Laserfiche WebLink
Document StatusafterpermitSheet NumberChecked by:Project:Drawn by:biddingDate:plan chkSheet ContentRevisions123456ARCHITECTS, INCORPORATEDcSCHUSS CLARK BRANDON ARCHITECTS, INCORPORATED EXPRESSLY RESERVE THEIR COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS ARE NOT TO BE REPRODUCED, CHANGED, OR COPIED IN ANY FORM OR MANNER WHATSOEVER, NOR ARE THEY TO BE ASSIGNED TO A THIRD PARTY WITHOUT OBTAINING WRITTEN PERMISSION AND CONSENT OF SCHUSS CLARK BRANDON ARCHITECTS, INCORPORATED. SHOULD UNAUTHORIZED RE-USE BY A THIRD PARTY OCCUR, SCHUSS CLARK BRANDON ARCHITECTS, INCORPORATED SHALL BE HELD HARMLESS.2018 SCHUSS CLARK BRANDONPARK WEST PLACE SHOPPING CENTER <br />10408 TRINITY PARKWAY <br />STOCKTON, CA 9521918-442.18Exp. June 30, 2020No. 34874M-1GENERAL NOTES1.THESE PLANS ARE DIAGRAMMATIC ONLY, AND ILLUSTRATE GENERAL INTENT OF DUCTWORK /PIPE ROUTING, EQUIPMENT LOCATION, MOUNTING, ETC. CONTRACTOR SHALL MAINTAIN ACURRENT SET OF AS-BUILT DRAWINGS ON SITE AT ALL TIMES DURING CONSTRUCTION.2.CODES: ALL HEATING, AIR CONDITIONING, AND VENTILATING WORK SHALL CONFIRM TO THELATEST REQUIREMENTS OF THE CALIFORNIA BUILDING/MECHANICAL/PLUMBING CODES (2013),TITLE 24 ENERGY COMMISSION NON-RESIDENTIAL STANDARDS, N.F.P.A. AND THE LOCALMECHANICAL CODE AND ANY OTHER LEGALLY CONSTITUTED BODY HAVING JURISDICTIONTHEREOF.3.PERMITS: THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL FEES, PERMITS, AND LICENSESREQUIRED FOR THE INSTALLATION OF THE WORK AND SHALL DELIVER SAME TO THE OWNERSREPRESENTATIVE/ARCHITECT.4.SHEET METAL DUCTWORK: ALL SUPPLY AND RETURN DUCTWORK MAINS AND BRANCHESSHALL BE A MINIMUM 26 GA. GALVANIZED SHEET METAL IN ACCORDANCE WITH THE LATESTSMACNA DUCT MANUAL, AND LOCAL CODES. SUPPLY AND RETURN DUCTWORK SHALL BEINSULATED PER NON-RESIDENTIAL TITLE 24.5.FLEXIBLE DUCTWORK: DUCTWORK SHALL BE INSULATED HIGH PRESSURE FLEXIBLE DUCTWITH A FACTORY ASSEMBLY CONSISTING OF A GALVANIZED SPRING STEEL WIRE HELIX, ACONTINUOUS INNER LINER WRAPPED WITH NOMINAL 1 IN. THICK BY 1 LB/CU. DENSITY GLASSFIBER INSULATION. THE ASSEMBLY SHALL BE ENCLOSED IN A CLASS 1 FIRE RESISTIVE VAPORBARRIER JACKET, FACTORY SEALED AT BOTH ENDS. THE FLEXIBLE DUCT SHALL BE LISTED BYU.L. AND SHALL CONFORM TO THE 90-A CLASS 1 REQUIREMENTS OF THE N.F.P.A. FLEXIBLEDUCT SHALL BE INSULATED IN FULLY EXTENDED CONDITION FREE OF SAGS AND KINKS AS FARAS PRACTICAL. MINIMUM THERMAL RESISTANCE SHALL BE PER TITLE 24. FLEXIBLE DUCT SHALLBE GLASS-FLEX, CAL-FLEX, CASCO OR APPROVED EQUAL.6.EQUIPMENT: SHALL BE MODEL, TYPE AND CAPACITIES AS INDICATED ON THE DRAWINGS ANDSHALL MEET OR EXCEED THE MINIMUM