Laserfiche WebLink
Aoaendix 8 <br /> 71 SO Overfill Valve in Tank Shut off level Worksheet <br /> Important: This Is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion.(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the UpperTube Length must be at least 16"to in- <br /> clude the protective)1 end in the tube. <br /> (D) <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube,valve length. <br /> { tD) <br /> _ 3 <br /> Upper <br /> V / f Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note:If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 &61IP models add 0.61 (W)Valve <br /> (B)= i f Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number(X)which corresponds <br /> to the 100%vo�tu e11 (8) <br /> (Y)= To Tank <br /> tYi <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length(D)from distance to tank MValve Chart <br /> bottom(8) j It length, 10096 <br /> (X)=(B)-(D)-2"_ top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated(X)dimension and the 100%volume(Y)tank t i! <br /> capacity. i <br /> (X)tank capacity in gallons= �� ZQ <br /> (Y)tank capacity In gallons= <br /> �O <br /> SO%=(X)capacity/(Y)capacity x100= q I.-2-a <br /> Note: The overfill valve must be installed per ARJ require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />