1A00 t:VIAIIUN5
<br />&
<br />AND
<br />I.D.
<br />INSIDE DIAMETER
<br />L
<br />ANGLE
<br />INSUL.
<br />INSULATION
<br />@
<br />AT
<br />INT.
<br />INTERIOR
<br />EO.4
<br />CENTERLINE
<br />JT.
<br />JOINT
<br />0
<br />DIAMETER OF ROUND
<br />KIT.
<br />KITCHEN
<br />#
<br />POUND OR NUMBER
<br />LAM.
<br />LAMINATE
<br />(E)
<br />EXISTING
<br />LAV.
<br />LAVATORY
<br />(R)
<br />RELOCATED
<br />LT.
<br />LIGHT
<br />(N)
<br />NEW
<br />L.E.D.
<br />LIGHT EMITTING DIODE
<br />A.F.F.
<br />ABOVE FINISH FLOOR
<br />MAX.
<br />MAXIMUM
<br />A.D.
<br />AREA DRAIN
<br />M.C.
<br />MEDICINE CABINET
<br />ADJ.
<br />ADJUSTABLE
<br />MECH.
<br />MECHANICAL
<br />AGGR.
<br />AGGREGATE
<br />MEMB.
<br />MEMBRANE
<br />AL.
<br />ALUMINUM
<br />MTL.
<br />METAL
<br />APPROX.
<br />APPROXIMATE
<br />MFR.
<br />MANUFACTURER
<br />ARCH.
<br />ARCHITECTURAL
<br />MIN.
<br />MINIMUM
<br />ASB.
<br />ASBESTOS
<br />MIR.
<br />MIRROR
<br />ASPH.
<br />ASPHALT
<br />MISC.
<br />MISCELLANEOUS
<br />BD.
<br />BOARD
<br />M.O.
<br />MASONRY OPENING
<br />BITUM.
<br />BITUMINOUS
<br />MTD.
<br />MOUNTED
<br />BLDG.
<br />BUILDING
<br />MUL.
<br />MULLION
<br />BLKG.
<br />BLOCKING
<br />N.
<br />NORTH
<br />BM.
<br />BEAM
<br />N.I.C.
<br />NOT IN CONTRACT
<br />BOT.
<br />BOTTOM
<br />NO. OR
<br /># NUMBER
<br />CAB.
<br />CABINET
<br />NOM.
<br />NOMINAL
<br />CEM.CEMENT
<br />A7.4
<br />N.T.S.
<br />NOT TO SCALE
<br />CER.
<br />CERAMIC
<br />O.A.
<br />OVERALL
<br />C.I.
<br />CAST IRON
<br />OBS.
<br />OBSCURE
<br />CLG.
<br />CEILING
<br />O.C.
<br />ON CENTER
<br />CLKG.
<br />CAULKING
<br />O.D.
<br />OUTSIDE DIAMETER
<br />CLO.
<br />CLOSET
<br />OFF.
<br />OFFICE
<br />CLR./CL.
<br />CLEAR
<br />OPNG.
<br />OPENING
<br />C.O.
<br />CASED OPENING
<br />OPP.
<br />OPPOSITE
<br />COL.
<br />COLUMN
<br />PL.
<br />PLATE
<br />CONIC.
<br />CONCRETE
<br />P.LAM.
<br />PLASTIC LAMINATE
<br />CONN.
<br />CONNECTION
<br />PLS.
<br />PLASTER
<br />CONSTR.
<br />CONSTRUCTION
<br />PLYWD.
<br />PLYWOOD
<br />CONT.
<br />CONTINUOUS
<br />PR.
<br />PAIR
<br />CTSK.
<br />COUNTERSUNK
<br />PT.
<br />POINT
<br />CNTR.
<br />COUNTER
<br />PTN.
<br />PARTITION
<br />CTR.
<br />CENTER
<br />Q.T.
<br />QUARRY TILE
<br />DBL.
<br />DOUBLE
<br />QSR
<br />QUICK SERVE RESTAURANT
<br />DEPT.
<br />DEPARTMENT
<br />R OR RAD. RADIUS
<br />DET.
<br />DETAIL
<br />R.D.
<br />ROOF DRAIN
<br />DIA.
<br />DIAMETER
<br />REF.
<br />REFERENCE
<br />DIM.
<br />DIMENSION
<br />REFR.
<br />REFRIGERATOR
<br />DISP.
<br />DISPENSER
<br />RGTR.
<br />REGISTER
<br />DN.
<br />DOWN
<br />REINF.
<br />REINFORCED
<br />D.O.
<br />DOOR OPENING
<br />REQ'D
<br />REQUIRED
<br />DR.
<br />DOOR
<br />RESIL.
<br />RESILIENT
<br />DWR.
<br />DRAWER
<br />RM.
<br />ROOM
<br />D.S.
<br />DOWNSPOUT
<br />R.O.
<br />ROUGH OPENING
<br />DWG.
<br />DRAWING
<br />R.W.L.
<br />RAIN WATER LEADER
<br />E.
<br />EAST
<br />S.
<br />SOUTH
<br />EA.
<br />EACH
<br />S.C.
<br />SOLID CORE
<br />E.J.
<br />EXPANSION JOINT
<br />SCHED.
<br />SCHEDULE
<br />EL.
<br />ELEVATION
<br />S.D.
<br />SOAP DISPENSER
<br />ELEC.ELECTRICAL
<br />SECT.
<br />SECTION
<br />E.P.
<br />ELECTRICAL PANELBOARD
<br />SH.
<br />SHELF
<br />EQ.
<br />EQUAL
<br />SNR.
<br />SHOWER
<br />EQPT.
<br />EQUIPMENT
<br />SHT.
<br />SHEET
<br />EXISTING
<br />SIM.
<br />SIMILAR
<br />EXP.
<br />EXPANSION
<br />SPEC.
<br />SPECIFICATION
<br />EXT.
<br />EXTERIOR
<br />SQ.
<br />SQUARE
<br />F.E.FIRE
<br />EXTINGUISHER
<br />S.S.