EFFICIENCY AS LISTED IN THE T24 BUILDING ENERGYEFFICIENCY STANDARDS.7.CONTROLS: SHALL BE FURNISHED AND INSTALLED AS INDICATED ON THE DRAWINGS.THERMOSTATS: ALL THERMOSTATS TO BE TITLE-24 APPROVED. THERMOSTATS TO BEPROGRAMMABLE WITH NIGHT SET BACK FEATURES AND AUTOMATIC COOLING/ HEATING MODECHANGE-OVER.8.CERTIFICATE OF ACCEPTANCE AND ALL RELATED ACCEPTANCE DOCUMENTS SHALL BESUBMITTED TO THE FIELD INSPECTOR DURING CONSTRUCTION. CERTIFICATE OF OCCUPANCYWILL NOT BE ISSUED UNTIL THESE FORMS ARE REVIEWED AND APPROVED.9.ALL PIPING AND DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS OFSECTIONS 118, 123, 124 TITLE 24 ENERGY STANDARDS, AND TABLE 6-6A AND 6B OF CMC.DUCTWORK INSULATION SHALL HAVE A MINIMUM R-8 INSULATING VALUE PER TITLE 24CALCULATIONS.10. ALL HVAC SYSTEMS SHALL MEET THE THE CONTROL REQUIREMENTS PER SECTION 112 AND 122 E.E.S.11.ALL HVAC EQUIPMENT AND APPLIANCES SHALL MEET THE REQUIREMENTS PER SECTION 111-113, 115, 120-124 TITLE 24 ENERGY STANDARDS.12.VENTILATION AIR SHALL NOT BE TRANSFERRED FROM ADJACENT DWELLING UNITS, GARAGES,OR CRAWLSPACES.13.AIR INLETS (NOT EXHAUST) SHALL BE LOCATED AWAY FROM KNOWN CONTAMINANTS.14.OCCUPIED AREAS OF MECHANICALLY VENTILATED BUILDINGS SHALL BE PROVIDED WITH AIRFILTRATION MEDIA FOR OUTSIDE AND RETURN AIR PRIOR TO OCCUPANCY THAT PROVIDES ATLEAST MERV OF 8.15.AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE CONSTRUCTION SITEUNTIL FINAL START-UP OF HEATING, COOLING AND VENTILATION EQUIPMENT, ALL DUCT ANDOTHER RELATED RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVEREDWITH TAPE, PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCINGAGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS WHICH MAY ENTER THESYSTEM PER SECTION 5.504.3 OF THE CALIFORNIA GREEN BUILDING.16.EXHAUST DUCTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS PER SEC. 504.0 CMC.17.IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW SPACE CONDITIONING SYSTEMSERVING A BUILDING OR SPACE IS OPERATED FOR NORMAL USE, BALANCE THE SYSTEM INACCORDANCE WITH THE PROCEDURES DEFINED BY THE TESTING, ADJUSTING AND BALANCINGBUREAU NATIONAL STANDARDS, NEBB PROCEDURAL STANDARDS, OR AABC NATIONALSTANDARDS.18.PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH DETAILED OPERATING ANDMAINTENANCE INSTRUCTIONS AND COPIES OF GUARANTEES/WARRANTIES FOR EACH SYSTEM.O&M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, TITLE 8,SECTION 5142, AND OTHER REGULATIONS.TITLE 24 NOTESSUPPLY DIFFUSER SCHEDULERETURN / EXHAUST REGISTER SCHEDULEDLUCMECHANICAL LEGENDSDTEXHAUST FAN SCHEDULE PACKAGED ROOFTOP UNIT SCHEDULEMECHANICAL SCHEDULE AND NOTES