEDULE <br />EO.3.2 ELECTRICAL PANEL SCHEDULES <br />111.0 LIGHTING PLAN <br />E2.0 POWER PLAN <br />E2.1 ELECTRICAL ROUGH -IN PLAN <br />E3.0 ELECTRICAL ROOF PLAN <br />E4.0 COMMUNICATIONS PLAN <br />E5.0 DIAGRAMS & DETAILS PART 1 <br />E5.1 DIAGRAMS & DETAILS PART 2 <br />E6.1 CANOPY POWER PLAN, DETAILS <br />E6.2 CANOPY LIGHTING PLAN, DETAILS <br />CARWASH ELECTRICAL/ PLUMBMING <br />CW1.1 CARWASH ELECTRICAL <br />CWP 1.1 CARWASH PLANS, LEGEND, NOTES & SCHEDULES <br />CWP1.2 CARWASH DETAILS <br />PETROLEUM PLANS <br />G.0.0 TITLE SHEET AND DRAWING INDEX <br />G.0.2.0 UNDERGROUND TANK AND PIPING SITE PLAN AND INSTALLATION NOTES <br />G.0.2.1 TANK & PIPING SCOPE OF WORK & GENERAL NOTES (FRP 1 OF 2) <br />G.0.2.2 TANK & PIPING SCOPE OF WORK & GENERAL NOTES (FRP 2 OF 2) <br />G.0.5 DESIGN INTENT MISCELLANEOUS DETAILS <br />G.0.6.2 DESIGN INTENT: NEW VENT STACK INSTALLATION DETAILS W/ <br />VEEDER-ROOT CARBON CANISTER VAPOR POLISHER (CALIFORNIA <br />ONLY) <br />G.0.7.2 TANK FILL & VAPOR RISER STATIC GROUNDING DETAILS (CALIFORNIA <br />ONLY) <br />M.5.3.01 TANK AND PIPING MATERIALS LIST (1 OF 2) <br />M.5.3.02 TANK AND PIPING MATERIALS LIST (2 OF 2) <br />M.5.3.03 TYPICAL 25,000 GALLON DOUBLE WALL FIBERGLASS TANK <br />INSTALLATION DETAILS <br />M.5.3.04 TYPICAL 12,000/8,000 GALLON DOUBLE WALL FIBERGLASS TANK <br />INSTALLATION DETAILS <br />M.5.3.08 UST INSTALLATION (1) 10'0 25K & (1) 10'0 12K/8K BLENDING, <br />DOUBLE WALL VENT & VAPOR <br />M.5.3,10 ANCHORING DETAIL <br />M.5.3.12 TURBINE SIDE SUMPS AND PIPING INSTALLATION DETAILS <br />M.5.3.16 FILL SIDE SUMP INSTALLATION DETAILS (DOUBLE WALL VENT/VAPOR) <br />M.5.3.18 DIESEL FILL SIDE SUMP INSTALLATION DETAILS OPW <br />(DOUBLE WALL VENT) <br />M.5.3.22 DISPENSER DETAILS: WAYNE OVATION (3+0) BLEND DISPENSER <br />INSTALLATION DETAILS (D.W. VAPOR) <br />M.5.3.23 DISPENSER DETAILS: WAYNE OVATION (3+1) BLEND DISPENSER <br />INSTALLATION DETAILS (D.W. VAPOR) <br />M.5.3.27 TANK SLAB CONCRETE SPECIFICATIONS & IDENTIFICATION <br />MARKING DETAILS <br />M.5.3.28 ELECTRICAL FUELING SITE PLAN <br />M.5.3.29 ELECTRICAL FUELING POINT-TO-POINT CONDUIT PLAN <br />M.5.3.30 IST -IFC, CAT 5, AND VEEDER-ROOT NOTES <br />M.5.3.31 ELECTRICAL FUELING DETAILS FOR VEEDER-ROOT & POWER <br />DISTRIBUTION CENTER (20K & 12K/10K TANKS) <br />M.5.3.32 ELECTRICAL PANEL POWER AND CONTROL WIRING DETAILS <br />M.5.3.33 ELECTRICAL PANEL E -STOP CONTROL WIRING SCHEMATIC <br />M.5.3.34 EMERGENCY SHUTDOWN SCHEMATIC FUELING CONTROL W/VFC's <br />GREEN BUILDING NOTES <br />1. EXCAVATED SOIL AND LAND CLEARING DEBRIS - 100 PERCENT OF TREES, <br />STUMPS, ROCKS, AND ASSOCIATED VEGETATION AND SOIL RESULTING <br />PRIMARILY FROM LAND CLEARING SHALL BE REUSED OR RECYCLED PER <br />CGBC 5.408.3. <br />2. THE OWNER SHALL PROVIDE A READILY ACCESSIBLE AREAS THAT SERVE <br />THE ENTIRE BUILDING AND ARE AND