<br />STAINLESS STEEL
<br />F.F.
<br />FLOOR FINISH
<br />STD.
<br />STANDARD
<br />FDN.
<br />FOUNDATION
<br />STL.
<br />STEEL
<br />FIN.
<br />FINISH
<br />STOR.
<br />STORAGE
<br />FL.FLOOR
<br />STRL.
<br />STRUCTURAL
<br />FLASH'G
<br />FLASHING
<br />SYM•
<br />SYMMETRICAL
<br />FLUOR.
<br />FLUORESCENT
<br />T.B.S.
<br />TO BE SPECIFIED
<br />F.O.C.FACE
<br />OF CONCRETE
<br />TRD
<br />TREAD
<br />F.O.F.
<br />FACE OF FINISH
<br />T.B.
<br />TOWEL BAR
<br />F.O.S.
<br />FACE OF STUD
<br />T.C.
<br />TOP OF CURB
<br />FPRF.
<br />FIREPROOF
<br />TEL.
<br />TELEPHONE
<br />F.S.FLOOR
<br />SINK
<br />TER.
<br />TERRAllO
<br />FT.
<br />FOOT OR FEET
<br />T&G
<br />TONGUE &GROOVE
<br />FTG.
<br />FOOTING
<br />THK.
<br />THICK
<br />FURR.
<br />FURRING
<br />T.P.
<br />TOP OF PAVEMENT
<br />FUT.
<br />FUTURE
<br />T.P.D.
<br />TOILET PAPER DISPENSER
<br />G.A.
<br />GAUGE
<br />T.V.
<br />TELEVISION
<br />GALV.
<br />GALVANIZED
<br />T.W.
<br />TOP OF WALL
<br />GL.
<br />GLASS
<br />NP•
<br />TYPICAL
<br />GR.
<br />GRADE
<br />UNF.
<br />UNFINISHED
<br />GSMGALVANIZED
<br />SHEET METAL
<br />U.N.O.
<br />UNLESS NOTED OTHERWISE
<br />GYP.
<br />GYPSUM
<br />VERT.
<br />VERTICAL
<br />G.W.B.
<br />GYPSUM WALL BOARD
<br />V.C.T.
<br />VINYL COMPOSITE TILE
<br />H.B.
<br />HOSE BIBS
<br />W
<br />WEST
<br />H.C.
<br />HOLLOW CORE
<br />W/
<br />WITH
<br />HDWD.
<br />HARDWOOD
<br />W.B.
<br />WALL BASE
<br />HDWE.
<br />HARDWARE
<br />W.C.
<br />WATER CLOSET
<br />H.M.
<br />HOLLOW METAL
<br />WD.
<br />WOOD
<br />HORIZ.
<br />HORIZONTAL
<br />W/o
<br />WITHOUT
<br />HR.HOUR
<br />WP•
<br />WATERPROOF
<br />HT.
<br />HEIGHT
<br />WSCT.
<br />WAINSCOT
<br />WT.
<br />WEIGHT
<br />SYMBOLS
<br />SECTION MARK XX
<br />XX.X
<br />EXTERIOR ELEVATION TAG XX
<br />XX.X
<br />X
<br />ELEVATION TAG X XX.X X
<br />X
<br />ELEVATION MARK-JwOCAT 0
<br />FINISH TAG XX -X
<br />WINDOW TAG O
<br />DOOR TAG Q
<br />WALL TAG XX
<br />KEYED NOTE XX
<br />ARCO
<br />TRINITY PARKWAY @ SCOTT CREEK DR
<br />STOCKTON, CA
<br />GENERAL PROJECT NOTES
<br />1. ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE BUILDING CODES AND LOCAL
<br />RESTRICTIONS. CONTRACTORS MUST COMPLY WITH CONTRACTOR REGISTRATION
<br />REQUIREMENTS OF ALL GOVERNING AUTHORITIES. THE GENERAL BUILDING PERMITS
<br />SHALL BE PAID FOR BY THE OWNER UNLESS AGREED OTHERWISE. ALL OTHER
<br />PERMITS SHALL BE SECURED AND PAID FOR BY THE SUBCONTRACTOR DIRECTLY
<br />RESPONSIBLE. ALL REQUIRED CITY, COUNTY AND/OR STATE LICENSES SHALL BE
<br />ACQUIRED AND PAID FOR BY THE INDIVIDUAL SUBCONTRACTOR.
<br />2. IT IS THE INTENT OF THE OWNER, THE ARCHITECT AND THEIR CONSULTANTS, THAT
<br />ALL WORK DEPICTED IN THESE DRAWINGS AND SPECIFICATIONS IS TO BE PROVIDED
<br />BY THE GENERAL CONTRACTOR. ANY REFERENCES TO THE CONTRARY THROUGHOUT
<br />THE CONSTRUCTION DOCUMENTS OR SPECIFICATIONS IS NOT INTENDED. ADDITIONALLY,
<br />CONTRACTOR IS TO REFER TO THE BID DOCUMENT PACKET AND/OR OWNER'S SCOPE
<br />OF WORK DOCUMENT(S) WHICH SHALL TAKE PRECEDENCE OVER SCOPE THAT MAY BE
<br />PRESENTED IN THIS SET OF CONSTRUCTION DOCUMENTS OR SPECIFICATIONS. THE
<br />SCOPE OF WORK DOCUMENT IS INTENDED TO IDENTIFY ALL OWNER SUPPLIED ITEMS
<br />OR WORK PROVIDED BY OTHERS. ABSENCE OF THESE DOCUMENTS MEANS ALL WORK
<br />NOTED IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR UNLESS THE OWNER
<br />HAS SPECIFIED OTHERWISE DURING THE BID PROCESS.
<br />3. APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY
<br />WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT SAME INFORMATION AS THE
<br />APPROVED PLANS. CONTRACTOR SHALL MAINTAIN ONE COMPLETE SET OF PLANS ON
<br />THE PREMISES IN GOOD CONDITION AT ALL TIMES. THIS SHALL INCLUDE ALL ADDENDA
<br />AND CHANGE ORDERS.
