Laserfiche WebLink
NOTE: 3M tm Fire Barrier Wrap 615+Commercial kitchen Grease Duct Systems <br /> A 1-HR RATED WALL,OR A 1-HR RATED FIRE CODE&MECHANICAL CODE DUCT IS SECURED WITH SPOT 1-or 2-Hore shaft Alternative Zero Clearance to Combustibles <br /> PANEL IS TO BE ADDED IN FRONT. WELDED TO ANGLE IRON AND Telescoping Wrap Technique With Banding For Ducts 24"or Less <br /> SECURED TO ROOF CURB. 2 REVISIONS <br /> (E)WALL <br /> 1. First layer 3M tm Fire Barrier Duct Wrap 615+ <br /> 2.Second layer 3M tm Fire Barrier Duct Wrap 615+ <br /> ROOF CURB 3.%"wide filament tape. By <br /> 3" 4.Steel banding%2"wide min.Typical for permanent fastening. <br /> ------------------------------------ <br /> NON RATEDWALL 18" 5/8"THK. GYPSUM BOARD 5. Longitudinal joint butt or min 3"overlap on inner layer, <br /> TYPE"X"ON BOTH SIDES ROOF TOP Min 3"overlap on outer layer. 4 <br /> ROOF TOP SHEATHING 6. Perimeter(lateral)joint butt or min 3"overlap on inner layer, <br /> S/S PLATE IS NEEDED FOR 0000 Min 3"overlap on outer layer. 5 <br /> CLEAN UP ONLY. IT CAN BE 18"IS NEEDED IF THIS SECTION <br /> CERAMIC TILE OR NON- L_____ _____________HOOD_____ IS NOT 1-HR BOTTOM OF 7. Metallic Commercial Cooking Exhaust Duct <br /> ROOF TOP SHEATHING <br /> COMBUSTIBLE PANEL(NO FRP) DUCT System integrity is limited by quality of installation. <br /> Ducts>24"wide require pinning on the bottom side <br /> DUCT 16 GAUGE GALV of horizontal ducts and on a minimum of one of the <br /> 6"MIN.TO wider sides of a vertical duct.Vertical ducts require <br /> rzi, <br /> x 12"MAX. <br /> UHWALL FOR THE HOOD AIR SPACE 1 4 SLOPE pinning on any side>48" 6 <br /> 3 <br /> 3M 615+ FIRE WRAP 18 18" <br /> (E)CEILING VERIFY m <br /> VERIFY AT ITE 1-HR RATED °m <br /> CEILING 18"MIN.ALL AROUND <br /> THIS DUCT AREA IS NEEDED �m <br /> FIRE WRAP WITH 3-M 615+ 1 ,ol <br /> NOTE: NOTE: <br /> INSTALL ELECTRICAL INTERLOCK FOR THE EXHAUST FAN MOTORS AND THE MAKE-UP AIR FAN. NOTE: FIRE WRAP MUST BE INSTALLED WITH IN THE ENCLOSED 7 5� <br /> CEILING AND CONTINUE TO THE TOP OF THE ROOF CURB <br /> HOODS, GREASER REMOVAL DEVICES, EXHAUST FANS, AND DUCTS SHALL HAVE A CLEARANCE OF NOT LESS <br /> THAN 18 TO COMBUSTIBLE MATERIAL. <br /> EXHAUST FAN 2 FIRE WRAP MATERIAL : 3M 615+ (PER UL LISTING 90G9 AND ICC ESR-1255) <br /> MAKE-UP AREA CAPTIVE AIRE <br /> CAPTIVE AIRE 101-0.1 NCA 24 HPFA Fire Wrap Installation Note: <br /> FRIGKING 650 FD 00 <br /> THE FIRE WRAP MUST EXTEND A p <br /> PARADET 48" Note: Duct to be telescoping LO <br /> 3M DUCT 1.. MINIMUM OF 18"ABOVE THE ROOF I.D. � <br /> GREASE DUCT SLOPE a PER FT 1 1/a x 1 1/4 ANGLE IRON WELDED D GREASE DUCT GREASE DUCT rn <br /> 16-GAUGE GALV z (SEE DETAIL) AND OTHER MBUSTIBLE INSIDE SECTION 1. The installation shall be done b facto certified installer. Or bell -type per CMC 510.2.2 <br /> OR CAPTIVE AIRE TO EXHAUST DUST ON BOTH SIDES MATERIALS y Q <br /> HOOD DUCTING f &SECURED TO ROOF CURB WITH# MALE END 2. The fire wrapprotection to be start from the hood continuous to the to of roof curb. <br /> DUCT(SEE H-4) 3M FIRE WRAP WELD AROUND p U <br /> 1 ^, 16-GA.GALV. 14x2"SCREW.