My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 7:35:42 PM
Creation date
1/13/2023 8:58:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
ARCO CHEROKEE GAS & MART
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: 7/21/2022 <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />Page 6 of 6 <br />10. MQNITORING SITE PLAN <br />(late Site plan was prepared: <br />7-zl•zz <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring system Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection <br />a le rend for all smbols de icted. <br />equipment and <br />monitoring locations. Include <br />G•3 <br />t qZo <br />c.-. <br />N2a <br />Si.7e�-s d'C�a�nS <br />aGn�Y�412 <br />o-Qn Awt41� <br />ib <br />O�C� 11 <br />0- <br />Z05 Z0 <br />p5t zO� <br />L -S <br />PS:U <br />a�,il <br />yn <br />O-raay <br />p _ vcr�.,F <br />0• PWB <br />Q yr2s3 <br />C 64+5 d Cia'^j <br />\ <br />OV-AX08 <br />P <br />�.g 2d$ <br />�Qti tips <br />Sig L.t� <br />Page 6 of 6 <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.