<br />4. DISCREPANCIES BETWEEN PORTIONS OF THE CONTRACT DOCUMENTS, DRAWINGS AND
<br />SPECIFICATIONS ARE NOT INTENDED. THE CONTRACTOR IS TO CLARIFY ANY SUCH
<br />DISCREPANCIES WITH THE ARCHITECT OR PROJECT MANAGER PRIOR TO COMMENCING
<br />WORK. STATED DIMENSIONS TAKE PRECEDENCE OVER GRAPHICS, DO NOT SCALE
<br />DRAWINGS TO DETERMINE LOCATIONS. THE ARCHITECT OR PROJECT MANAGER SHALL
<br />BE NOTIFIED OF ANY SUCH DISCREPANCIES PRIOR TO CONTINUING WITH WORK.
<br />5. IT IS THE INTENT OF THE ARCHITECT THAT THIS WORK BE IN CONFORMANCE WITH
<br />ALL REQUIREMENTS OF THE BUILDING AUTHORITIES HAVING JURISDICTION OVER THIS
<br />TYPE OF CONSTRUCTION AND OCCUPANCY. THE CONTRACTOR SHALL NOTIFY
<br />ARCHITECT IMMEDIATELY OF CONFLICTS WITH GOVERNING CODE REQUIREMENTS BEFORE
<br />PROCEEDING FURTHER WITH THE AFFECTED WORK.
<br />6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING
<br />UTILITIES AND TO PROTECT THEM FROM DAMAGE. CONTRACTOR SHALL BEAR THE
<br />EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED
<br />BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK.
<br />7. THE CONTRACTOR TO PROVIDE FIRE SPRINKLER SYSTEM AND ALARM SYSTEM
<br />WHEN
<br />REQUIRED BY CODE AND NOTED AS REQUIRED BY THESE PLANS) IN ACCORDANCE
<br />WITH NFPA REQUIREMENTS. FIRE SPRINKLER CONTRACTOR IS TO SUBMIT COMPLETE
<br />SHOP DRAWINGS, LAYOUT AND RELATED DATA TO BUILDING DEPARTMENT AND FIRE
<br />MARSHAL FOR APPROVAL PRIOR TO INSTALLATION.
<br />8. FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S APPROVED
<br />SHOP DRAWINGS/DATA SHEETS IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
<br />ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL
<br />AND SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE IN THE
<br />WORK EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
<br />9. THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL FOOD SERVICE EQUIPMENT AND
<br />COORDINATE LOCATION OF ALL UTILITIES INCLUDING FLOOR SINKS, FLOOR DRAINS,
<br />SLOPES/SLAB DEPRESSIONS AND RAISED CURBS, ELECTRICAL AND PLUMBING AND
<br />STUBOUTS FOR FUTURE EQUIPMENT WHERE NOTED.
<br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE
<br />SITE
<br />WHILE JOB IS IN PROGRESS AND UNTIL BUILDING IS OCCUPIED.
<br />11. ALL DEBRIS SHALL BE REMOVED FROM PREMISES REGULARLY AND ALL AREAS SHALL
<br />BE LEFT IN A CLEAN (BROOM) CONDITION AT ALL TIMES.
<br />12. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF
<br />THE OCCUPANTS AND WORKERS AT ALL TIMES.
<br />13. CONTRACTOR SHALL PROVIDE TEMPORARY WATER, POWER, TELEPHONE, FACSIMILE OR
<br />METHOD TO RECEIVE E-MAIL, PRINTER AND TOILET FACILITIES AS REQUIRED.
<br />14. GENERAL CONTRACTOR IS RESPONSIBLE FOR RECEIVING, UNLOADING, UN -CRATING,
<br />INSTALLATION AND HOOKUP OF ALL FOOD SERVICE EQUIPMENT AND OTHER'OWNER
<br />OR VENDOR FURNISHED ITEMS.
<br />15. GENERAL CONTRACTOR IS REQUIRED TO LABEL ALL ELECTRICAL PANELS, PLUMBING
<br />VALVES, AND ROOF TOP EQUIPMENT WITH PLASTIC PHENOLIC ENGRAVED PLATES
<br />ATTACHED TO IDENTIFY THE EQUIPMENT USE OR PURPOSE.
<br />16. CONTRACTOR SHALL SUPPLY, LOCATE AND BUILD INTO THE WORK ALL INSERTS,
<br />ANCHORS, ANGLES, PLATES, OPENINGS, SLEEVES, HANGERS, SLAB DEPRESSIONS AND
<br />PITCHES AS MAY BE REQUIRED TO ATTACH AND ACCOMMODATE OTHER WORK.
<br />SPECIAL INSPECTION REQUIREMENTS MAY APPLY TO ALL STRUCTURAL EMBEDMENTS
<br />OR POST INSTALLED ANCHORS. CONTRACTOR SHALL CONFIRM REQUIREMENTS PRIOR
<br />TO INSTALLATION.
<br />17. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE MEANS AND METHODS
<br />FOR ERECTION PROCEDURE AND SEQUENCE OF THE CONSTRUCTION. CONTRACTOR TO
<br />INSURE THE SAFETY OF ALL INSTALLED IMPROVEMENTS, BUILDINGS AND THEIR
<br />COMPONENT PARTS DURING ERECTION.
<br />18. MATERIALS LISTED IN DRAWINGS ARE BASED ON DESIGN INTENT. ALTERNATE
<br />SPECIFICATIONS MAY BE ACCEPTED PROVIDED THEY CLOSELY MATCH AND ARE
<br />DEEMED EQUAL TO SPECIFIED MATERIAL. GENERAL CONTRACTOR IS TO SUBMIT
<br />PROPOSED SAMPLES OF SUBSTITUTIONS, ALONG WITH SAMPLE OF THAT SPECIFIED IN
<br />DRAWINGS FOR REVIEW BY THE ARCHITECT OR PROJECT MANAGER. SUBSTITUTIONS
<br />WILL ONLY BE APPROVED IF SPECIFIED MATERIAL IS PROVEN TO BE UNAVAILABLE
<br />WITHIN A REASONABLE TIME FRAME OR THE SUBSTITUTION IS A BENEFIT TO THE
<br />OWNER RELATED TO COST OR SCHEDULE TIME SAVINGS.