(2 EACH) WELD AROUN 3.The weldingof the duct shall be first inspected and with signed approval b the mechanical <br /> SLOPE 4"PER FT � METAL DUCTING p g pp y � <br /> GREASE BOX inspector prior the installation of the fire wrap. Z <br /> ROOF TOPWe ROOF TOP ROOF TOP I.D.+0.25" O U <br /> 1/2"THREADED ROD (E)DEMISING WALL ¢ Q LU <br /> CLEAN-OUT SECURED TO CEILING Telescoping Bell -Type L <br /> N LL 2 <br /> FEMALE END <br /> L7INSTALL S/S METAL OUTSIDE SECTION I.D.+0.25" U) M } <br /> CEILING FINISH CEILING FINISH VAPORPROOF LIGHT <br /> Z_ FLASH AROUN an 16-GAUGE <br /> DIFFUSE REG r ON TOP OF HOOD IF ALUMINUM FILTERS BLACK IRON D NOTE: uJ W C <br /> IN HOOD KTHIS SPACE IS LESS BAFFLE TYPE at 450 z CVS I0 <br /> BY CHIEF Z <br /> O 6"AIR SPACE (� <br /> STAINLESS STEEL N - C) <br /> >s' UL HOOD HOOD,20-GAUGE SECURE HOOD TO EACH THE HOODS, GREASE REMOVAL DEVICES, EXHAUST FANS,AND (n w - w <br /> WALL STUD WITH 3/8" NOTE: <br /> xs"MIN. HEX SCREWS. NOTE: 1. DUCT SIZE STAYS THE SAME THROUGHOUT �� W <br /> s' 6' s' 1. DUCT SIZE DECREASES (GOING UPWARD) DUCTS SHALL HAVE A CLEARANCE OF NOT LESS THAN 18 TO W - Lu �I <br /> THE DUCT SYSTEM. 0 <br /> HOOD SPRINKLER Z <br /> L? GREASE COLLECTOR WITH EACH TELESCOPE. COMBUSTIBLE MATERIAL 3" TO LIMITED-COMBUSTIBLE `" o F- <br /> to have separate permit , <br /> b) 4'-0" 2. SMALLER (INSIDE) MALE DUCT IS ALWAYS W 2 J <br /> S/SWALLPANEL 2. SMALLER (INSIDE) DUCT SECTION S ALWAYS ABOVE OR UPHILL (ON SLOPED DUCT), TO BE MATERIAL, AND 0" TO NONCOMBUSTIBLE MATERIAL. Q a <br /> 6'HIGH X 23'MIN. ABOVE OR UPHILL (ON SLOPED DUCT), TO BE SELF-DRAINING INTO LARGER (OUTSIDE) FEMALE <br /> 0 <br /> cooKER GRIDDLE GAS COOKING SELF-DRAINING INTO LARGER (OUTSIDE) DUCT. DUCT END. o W <br /> 00 •o• EQUIPMENT,(refer to <br /> ®® floor plan onsht.A-2) TELESCOPING DUCT JOIST BEEF-TYPE DUCT JOIST (14 <br /> D/F D/F EDT I STOCK Cl) M <br /> W/T W/T POT <br /> WOK QUARRY TILE COVE BASE <br /> FLOOR FINISH FLOOR FINISH 3/8"x 6"HIGH <br /> EQUIPMENT LAYOUT GREASE DUCT JOINT DETAIL <br /> (refer to FLOOR PLAN on NO SCALE <br /> 15' UL HOOD & A-2) HOOD SIDE VIEW & MOUNTING <br /> EQUIPMENT ELEVATION DETAILS (TYP'L FOR TYPE-1 HOOD) <br /> 3M Fire Barrier Duct Wrap 615+ Commercial Z co <br /> Kitchen Grease Duct Systems (Figure 3) to <br /> Field-Fabricated 2-Hour Access Door System = U <br /> 4 HOOD SUPPORT FABRICATED „ 3 1. Access hole Q Q <br /> SEE DETAIL OF Q11/2"STEEL ROD BOILT 4x3'x/6„ ANGLE 1 w <br /> TO (E)ROOF FRAMING PLATE 2. 1/4" (6.35mm) dia. by a minimum (n <br /> MIN. 6 EA REQUIRED 1 2" 4 1 2" 6" (152.4mm) alt-threaded rods WOC <br /> ROOF A35 CLIP <br /> (N)4xBLOCKIN 3 J 3. Access door cover - 16 gauge <br /> Q15/8 LAG SCREW W/ h 5 U) <br /> 3"MIN. PENETRATION 4. Insulation pins (impaling pins)-welded (optional) 6 Lu U) <br /> TO WOOD STUD WALL 3 7 H w <br /> ° (E) ROOF 5. First layer 3M Fire Barrier Duct Wrap 615+ with ° Z z <br /> JOIST TYP. cut same size as cover 1 ° ° 8W Q <br /> 0 0 <br /> SEE DETAIL 2 SIMPSIO 6. Second layer 3M Fire Barrier Duct Wrap 615+ 1 LU N <br /> 3 CD <br /> "HU" HANGER 2x6 MINT TO MACH (E), with 1" (25.4mm) overlap on all sides O "r- <br /> SEE DETAIL <br /> ° ° ° 7. Third Lauer 3M Fire Barrier Duct Wrap 615+ with o <br /> 3/8"QJx1%2" 1/2"O THREADED ROD with 1" (25.4mm) overlap on all sides 9 <br /> A35 CLIP LAGSCREW PER SECTION 10 <br /> 8. Speed clips (optional) <br /> CEILING 3"MIN. (4 MIN.) SISTERED (N) 2X6 TO (E) 2X6 ROOF JOISTS 11 <br /> 22 GA. METAL DOUBLE STUD W/10D @ 12" O.0 AND PROVIDE A35 CLIP EACH 9. Aluminum tape covering all exposed edges HOOD DETAILS <br /> FLASHING AT SEISMIC ANCHORAGEEND TO (E) SUPPORTING BEAM 10. 