My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2024 2:20:52 PM
Creation date
1/12/2023 11:04:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCING THE NEW 1 OVERFILL PREVENTION <br /> Raising The Standard In No Epoxy Sealants Required! <br /> Overfill Prevention The OPW 71 SO requires no epoxy sealants for installation. No sealants mean <br /> the quality and reliability of the installation is significantly improved, promoting <br /> From the company that brought you the the elimination of curing hassles during challenging applications, such as <br /> industry standard OPW 61 SO, OPW raises extreme temperature conditions. No delays, no mess. EVR compliance is <br /> the standard with the introduction of the assured with no time-consuming, expensive return visits to re-epoxy the valve. <br /> New 71 SO Overfill Prevention Valve– <br /> THE NEW 71S0 ELIMINATES <br /> breakthrough innovation that takes overfill THE MESS AND CURING <br /> prevention to a whole new level of HASSLES OF EPDXY SEALANTS <br /> overfill perfection. <br /> Eliminates curing issues, due to THE NEW NO EPDXY 71S0 <br /> hot or cold temperatures y PROVIDES FOR AN EASIER, <br /> HIGHER QUALITY AND MORE <br /> • Easier, quicker, installation RELIABLE INSTALLATION '000 <br /> • Higher quality, •• <br /> more reliable <br /> installation 0= <br /> California Air Resources Board <br /> • Lower costs Phase I Vapor Recovery System L. <br /> Certification(VR-102-H) <br /> • Greater protection <br /> against fugitive 'dt. <br /> emissions and <br /> pressure decay �+ <br /> Fastest flow rate in the industry <br /> The new 71 SO is a two-stage, positive <br /> shut-off valve, providing completely <br /> automatic operation with no pre-checks <br /> to perform, no resets, and no overrides <br /> to be broken or abused.The valve closes <br /> when the tank level rises to 95%capacity <br /> and provides a special by-pass valve so <br /> the tank can be filled to a maximum <br /> capacity of 98%. The 71 SO is available <br /> for direct-bury and remote applications. •The Only Vapor-Tight Overfill Valve In The Industry That Does Not <br /> Require Messy,Time-Consuming Epoxy Sealants <br /> Direct-Bury Remote-Fill • Robust Patent/Patent-Pending Design <br /> r • Reduces installation time and costs <br /> • Improves quality of installation <br /> v— <br /> • Special Patented And Patent-Pending Design Features Enable <br /> Improved EVR Compliance By Eliminating 10 Of 17 Potential Leak Paths <br /> R <br /> APP ROOVsolu'rcV..rd <br /> ED •Typical valves have 17-25 potential leak paths <br /> •Higher level of protection against fugitive emissions and pressure decay <br /> I� • Improves EVR compliance assurance by 60% <br /> •Reduces/eliminates future maintenance and/or valve replacement costs <br />
The URL can be used to link to this page
Your browser does not support the video tag.