<br />19. THE PROJECT BOUNDARIES SHALL BE CONFIRMED BY THE CONTRACTOR PRIOR TO
<br />CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE OWNERS ATTENTION
<br />IMMEDIATELY BEFORE PROCEEDING WITH CONSTRUCTION.
<br />20. ALL LABOR, MATERIALS AND INSTALLATIONS MUST COMPLY WITH THE CODES AND
<br />REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION. ANY DISCREPANCY WHICH
<br />EXISTS BETWEEN THE REQUIREMENTS BY THE PLANS, SPECIFICATIONS, SAID CODES,
<br />RULES AND REGULATIONS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF
<br />THE ARCHITECT, IN WRITING FOR RESOLUTION. IF ANY CHANGE IN THE PLANS AND/
<br />OR SPECIFICATIONS OCCURS AS A RESULT OF THE REQUIREMENTS OF THE LIFE
<br />SAFETY CODE (NFPA 101) OR ANY OTHER AUTHORITIES HAVING JURISDICTION AFTER
<br />ADJUST THEIR BIDS, IF NECESSARY, ONLY FOR THE CHANGE. THE SUBMISSION OF BIDS, THEN THE BIDDERS WILL BE GIVEN THE OPPORTUNITY TO
<br />21. THE CONTRACTOR SHALL COORDINATE THE WORK WITH MECHANICAL, ELECTRICAL AND
<br />PLUMBING DRAWINGS FOR ALL NECESSARY OPENINGS AND PENETRATIONS THROUGH
<br />WALLS, CEILING AND FLOORS.
<br />22. ALL EXPOSED PIPES, CONDUITS OR DUCTS IN FINISHES AREAS, WHETHER SHOWN ON
<br />DRAWINGS OR NOT, SHALL BE FURRED OUT WITH GYPSUM BOARD.
<br />23. LOCATION OF ACCESS DOORS SUPPLIED BY MECHANICAL TRADES AND INSTALLED BY
<br />OTHERS SHALL BE DETERMINED IN THE FIELD THROUGH COORDINATION OF TRADES,
<br />WHICH ACCESS DOORS ARE REQUIRED. ACCESS DOORS SHALL NOT BE PLACED IN
<br />LOCATION OF LIGHT FIXTURES SHALL GOVERN POSITION OF DUCTS AND PIPES FOR
<br />INACCESSIBLE POSITIONS OR IN THE WAY OF LIGHTS, GRILLS, REGISTERS, CONCEALED
<br />BY CASEWORK, ECT.
<br />24. ALL DEFERRED SUBMITTALS SHALL BE REVIEWED BY THE DESIGN PROFESSIONAL IN
<br />CHARGE AND FORWARD THEM TO THE BUILDING DEPT. INDICATING THAT THE
<br />DEFERRED ITEMS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL
<br />CONFORMANCE TO THE DESIGN OF THE BUILDING.
<br />LEGAL DESCRIPTION/ DATA
<br />PARCEL 1 OF THE TENTATIVE PARCEL MAP FOR ARCO TRINITY PARKWAY
<br />BEING RESULTANT PARCEL 2 AS SHOWN ON THAT CERTAIN CERTIFICATE OF LOT LINE
<br />ADJUSTMENT LLA 15-02 AND SHOWN ON THE GRANT DEED RECORDED AS DOCUMENT
<br />NO. 2015-150966, SAN JAGQUIN COUNTY RECORDS AND LYING IN A PORION OF
<br />SECTION 1, TOWNSHIP 2 NORTH, RANGE 5 FAST, MOUNT DIABLO MERIDIAN, CITY OF
<br />STOCKTON, SAN JOAQUIN COUNTY, CALIFORNIA, JUNE 2016.
<br />PROJECT DESCRIPTION: PROPOSED ARCO am/pm GAS STATION,
<br />C -STORE AND CAR WASH
<br />ASSESSORS PARCEL 066-020-02
<br />NUMBER:
<br />SITE AREA: 53,659 SF
<br />1.23 AC
<br />FLOODZONE: ZONE "X", PER COMMUNITY PANEL NO.
<br />06077CO295F, DATED OCTOBER 16, 2009.
<br />ZONING•
<br />MX- MIXED USE
<br />CITY APPROVAL
<br />CITY OF STOCKTON
<br />RESOLUTION NO. 2016-05-26-0301
<br />PROJECT DATA
<br />PROJECT ADDRESS: 10849 TRINITY PARKWAY
<br />STOCKTON, CA
<br />BUILDINGS • am/pm STORE
<br />CONSTRUCTION TYPE: V -B
<br />USE GROUP: M (CONVENIENCE STORE)
<br />ALLOWABLE AREA: 9,000 S.F.
<br />ACTUAL GROSS AREA: 3,054 S.F.
<br />BUILDING FOOTPRINT: 3,174 S.F.
<br />AC NOPY
<br />CONSTRUCTION TYPE: II -B
<br />USE GROUP: M (FUEL CANOPY)
<br />ALLOWABLE AREA: 12,500 S.F.
<br />ACTUAL GROSS AREA: 5,989.5 S.F.
<br />BUILDINGS : CARWASH
<br />CONSTRUCTION TYPE: V -B
<br />USE GROUP: B (BUSINESS)
<br />ALLOWABLE AREA:, 9,000 S.F.
<br />ACTUAL GROSS AREA: 1,382 S.F.