ARE IDENTIFIED FOR THE DEPOSITING, <br />STORAGE AND COLLECTION OF NON -HAZARDOUS MATERIALS FOR <br />RECYCLING, INCLUDING (AT A MINIMUM) PAPER CORRUGATED D CARDBOARD, <br />GLASS, PLASTICS AND METALS OR MEETS A LAWFULLY <br />RECYCLING ORDINANCE, IF MORE RESTRICTIVE. ENACTED LOCAL <br />3. THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING <br />CONSTRUCTION IF NECESSARY TO CONDITION THE BUILDING WITHIN THE <br />REQUIRED TEMPERATURE RANGE FOR MATERIAL AND EQUIPMENT <br />INSTALLATION. IF THE HVAC SYSTEM IS USED DURING CONSTRUCTION, USE <br />RETURN AIR FILTERS WITH A MINIMUM EFFICIENCY REPORTING VALUE <br />(MERV) OF 8, BASED ON ASHRAE 52.2-1999, OR AN AVERAGE EFFICIENCY <br />OF 30 PERCENT BASED ON ASHRAE 52.1-1992. REPLACE ALL FILTERS <br />IMMEDIATELY PRIOR TO OCCUPANCY PER CGBC 5.504.1.3 <br />4. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE <br />CONSTRUCTION SITE UNTIL FINAL STARTUP OF THE HEATING, COOLING AND <br />VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR DISTRIBUTION <br />COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET <br />METAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO <br />REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS WHICH MAY ENTER <br />THE SYSTEM PER CGBC 5.504.3 <br />5. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED <br />AREAS OF THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND <br />RETURN AIR THAT PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING <br />VALUE (MERV) OF 8. MERV 8 FILTERS SHALL BE INSTALLED PRIOR TO <br />OCCUPANCY, AND RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF <br />THE SAME VALUE SHALL BE INCLUDED IN THE OPERATION AND <br />MAINTENANCE MANUAL. <br />6. INSTALL HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT THAT <br />DO NOT CONTAIN CFC'S. AND HALONS PER CGBC 5.508.1 <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />T7HG If <br />ENG <br />18215 72ND AVENUE SOUTH <br />KENT, WA 98032 <br />(425)251-6222 <br />(425)251-8782 FAX <br />CML ENGINEERING, LAND PLANNING, <br />SURVEYING, ENVIRONMENTAL SERVICES <br />NO. I DATE I REVISION DESCRIPTION <br />05/16/16 BP APPROYI]) EQUIPMENT PLAN <br />07/13/16 PERMIT SUBMITTAL <br />SEAL• <br />Al� OF CAS 7F0 <br />& DANIEL BRIAN <br />r7 GOALWIN Y <br />C-18865 <br />n REN. 8/31/17 �U <br />��SeO <br />ARCa\/ <br />ARCO NTI <br />MODIFIED <br />3000 am <br />m <br />P <br />w/ 26'x65' CAR WASH <br />FUEL CANOPY w/ 8 MPD's <br />ADDRESS: <br />TRINITY PARKWAY <br />@ SCOTT CREEK DRIVE <br />STOCKTON,CA <br />FACILITY # TBD <br />DE9GNE0 BY: <br />AWANCE ZdfDAk <br />CHECKED BY: <br />BP REPM: <br />DRAWN BY: <br />ALLIANCE PM: <br />MR90N: <br />_ <br />PROJECT N0: <br />_ <br />16700 <br />COVER SHEET <br />T1.1 <br />i <br />i� <br />X <br />z <br />0 <br />W <br />n <br />0 <br />U <br />n <br />i <br />Z <br />