4" (102mm) long steel hollow tubing to fit threaded rods Note: System integrity is limited by quality of installation. Consult current NOTES <br /> independent testing laboratories (e.g. Intertek, UL) for Design or System <br /> r2___� HODD SUPPORT- 1 11. 1/4" (6.35mm) diameter wing nuts Details. In all four overlap techniques, the perimeter overlap can occur at <br /> 1\1'__J NO SCALE 4 H O D D SUPPORT- and 1/4" (6.35mm) washers any location on the duct. <br /> S.S. _ KITCHEN HOOD NO SCALE \��� ROVp <br /> ASoygF ��c <br /> LING 3M Fire Barrier Duct Wrap 615+ Commercial <br /> Note: System integrity is limited <br /> Kitchen Grease Duct Systems (Figure 3A) by quality of installation. Consult No. <br /> Pre-Fabricated 1- or 2-Hour Access Door System current independent testing s-3o-23 <br /> laboratories (e.g. Intertek, UL) for srCivic <br /> Q1x1 �P <br /> 1/2"STEEL ROD BEYOND 1. Access hole Design or System Details. In all four gTF OF C <br /> 8 <br /> FLOOR 3j %2° overlap techniques, the perimeter <br /> LATE WASHER W/ NUT LAGSCREWS 2. 1/4 (6.35mm) dia. by a minimum p q <br /> 4"x3"x3/6" ANGLE 6" (152.4mm) alt-threaded rods overlap can occur at any location on <br /> \--COOKING APPLIANCE (4 MIN.) PLATE the duct. <br /> 3. 3M Fire Barrier Grease Duct Access Door Designed by : T.W <br /> LATERAL BRACING 1/2" Or Ductmate ULtimte Door 0 <br /> 01/4"STEEL CABLE 31, 4. Insulation pins (impaling pins)-welded 1 Date : Mar 26, 2022 <br /> @ 45° TYP. 1/295. First layer 3M Fire Barrier Duct Wrap 615+ with 3 <br /> (E) ROOF 1" (25.4mm) overlap beyond access on all sides 2 0 Scale : AS SHOWN <br /> ° <br /> CONNECT TO 3' JOIST TYP. 6. Second layer 3M Fire Barrier Duct Wrap 615+ with OPTION 1 (IMPALING PINS) <br /> ° E 101 HANGING ANGLE <br /> RAGING ANGLE TYP. SIMPSION 1 /2„ 2x JOIST TO MACH (E), cut to same size first later 5 6 7 Drawn : W.P.D. <br /> HOOD HU" HANGER 2x6 MIN. 7. Third Lauer 3M Fire Barrier Duct Wrap 615+ with ° ° ° <br /> 0 0 0 <br /> 1/2"0 THREADED ROD 1" (25.4mm) overlap beyond second layer on all sides 8 ° ° °� Job <br /> j H O D D SUPPORT- 2 PER SECTION 8. Speed clips ° ° ° ° OPTION 2(CUP-HEAD PINS) 10 <br /> ° ° 5 6 SHEET <br /> HOOD SUPPORT NO SCALE 9. Aluminum tape covering all exposed edges g 4 ° ° ° 7 <br /> TYP.(6 EA) <br /> 10. 1/4" (6.35mm) diameter wing nuts <br /> HOOD TOP VIEW and 1/4" (6.35mm) washers 1 ° ° ° ° ° <br /> NO SCALE ] HODD SUPPORT- 40 M = 1 <br /> 11. Insulation pins (cup-head pins) - welded ° <br /> NO SCALE 12. Access door cover-16 gauge cut same size as third layer of duct wrap ° <br /> KITCHEN HOOD SUPPORT DETAIL with clearance holes to match pattern of all thread rods OF SHEETS <br /> NO SCALE 43M Fire Barrier Duct Wrap <br />