<br />OCCUPANCY AND EGR
<br />CONVENIENCE _STORE
<br />SALES - 1,701 S.F.(1701/30) = 57
<br />CASHIER - 131 S.F.(131/100) = 2
<br />OFFICE - 68 S.F. (68/100) = 1
<br />RESTROOMS - 114 S.F. (EXEMPT) = Q
<br />PREP/UTILITY - 405 S.F.(405/200) = 3
<br />COOLER/FREEZER - 533 S.F. (*EXEMPT) = 0
<br />TOTAL (NET): 2,952 S.F. = 63 OCCUPANTS
<br />TOTAL (GROSS): 3,054 S.F.
<br />*COOLER IS A NON OCCUPIABLE SPACE PER SECTION 202
<br />DEFINITION OF AN OCCUPIABLE SPACE.
<br />EXITS REQUIRED: 2
<br />EXITS PROVIDED: 2
<br />PLUMBING FIXTURE COUNT:
<br />CONVENIENCE TORE:
<br />PER CPC 422.1 LOAD FACTOR TABLE 'A'
<br />M -MERCANTILE OCC LOAD FACTOR = 1/200
<br />3054 SF/ 200 = 16 OCC LOAD
<br />PER CPC 422.2 EXCEPTION 3-
<br />-OCC LOAD LESS THAN 50 ALLOWS 1 UNISEX
<br />PROVIDED
<br />MEN FIXTURES PROVIDED = 1 WATER CLOSET, 1 LAV
<br />WOMEN FIXTURES PROVIDED = 1 WATER CLOSET, 1 LAV
<br />SPECIAL INSPECTIONS
<br />-SPECIAL INSPECTIONS: SEE STRUCTURAL SHEET S3.4 FOR REQUIREMENTS
<br />SEPARATE AT
<br />E
<br />SUBMITTALS
<br />T
<br />A
<br />L
<br />S
<br />-SIGNAGE PERMITS
<br />DEFFERRED SUBMITTALS
<br />-TRUSS SHOP DRAWINGS
<br />APPLICABLE CODES
<br />BUILDING CODE :
<br />2013 CALIFORNIA BUILDING CODE
<br />GC -1
<br />(BASED ON 2012 IBC)
<br />GC -2
<br />2013 CALGREEN CODE
<br />MO.3
<br />(BASED ON 2012 CALIF GREEN
<br />MOA
<br />BUILDING STANDARDS CODE)
<br />PLUMBING CODE:
<br />2013 CALIFORNIA PLUMBING CODE
<br />EO.4
<br />(BASED ON 2012 UPC)
<br />ELECTRICAL CODE:
<br />2013 CALIFORNIA ELECTRICAL CODE
<br />EO.6
<br />(BASED ON 2011 NEC)
<br />MECHANICAL CODE:
<br />2013 CALIFORNIA MECHANICAL CODE
<br />EO.8
<br />(BASED ON 2012 UMC)
<br />ENERGY CODE:
<br />2010 ENERGY STANDARDS
<br />AS AMENDED
<br />BY STATE OF CALIF, AND LOCAL JURISDICTION
<br />SITE VICINITY MAP
<br />PROJECT DIRECTORY
<br />APPLICANT/ OWNER
<br />KEN DHARNI
<br />6698 MACK ROAD
<br />SACRAMENTO, CA 95821
<br />ARCHITECTCIVIL, PETROLEUM. LANDSCAP
<br />BARGHAUSEN CONSULTING ENGINEERS
<br />915 HIGHLAND POINT DRIVE
<br />ROSEVILLE, CA 95209
<br />PROJECT CONTACT. PETE TOBIN
<br />(425) 656-7416
<br />STRUCTURAL ENGINEER
<br />PCS STRUCTURAL SOLUTIONS
<br />811 FIRST AVENUE, SUITE 620
<br />SEATTLE, WA
<br />PROJECT CONTACT: JACK PINKARD
<br />PHONE: (206) 292-5076
<br />PLUMBING MECHANICAL ELECTRICAL ENGINEER
<br />SACRAMENTO ENGINEERING CONSULTANTS
<br />10555 OLD PLACERVILLE RD
<br />SACRAMENTO, CA 95827
<br />(916) 368-4468
<br />UR EYO
<br />NORTHSTAR ENGINEERING GROUP, INC.
<br />620 12TH STREET
<br />MODESTO, CA 95354
<br />PHONE: (209) 524-3525
<br />SOILS ENGINEER
<br />KLEINFELDER
<br />2001 ARCH AIRPORT RD SUITE 100
<br />STOCKTON, CA 95206
<br />(209) 948-1395
<br />DEVELOPMENT CONTACTS
<br />BUILDING:
<br />CITY OF STOCKTON COMMUNITY DEPT
<br />BUILDING AND LIFE SAFETY
<br />425 N. ELDORADO STREET
<br />STOCKTON, CA 95202
<br />(209) 937-8561
<br />PLANNING,
<br />CITY OF STOCKTON COMMUNITY DEPT
<br />PLANNING
<br />425 N. ELDORADO STREET
<br />STOCKTON, CA 95202
<br />(209) 937-8266
<br />ENGINEERING:
<br />CITY OF STOCKTON COMMUNITY DEPT
<br />ENGINEERING DIVISION
<br />425 N. EL DORADO STREET
<br />STOCKTON, CA 95202 SAN JOAQUIN COUNTY
<br />(209) 937-8266 ENVIRONMENTAL HEALTH DEPARTMEI
<br />FIS 1868 E. HAZELTON AVE.
<br />FIRE PREVENTION STOCKTON, CA 95205
<br />345 N. ELDORADO STREET;- (209)463 3420
<br />STOCKTON, CA 95202 0 Approv6d
<br />(209) 937-8271 pproved with changeq See Remarks
<br />L7.Dfsapproved See �P,{�.�{irks
<br />��1p�
<br />Remarks
<br />WATER/ SEWER/
<br />ST RM:
<br />CITY OF STOCKTON - -
<br />MUNICIPAL UTILITIES ---
<br />425 N. ELDORADO STREETDate fly
<br />STOCKTON, CA A royal
<br />sszo2 xte
<br />PP ds only that whwfi is own and de
<br />(209) 937-8436 hereon and does not authorize or aMID
<br />rove any omi
<br />deviation from requirements of state laws or local ordin
<br />HEALTH/ FOOD -
<br />SAN JOAQUIN ENVIRONMENTAL HEALTH DEPT
<br />FOOD FACILITY PLAN REVIEW
<br />1868 EAST HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468-3420
<br />CUPA:
<br />SAN JOAQUIN COUNTY
<br />ENVIRONMENTAL HEALTH DEPT
<br />1868 EAST HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468-3420
<br />AE
<br />SAN JOAQUIN VALLEY
<br />AIR POLLUTION CONTROL DISTRICT NORTHERN REGION OFFICE
<br />4800 ENTERPRISE WAY
<br />MODESTO, CA 95356
<br />(209) 557-6400
<br />ELECTRIC/ GAS:
<br />PACIFIC GAS & ELECTRIC
<br />PERMIT ISSUE DATES
<br />INDEX OF DRAWINGS
<br />** FOOD FACILITIES SUBMITTAL- SHEETS
<br />GENERAL
<br />T1.1 ** COVER SHEET
<br />GC -1
<br />GREEN BUILDING CHECKLIST
<br />GC -2
<br />GREEN BUILDING CHECKLIST
<br />MO.3
<br />MECHANICAL T-24 FORMS
<br />MOA
<br />MECHANICAL T-24 FORMS
<br />MO.5
<br />MECHANICAL T-24 FORMS
<br />EO.4
<br />TITLE 24 FORMS -INDOOR LIGHTING PART 1
<br />EO.5
<br />TITLE 24 FORMS -INDOOR LIGHTING PART 2
<br />EO.6
<br />TITLE 24 FORMS -OUTDOOR LIGHTING
<br />E0.7
<br />TITLE 24 FORMS -INDOOR LIGHTING CARWASH PART 1
<br />EO.8
<br />TITLE 24 FORMS -INDOOR LIGHTING CARWASH PART 2
<br />SURVEY
<br />S-1
<br />BOUNDARY & TOPO SURVEY MAP
<br />SITE LIGHTING PLAN
<br />1 of 1
<br />PHOTOMETRIC SITE PLAN
<br />CIVIL
<br />ROOF PLAN
<br />C1.0
<br />COVER SHEET
<br />C2.0
<br />SITE PLAN
<br />C3.0
<br />DEMOLITION AND EROSION CONTROL PLAN
<br />C3.1
<br />EROSION CONTROL NOTES AND DETAILS
<br />C4.0
<br />GRADING AND STORM DRAINAGE PLAN
<br />C5.0
<br />UTILITY PLAN
<br />C6.0
<br />NOTES AND DETAILS
<br />C6.1
<br />NOTES AND DETAILS
<br />C6.2
<br />NOTES AND DETAILS
<br />C6.3
<br />RECLAIM SYSTEM DETAILS
<br />C7.0
<br />ARCO SITE SPECIFICATIONS
<br />C7.1
<br />ARCO SITE SPECIFICATIONS
<br />C7.2
<br />ARCO SITE SPECIFICATIONS
<br />LANDSCAPE
<br />L1
<br />LANDSCAPE - PLANTING PLAN
<br />L2
<br />LANDSCAPE - PLANTING NOTES AND DETAILS
<br />L3
<br />LANDSCAPE - IRRIGATION PLAN
<br />L4
<br />LANDSCAPE - IRRIGATION NOTES AND DETAILS
<br />ARCHITECTURAL
<br />A1.1 **
<br />CONSTRUCTION FLOOR PLAN
<br />A1.2 **
<br />REFLECTED CEILING PLAN
<br />A1.3
<br />ROOF PLAN
<br />A2.1
<br />EXTERIOR ELEVATIONS
<br />A2.3 **
<br />INTERIOR ELEVATIONS
<br />A2.4 **
<br />INTERIOR ELEVATIONS
<br />A2.5 **
<br />INTERIOR ELEVATIONS
<br />A2.6 **
<br />INTERIOR ELEVATIONS AND ENLARGED RESTROOM PLAN
<br />A3.1
<br />BUILDING SECTIONS
<br />A3.2
<br />WALL SECTIONS
<br />A3.3
<br />WALL SECTIONS
<br />A4.1
<br />DETAILS
<br />A4.2
<br />DETAILS
<br />A5.1
<br />DOOR AND WINDOW SCHEDULE
<br />A7.1
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.2
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.3
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.4
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.5
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.6
<br />ARCHITECTURAL SPECIFICATIONS
<br />Q1.1 **
<br />EQUIPMENT PLAN
<br />Q1.2 **
<br />COOLER PACKAGE
<br />Q2.1 **
<br />EQUIPMENT SCHEDULE
<br />Q2.2
<br />NOT USED
<br />Q2.3
<br />SMALL WARES SCHEDULE
<br />SNA -1
<br />SIGN PLAN- SEPARATE PERMIT SUBMITTAL
<br />TE -1
<br />TRASH / RECYCLE ENCLOSURE PLANS
<br />CARWASH-
<br />ARCHITECTURAL
<br />CWA1.1
<br />CARWASH FLOOR PLAN
<br />CWA1.2
<br />CARWASH REFLECTED CLG/ ROOF PLAN
<br />CWA2.1
<br />CARWASH EXTERIOR ELEVATIONS
<br />CWA3.1
<br />CARWASH BLDG SECTION/ WALL SECTIONS/ DETAILS
<br />CARWASH-
<br />EQUIPMENT
<br />CWQ1.1
<br />CARWASH EQUIPMENT
<br />CWQ1.2
<br />CARWASH EQUIPMENT
<br />CWQ1.3
<br />CARWASH EQUIPMENT
<br />C WQ1.4
<br />CARWASH EQUIPMENT
<br />CWQ1.5
<br />CARWASH EQUIPMENT
<br />STRUCTURAL
<br />S1.1
<br />FOUNDATION PLAN
<br />S1.2
<br />CEILING FRAMING PLAN
<br />S1.3
<br />ROOF FRAMING PLAN
<br />CSW1.1
<br />CARWASH FOUNDATION PLAN
<br />CSW1.2
<br />CARWASH ROOF FRAMING PLAN
<br />S2.1
<br />DETAILS
<br />S2.2
<br />DETAILS
<br />S2.3
<br />DETAILS
<br />S2.4
<br />DETAILS
<br />S2.5
<br />DETAILS
<br />S2.6
<br />DETAILS
<br />-S2.7
<br />DETAILS
<br />52.8
<br />DETAILS
<br />S2.9
<br />DETAILS
<br />'S2.10
<br />DETAILS
<br />IS3.1
<br />GENERAL NOTES
<br />S3.2
<br />GENERAL NOTES
<br />S3.3
<br />GENERAL NOTES
<br />S3.4
<br />GENERAL NOTES
<br />CANOPY- ARCHITECTURAL
<br />CA -1 CANOPY FLOOR PLAN
<br />CA -2 CANOPY EXTERIOR ELEVATIONS
<br />CA -3 CANOPY REFLECTED CEILING PLAN
<br />CANOPY- STRUCTURAL
<br />CS1
<br />CANOPY COVER SHEET
<br />E1
<br />FRAMING PLAN
<br />E2
<br />ELEVATIONS
<br />E3
<br />LIGHTING & SOFFIT PLAN
<br />E4
<br />SECTION
<br />E5
<br />SECTION
<br />F1
<br />FOUNDATION PLAN
<br />PLUMBING
<br />PO.1
<br />**
<br />PLUMBING
<br />LEGEND, SCHEDULES & CALCULATIONS
<br />PO.2
<br />**
<br />PLUMBING
<br />GENERAL NOTES & SPECIFICATIONS
<br />P1.1
<br />**
<br />PLUMBING
<br />ROUGH -IN PLAN
<br />P2.1
<br />**
<br />SANITARY DRAINAGE & VENT PLUMBING PLAN AND
<br />ISOMETRIC
<br />DIAGRAM
<br />P3.1
<br />**
<br />DOMESTIC
<br />WATER SUPPLY PLUMBING PLAN AND
<br />ISOMETRIC
<br />DIAGRAM
<br />P4.1
<br />PLUMBING
<br />ROOF PLAN
<br />P5.1
<br />**
<br />GAS PIPING PLUMBING PLANS AND ISOMETRIC DIAGRAM
<br />P6.1
<br />**
<br />PLUMBING
<br />DETAILS - I
<br />P6.2
<br />**
<br />PLUMBING
<br />DETAILS - II
<br />INDEX OF DRAWINGS -CONT
<br />MECHANICAL
<br />Mo.1 ** EQUIPMENT SCHEDULE, LEGEND AND NOTES
<br />MO.2 ** MECHANICAL SPECIFICATIONS
<br />M2.1 ** MECHANICAL FLOOR PLAN
<br />M2.2 MECHANICAL ROOF PLAN
<br />M6.1 ** MECHANICAL DETAILS
<br />M6.2 ** HOOD & FAN SHOP DRAWINGS
<br />M9.1 ** CONTROLS
<br />ELECTRICAL
<br />ES1.1 SITE PLAN
<br />EO.1 LEGEND, NOTES & SCHEDULES
<br />EO.2 SPECIFICATIONS
<br />EO.3.1 SINGLE LINE DIAGRAM & EQUIPMENT SCHEDULE
<br />EO.3.2 ELECTRICAL PANEL SCHEDULES
<br />111.0 LIGHTING PLAN
<br />E2.0 POWER PLAN
<br />E2.1 ELECTRICAL ROUGH -IN PLAN
<br />E3.0 ELECTRICAL ROOF PLAN
<br />E4.0 COMMUNICATIONS PLAN
<br />E5.0 DIAGRAMS & DETAILS PART 1
<br />E5.1 DIAGRAMS & DETAILS PART 2
<br />E6.1 CANOPY POWER PLAN, DETAILS
<br />E6.2 CANOPY LIGHTING PLAN, DETAILS
<br />CARWASH ELECTRICAL/ PLUMBMING
<br />CW1.1 CARWASH ELECTRICAL
<br />CWP 1.1 CARWASH PLANS, LEGEND, NOTES & SCHEDULES
<br />CWP1.2 CARWASH DETAILS
<br />PETROLEUM PLANS
<br />G.0.0 TITLE SHEET AND DRAWING INDEX
<br />G.0.2.0 UNDERGROUND TANK AND PIPING SITE PLAN AND INSTALLATION NOTES
<br />G.0.2.1 TANK & PIPING SCOPE OF WORK & GENERAL NOTES (FRP 1 OF 2)
<br />G.0.2.2 TANK & PIPING SCOPE OF WORK & GENERAL NOTES (FRP 2 OF 2)
<br />G.0.5 DESIGN INTENT MISCELLANEOUS DETAILS
<br />G.0.6.2 DESIGN INTENT: NEW VENT STACK INSTALLATION DETAILS W/
<br />VEEDER-ROOT CARBON CANISTER VAPOR POLISHER (CALIFORNIA
<br />ONLY)
<br />G.0.7.2 TANK FILL & VAPOR RISER STATIC GROUNDING DETAILS (CALIFORNIA
<br />ONLY)
<br />M.5.3.01 TANK AND PIPING MATERIALS LIST (1 OF 2)
<br />M.5.3.02 TANK AND PIPING MATERIALS LIST (2 OF 2)
<br />M.5.3.03 TYPICAL 25,000 GALLON DOUBLE WALL FIBERGLASS TANK
<br />INSTALLATION DETAILS
<br />M.5.3.04 TYPICAL 12,000/8,000 GALLON DOUBLE WALL FIBERGLASS TANK
<br />INSTALLATION DETAILS
<br />M.5.3.08 UST INSTALLATION (1) 10'0 25K & (1) 10'0 12K/8K BLENDING,
<br />DOUBLE WALL VENT & VAPOR
<br />M.5.3,10 ANCHORING DETAIL
<br />M.5.3.12 TURBINE SIDE SUMPS AND PIPING INSTALLATION DETAILS
<br />M.5.3.16 FILL SIDE SUMP INSTALLATION DETAILS (DOUBLE WALL VENT/VAPOR)
<br />M.5.3.18 DIESEL FILL SIDE SUMP INSTALLATION DETAILS OPW
<br />(DOUBLE WALL VENT)
<br />M.5.3.22 DISPENSER DETAILS: WAYNE OVATION (3+0) BLEND DISPENSER
<br />INSTALLATION DETAILS (D.W. VAPOR)
<br />M.5.3.23 DISPENSER DETAILS: WAYNE OVATION (3+1) BLEND DISPENSER
<br />INSTALLATION DETAILS (D.W. VAPOR)
<br />M.5.3.27 TANK SLAB CONCRETE SPECIFICATIONS & IDENTIFICATION
<br />MARKING DETAILS
<br />M.5.3.28 ELECTRICAL FUELING SITE PLAN
<br />M.5.3.29 ELECTRICAL FUELING POINT-TO-POINT CONDUIT PLAN
<br />M.5.3.30 IST -IFC, CAT 5, AND VEEDER-ROOT NOTES
<br />M.5.3.31 ELECTRICAL FUELING DETAILS FOR VEEDER-ROOT & POWER
<br />DISTRIBUTION CENTER (20K & 12K/10K TANKS)
<br />M.5.3.32 ELECTRICAL PANEL POWER AND CONTROL WIRING DETAILS
<br />M.5.3.33 ELECTRICAL PANEL E -STOP CONTROL WIRING SCHEMATIC
<br />M.5.3.34 EMERGENCY SHUTDOWN SCHEMATIC FUELING CONTROL W/VFC's
<br />GREEN BUILDING NOTES
<br />1. EXCAVATED SOIL AND LAND CLEARING DEBRIS - 100 PERCENT OF TREES,
<br />STUMPS, ROCKS, AND ASSOCIATED VEGETATION AND SOIL RESULTING
<br />PRIMARILY FROM LAND CLEARING SHALL BE REUSED OR RECYCLED PER
<br />CGBC 5.408.3.
<br />2. THE OWNER SHALL PROVIDE A READILY ACCESSIBLE AREAS THAT SERVE
<br />THE ENTIRE BUILDING AND ARE AND ARE IDENTIFIED FOR THE DEPOSITING,
<br />STORAGE AND COLLECTION OF NON -HAZARDOUS MATERIALS FOR
<br />RECYCLING, INCLUDING (AT A MINIMUM) PAPER CORRUGATED D CARDBOARD,
<br />GLASS, PLASTICS AND METALS OR MEETS A LAWFULLY
<br />RECYCLING ORDINANCE, IF MORE RESTRICTIVE. ENACTED LOCAL
<br />3. THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING
<br />CONSTRUCTION IF NECESSARY TO CONDITION THE BUILDING WITHIN THE
<br />REQUIRED TEMPERATURE RANGE FOR MATERIAL AND EQUIPMENT
<br />INSTALLATION. IF THE HVAC SYSTEM IS USED DURING CONSTRUCTION, USE
<br />RETURN AIR FILTERS WITH A MINIMUM EFFICIENCY REPORTING VALUE
<br />(MERV) OF 8, BASED ON ASHRAE 52.2-1999, OR AN AVERAGE EFFICIENCY
<br />OF 30 PERCENT BASED ON ASHRAE 52.1-1992. REPLACE ALL FILTERS
<br />IMMEDIATELY PRIOR TO OCCUPANCY PER CGBC 5.504.1.3
<br />4. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE
<br />CONSTRUCTION SITE UNTIL FINAL STARTUP OF THE HEATING, COOLING AND
<br />VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR DISTRIBUTION
<br />COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET
<br />METAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO
<br />REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS WHICH MAY ENTER
<br />THE SYSTEM PER CGBC 5.504.3
<br />5. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED
<br />AREAS OF THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND
<br />RETURN AIR THAT PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING
<br />VALUE (MERV) OF 8. MERV 8 FILTERS SHALL BE INSTALLED PRIOR TO
<br />OCCUPANCY, AND RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF
<br />THE SAME VALUE SHALL BE INCLUDED IN THE OPERATION AND
<br />MAINTENANCE MANUAL.
<br />6. INSTALL HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT THAT
<br />DO NOT CONTAIN CFC'S. AND HALONS PER CGBC 5.508.1
<br />ARCO
<br />BP WEST COAST PRODUCTS, LLC
<br />T7HG If
<br />ENG
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />(425)251-6222
<br />(425)251-8782 FAX
<br />CML ENGINEERING, LAND PLANNING,
<br />SURVEYING, ENVIRONMENTAL SERVICES
<br />NO. I DATE I REVISION DESCRIPTION
<br />05/16/16 BP APPROYI]) EQUIPMENT PLAN
<br />07/13/16 PERMIT SUBMITTAL
<br />SEAL•
<br />Al� OF CAS 7F0
<br />& DANIEL BRIAN
<br />r7 GOALWIN Y
<br />C-18865
<br />n REN. 8/31/17 �U
<br />��SeO
<br />ARCa\/
<br />ARCO NTI
<br />MODIFIED
<br />3000 am
<br />m
<br />P
<br />w/ 26'x65' CAR WASH
<br />FUEL CANOPY w/ 8 MPD's
<br />ADDRESS:
<br />TRINITY PARKWAY
<br />@ SCOTT CREEK DRIVE
<br />STOCKTON,CA
<br />FACILITY # TBD
<br />DE9GNE0 BY:
<br />AWANCE ZdfDAk
<br />CHECKED BY:
<br />BP REPM:
<br />DRAWN BY:
<br />ALLIANCE PM:
<br />MR90N:
<br />_
<br />PROJECT N0:
<br />_
<br />16700
<br />COVER SHEET
<br />T1.1
<br />i
<br />i�
<br />X
<br />z
<br />0
<br />W
<br />n
<br />0
<br />U
<br />n
<br />i
<br />Z
<br />
|